
Purpose Circular economy adoption for construction and demolition waste (CE-CDW) management is hindered by a variety of challenges, especially in emerging economies. Previous studies have examined these barriers but often overlook the inherent uncertainty and vagueness in experts’ assessments of barrier criticality, resulting in outcomes with inconsistent levels of agreement. This study aims to evaluate and model CE-CDW barriers in the Nigerian construction industry (NCI) using fuzzy logic. Design/methodology/approach The study adopted a Delphi-based fuzzy synthetic evaluation (FSE) approach. Quantitative analyses were conducted using stabilised data from two Delphi rounds, completed by 17 NCI experts. Findings The FSE results revealed an overall CE-CDW barrier criticality index (CI) of 4.14, emphasising a very critical barrier environment. The severity of economic barriers (CI – 4.30) represents structural fault lines, while prevailing regulatory (CI – 4.13) and cultural-cognitive (CI – 4.06) conditions legitimise and sustain linear CDW management. Practical implications The results indicate that addressing a single barrier in isolation is unlikely to be transformational. Instead, coordinated interventions that couple fiscal incentives, regulatory alignment, professional capacity-building and technological support are crucial to mitigate CE-CDW constraints. Additionally, the proposed criticality model offers a pragmatic framework for prioritising CE-CDW interventions and improving CE adoption readiness. Originality/value The study draws on extended institutional theory to examine CE-CDW barriers from an emerging economy perspective. By adopting fuzzy logic, it offers a nuanced, uncertainty-aware prioritisation of barriers and a transferable approach for other contexts where CE-CDW is still in its infancy.
Purpose The purpose of this study is to address the primary challenges in evaluating the safety status of concrete gravity dam construction. These challenges primarily consist of the complexity of the evaluation index system and the imprecision in describing random and uncertain information. The objective of this paper is to propose a new, integrated, comprehensive evaluation approach to overcome the limitations of traditional evaluation methods in determining indicator importance and handling ambiguous data. Design/methodology/approach This research proposes a comprehensive evaluation method integrating the Decision-Making Trial and Evaluation Laboratory (DEMATEL), Analytic Network Process (ANP) and a cloud model. Initially, a safety evaluation index system is to be established, encompassing human, environmental, management, quality and equipment factors. Second, DEMATEL analyses causal relationships between indicators, while ANP calculates their final weights. In conclusion, the construction safety level is determined using the cloud model’s three-dimensional digital eigenvalues. This approach is empirically evaluated through a case study of the Linhai Reservoir Dam Project in Heilongjiang Province. Findings Empirical research has identified a number of key factors that contribute to the safety of dam construction. These factors include the frequency of supervision, the status of the equipment being used and the presence of cold climates. Using the proposed model, the overall safety level of the Linhai Reservoir Dam Project was assessed as “Relatively Safe.” This evaluation is in alignment with the actual conditions on-site, demonstrating the model’s effectiveness in real-world applications. Originality/value This study proposes a novel, integrated analytical framework that effectively manages complex, ambiguous and random data in safety evaluations. This research combines DEMATEL, ANP and cloud models to offer a reliable theoretical foundation and actionable practical guidance for identifying and managing safety risks in heavy construction projects. This is of particular value for infrastructure development in cold regions.
Purpose This study aims to investigate how stakeholder actions influence the cost performance of riverine construction projects in Nigeria’s Niger Delta region, with emphasis on governance practices, contractor conduct, environmental disturbances, community engagement, and broader contextual risk management. The research makes a clear distinction between cost performance and cost overruns by defining cost performance as the degree to which actual expenditure aligns with the approved budget, while cost overruns specifically refer to expenditure that exceeds the approved completion estimate or baseline. The assessment is based on archival project records comparing initial and final project costs, as well as documentary evidence linking the relationship between stakeholder actions and observable cost outcomes. Design/methodology/approach A qualitative archival research design drawing on documentary evidence from 48 completed public intervention projects carried out by intervention agencies as well as stakeholder-related data involving 57 stakeholders. Project cost records, attendance sheets, and meeting reports were carefully analyzed to determine how stakeholder actions such as contract re-awards, redesigns, pending payments, contractor conduct, and community disruptions influenced project cost performance. The analysis combined archival cost data with stakeholder documentation using thematic coding and descriptive summarization, while cross-checking records and applying standard coding processes improved analytical consistency and minimized bias. Findings Stakeholder actions were found to significantly influence cost performance in riverine construction projects. Contract re-awards and redesigns yielded positive cost performance by reducing escalation risks in certain situations. However, issues of contractor failure, pending payments, insecurity threats, force majeure events (flooding), legal battles, and community festival disturbances negatively influence cost underperformance, and out of the 48 projects reviewed, 12 had effective cost performance and 36 had poor cost performance, highlighting governance deficiencies and community disruptions as the primary causes of cost escalation. Research limitations/implications The findings are limited to 48 completed projects carried out by two government intervention agencies and stakeholder-related data involving 57 stakeholders within a specific riverine context, limiting their generalizability; future research should expand geographically and incorporate quantitative methodologies. Practical implications The research highlights that to enhance cost performance in riverine construction, it’s crucial for policymakers, intervention agencies, contractors, and host communities to work together. Key strategies include implementing transparent payment mechanisms, improved contractor screening, early stakeholder mapping, proactive community participation, adequate recording of variances, and adaptive planning for riverine threats, which are critical for mitigating cost inefficiencies. More broadly, the study shows that cost performance cannot be improved solely by technical planning but rather through accountable governance, institutional coordination, and stakeholder engagement mechanisms that are responsive to the unique sociopolitical and environmental variables of the area. Social implications Improved stakeholder coordination and transparent administration can repair community confidence, mitigate sociopolitical disturbances, and promote sustainable infrastructure delivery, ultimately improving living conditions in Niger Delta riverine communities that have historically been marginalized. Originality/value This study provides empirically grounded and region-specific evidence on the largely unexplored relationship between stakeholder actions and cost performance in Niger Delta riverine construction projects. By linking archival cost records data with stakeholder meeting evidence, this shows that cost performance in these environments is shaped by governance quality, stakeholder coordination, community engagement, environmental disruption, and proactive risk management. The study extends stakeholder theory to a complex riverine and sociopolitical construction context with wider relevance for cost management and sustainable project delivery in fragile and logistically constrained project environments across developing regions worldwide.
Purpose The construction industry relies heavily on a diverse workforce whose credentials include identity information, certifications, trade qualifications, employment histories, training records and medical documentation. Effective management of these credentials is essential to ensure workforce reliability, compliance and safety. Managing large volumes of labour credential data requires the storage efficiency and operational capabilities of relational database systems. Accordingly, this study aims to propose a hybrid labour credential management system that integrates blockchain and relational database technologies to support secure credential storage, tamper-evident verification and interoperability across multiple construction organisations. Design/methodology/approach This study adopted a design science research methodology to design, develop and evaluate the proposed system. The architecture combines relational database storage with SHA-256 hashing, Merkle-tree aggregation and blockchain anchoring mechanisms to establish a secure credential verification environment. A prototype was developed and evaluated through internal and external validation involving ten construction industry professionals. Findings The findings demonstrated that the proposed system enables secure, efficient and tamper-evident credential verification while improving transparency, accessibility and trust in labour credential management. Originality/value The prevailing labour credential management practices remain fragmented, relying on paper-based records, isolated organisational databases and partially digitised systems. Such approaches create challenges related to interoperability, credential verification, data consistency and vulnerability to manipulation, limiting the reliability and accessibility of workforce information across organisations.
Purpose This study aims to evaluate how Australian federal and state government gender equality initiatives align with the key factors influencing women’s retention in the construction industry. Despite an expanding policy landscape, women remain underrepresented, indicating persistent institutional and organisational barriers. Design/methodology/approach A five-step evaluative review integrated a PRISMA-guided systematic literature review, analysis of 30 government initiatives and expert validation involving 12 academics and industry practitioners. Guided by Feminist Institutionalism and the Policy Cycle Model, the analysis assessed alignment with four retention factors: Work Hours and Family Commitment (WHAF), Gendered Culture and Informal Rules (GCIR), Career Opportunities and Available Roles (COAR) and Perceptions of Women’s Ability (POWA). Findings Policy attention to gender equality has increased; however, alignment with women’s retention factors remains uneven. Most initiatives focus on career opportunities and workforce participation, while fewer address workplace culture and informal institutional barriers. Legislative and procurement-based initiatives include stronger accountability mechanisms than voluntary initiatives. Practical implications Improving women’s retention requires policy frameworks that integrate stronger accountability mechanisms with initiatives that promote workplace culture, flexible work practices and leadership pathways. Originality/value To the best of the authors’ knowledge, this study provides the first systematic evaluation of Australian federal and state government gender equality initiatives in relation to women’s retention in the construction industry. By integrating Feminist Institutionalism and the Policy Cycle Model, this study offers a theory-informed framework for assessing policy alignment and informing future gender equality policy development.