Received: Mar 14, 2019 Revised: Sep 24, 2019 Accepted: Dec 09, 2019 With the increased dependence on subcontracting in the construction industry, the operational relationship between main contractors and subcontractor plays an imperative role in successful project delivery. Consequently, improving this relationship increases the probability of project success and enhancing project performance. A wide range of research has confirmed that partnering improves the main contractor-subcontractor relationship. Though the positive impact of partnering on project performance is supported by a plethora of evidence, the guiding theory on practical partnering process steps is limited. The study aimed at improving subcontracting in the construction industry through a partnering process relevant to Zambia guided by factors obtained from industry expects. Questionnaire surveys and Semi-structured interview were adopted to investigate the perception of construction industry professionals and academics towards the main contractorsubcontractor relationship along with improvement factors. The findings showed that the relationship between main contractors and subcontractors on most projects in Zambia is unsatisfactory therefore justifying attention. Top factors that can enhance the main contractor-subcontractor relationship were identified. From the factors deduced and guidelines on partnering best practices, a project partnering model was developed.
Received: Sep 29, 2018 1st Revised: Nov 12, 2018 2nd Revised: Sep 30, 2019 Accepted: Dec 09, 2019 Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors–design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.
Received: Jan 10, 2018 Revised: Mar 14, 2018 Accepted: Jul 09, 2019 The management of mega construction projects which incorporate a large number of stakeholders, technologies, data, work culture etc., is cumbersome. The experts in the construction arena advocate that interface management serves as a precise tool in resolving these conflict points due to the intricate nature of the construction projects. Interface management is a current trending management practice in the construction industry which is also a beneficiary to mega/fast track projects in enhancing the project performance. The main objective of this study is to validate a model for assessing the relationships among interface management, IT applications, project performance & project benefits. The mediating effect of interface management in relationship between project performance & interfacial factors was also investigated. The research model was validated using PLS-SEM (Partial Least Square-Structural Equation Modelling) approach. Data were collected from clients, contractors, consultants in large scale projects through questionnaire survey and smart-PLS software was used to analyse the conceptual model. The research model comprises eleven hypothesis and the significance of these hypothesis were tested using Tstatistics values. The research implies that people/participants factor is greatly influenced by interface management with the path coefficient of 0.608 and also enhancement of project’s schedule performance due to the interface management is strongly appealing (Path coefficient = 0.711). The results also reveal IT application is significantly associated with interface management practice (Path coefficient =0.723) and also the effect of IT application on project performance (schedule, cost, quality & safety) is successfully mediated through interface management practice. The practical application of this validated model was done through case study. The case study aims at measuring the impact of interface management on interfacial factors and role of interface management in improving the project performance in the construction organisations.
Received: Jan 22, 2019 Revised: May 02, 2019 Accepted: May 20, 2019 Poor project performance has been noted as the bane in the construction industry globally. This paper sought to investigate, by way of literature, the performance patterns of construction projects in Kenya since independence (1963-2018). This was informed by reports of undesirable project performance in the industry. This descriptive study used available studies previously done in this subject area. In sum, literature is replete with evidence on a myriad of challenges facing the execution of projects. The study established that generally, the project performance is poor and has assumed a chronic trajectory spanning over five decades. On average, the findings reveal that 35-60% of projects initiated in Kenya face cost overruns while time overrun is most severe with 35-73% projects overrunning their schedule. In addition, the findings problematize the issue of plurality of performance measurement regimes in the construction industry. Here, it was observed that no singular construct exists to objectively measure the various facets that constitute the ‘health’ of a project. This paper has contributed to the body of knowledge by examining the performance patterns in Kenya for over fifty years while at the same time identifying the bottlenecks inherent in projects execution. Importantly, the conceptual performance efficiency framework derived in the current study presents a paradigm shift in the monitoring and evaluation of projects. To this end, an in-depth analysis is recommended on the interaction of efficiency enablers in the buildup of performance efficiency index (PEI). Similarly, a further inquiry is recommended on the integration and impact of the proposed framework in the management of projects.