Through the statistics and analysis of the thermal control abnormal shutdown events in 2×600 MW supercritical new built units of State Power Jingmen Electric Power Generation Co.,Ltd.,the existing problem resulting in abnormal shutdown was found out.It was continuously improved and modified,and the stability and reliability of these new built units were enhanced day by day.