The ADIGE (Acceleratore Di Ioni a Grande carica Esotici) injector consists of an electrostatic 1+ beam line, equipped with ion sources able to produce a wide variety of beams, coupled to a magnetic beam line, where charge multiplication is accomplished by implementing an Electron Cyclotron Resonance (ECR) based charge breeder. The injector is totally integrated in the SPES (Selective Production of Exotic Species) beam line, to allow the post-acceleration of radioactive ions and is now in an advanced phase of installation. The electrostatic 1+beam line has been put into operation and is now producing beams from alkali metals. This contribution concerns the first results of the beam commissioning of this part of the injector, with the description of the initial debug phase and the solutions adopted to ensure a reliable and continuous operation. Preliminary results of the 1+ beam line characterization will be shown, with a comparison between simulated and measured emittances.
The ADIGE (Acceleratore Di Ioni a Grande carica Esotici) injector of the SPES (Selective Production of Exotic Species) project is now in an advanced phase of installation. Its main components have been designed following particular needs of the project: first, an Electron Cyclotron Resonance (ECR)-based Charge Breeder (SPES-CB), to boost the charge states of the radioactive ions produced at SPES and allow their post-acceleration. Then, a stable 1+ source and a complete electrostatic beam line to characterize the SPES-CB. Finally, a unique Medium Resolution Mass Spectrometer (MRMS, R=1/1000), mounted on a high voltage platform downstream the SPES-CB, to clean the radioactive beam from the contaminants induced by the breeding stage. This contribution describes the status of the injector, in particular the installation of the platform housing the MRMS, the access and safety system adopted and the first beams to be extracted from the stable 1+ source.
The ALPI linac at INFN-LNL was substantially refurbished in 2018, especially in view of its use as secondary accelerator for exotic species in the framework of the SPES project. In particular: 10 magnetic triplets were replaced with higher gradient ones; two cryomodules with quarter wave resonator were moved from the PIAVE injector to ALPI, so as to make them available both for exotic and stable beams; the cryogenic plant was renovated; the whole linac, its injector and its beam lines were eventually realigned via LASER tracking (LT). The expected outcome of the refurbishment project is a larger beam transmission (crucial for the efficient transport of the unavoidably low current exotic beams) and improved overall reliability so as to further extend the lifetime of an already 25 years old machine. The hardware commissioning of this new configuration will be reported.
Since fall 2017, the ADIGE (Acceleratore Di Ioni a Grande carica Esotici) injector of the SPES (Selective Production of Exotic Species) project entered the installation phase. The injector includes an Electron Cyclotron Resonance (ECR)-based Charge Breeder (SPES-CB) and its complete beam line, as well as a newly designed RFQ, to allow the post-acceleration of the radioactive ions produced in the so-called target-ion source-system. The injector has different peculiarities, deriving from particular needs of SPES: a complete electrostatic beam line equipped with a 1+ source for test purposes, and a unique Medium Resolution Mass Spectrometer (MRMS, R similar to 1/1000), mounted downstream the SPES-CB, to clean the radioactive beam from the contaminants induced by the breeding stage. This contribution reports about the status of the installation of the injector, describing the various technical solution adopted, and giving a realistic planning for the commission and following operation of its main parts.
The IFMIF-EVEDA RFQ is composed of 18 modules for a total length of 9.8 m and is designed to accelerate the 125 mA D⁺ beam up to 5 MeV at the frequency of 175 MHz. The RFQ is subdivided into three Super-Modules of six modules each. The Super-Modules were shipped to Rokkasho (Japan) at the beginning of 2016, pre-assembled 3 m far from the final location and tuned to reach target field flatness requirements. Just after conclusion of injector commissioning, the tuned RFQ was disassembled, moved and reassembled in the final location. After confirmation that field flatness was not affected by this movement, high power couplers were installed and tuned and all the structure was baked. Assembling, tuning and coupling results will be presented.