The size and weight of offshore platforms have increased steadily as the search for oil and gas moves into deeper water and more hostile environments. This growth is portrayed in terms of water depth record setting projects. The capabilities and limitations of conventional construction techniques and equipment are described along with their impact on the fabrication and erection phases at construction. In the past five years, three offshore platforms have been installed in water depths approaching 1000 ft (305 m) and more with each project utilizing a different installation concept. The relationship between each of these concepts and the capacities of available equipment are explored. Future developments in water depths greatly exceeding 1000 ft (305 m) will utilize the compliant structural concepts, which require radically different installation procedures and more sophisticated equipment.
Evaluation of concrete shows that segregation, inherent in rehandling of coarse aggregate, is significantly reduced in the large mixers used in concrete production. The investigation also shows that relatively broad ranges in coarse aggregate gradation as shown by the on site test data had no measureable effect on the strength of the inplace concrete. On nuclear work the dependence on data resulting from single increment samples taken from rehandled material results in misleading information as to the actual gradation of the material in use. Application of statistical techniques used to evaluate data received from the aggregate manufacturer, from the rehandled material, and the freshly mixed concrete yields reliable information by which product control can be established and maintained.
Building contractor project control, information documentation, flow practices, and the attributes of project management personnel provide the focus for this paper. The methodology employed involves case studies of three successful general contracting firms whose annual work volumes range from $10 to 40 million. Key findings include: (1) Little written information is collected and processed pertaining to actual job progress; (2) few contractor personnel think of construction as a process which can be formally modelled; and (3) areas in need of greatest attention include subcontractor and change-order control, and forecasting time and cost to complete. Analysis of the case studies provides a set of requirements that should be met by MIS users and designers working both separately and jointly.
Numerous mathematical decision models have been formulated in an attempt to analyze construction risk. Most such efforts have failed because of the limited scope of their objective functions. This study presents field interview results substantiating the hypothesis that decision-making is multiattributed in nature, contrary to the implicit assumption of these other efforts. A theory is introduced which facilitates analysis of complex decisions and selection of consistent courses of action. An illustrative decision problem is solved, not only to explain the mechanics of the theory, but to demonstrate that construction risk is a function of competitive economics as well as project-related characteristics.