MANIFEST is a multi-object fibre positioner for the Giant Magellan Telescope that uses ‘Starbug’ robots to accurately position fibre units across the telescope’s focal plane. MANIFEST, when coupled to the telescope’s planned seeing-limited instruments, GMACS and GCLEF, offers access to: larger fields of view; higher multiplex gains; versatile focal plane reformatting of the focal plane via multiple integral-field-units; increased spectral resolution using image-slicers; the capability for simultaneous observations with multiple instruments; the possibility of a gravity-invariant spectrograph mounting; the potential for OH suppression via fiber systems in the near-infrared; and the versatility of adding new instruments in the future. We have now completed the pre-concept phase for MANIFEST. This phase has focused on developing the science case and requirements, further developing high risk aspects of the instrument design, designing the opto-mechanical interfaces to the GMACS and GCLEF instruments, and detailing the interfaces to the GMT.
The Giant Magellan Telescope project is proceeding with design, fabrication, and site construction. The first of the seven required 8.4-m primary mirror segments is completed and in storage, three segments are in various stages of grinding and polishing, and the fifth segment has been cast. Industry contracts are underway to complete the design of the telescope structure. Residence buildings and other facilities needed to support construction at the Las Campanas site in Chile are complete. Hard rock excavation is imminent in preparation for the pouring of concrete for the telescope pier and other foundations. Computational fluid dynamics analysis is informing the design of the telescope enclosure, and further construction work packages are being readied for tender. Seismic design considerations have resulted in the incorporation of a seismic isolation system into the telescope pier, as well as modifications to the primary mirror support system. Designs for the fast-steering and adaptive secondary mirrors, science instruments, and other subsystems are maturing. Prototyping is underway in various aspects, including on-sky testing of wavefront sensing and control elements, and the telescope metrology system. Our fabrication and construction schedule calls for engineering first light with a subset of primary mirror segments in late 2023, with buildout to the full configuration occurring in stages, paced by the availability of primary mirror segments and other components.
MANIFEST is a multi-object fibre facility for the Giant Magellan Telescope that uses ‘Starbug’ robots to accurately position fibre units across the telescope’s focal plane. MANIFEST, when coupled to the telescope’s planned seeinglimited instruments, offers access to larger fields of view; higher multiplex gains; versatile focal plane reformatting of the focal plane via integral-field-units; image-slicers; and in some cases higher spatial and spectral resolution. The TAIPAN instrument on the UK Schmidt Telescope is now close to science verification which will demonstrate the feasibility of the Starbug concept. We are now moving into the conceptual development phase for MANIFEST, with a focus on developing interfaces for the telescope and for the instruments.
The GMT-Consortium Large Earth Finder (G-CLEF) is an instrument that is being designed to exceed the state-of-the-art radial velocity (RV) precision achievable with the current generation of stellar velocimeters. It is simultaneously being designed to enable a wide range of scientific programs, prominently by operating to blue wavelengths (< 3500Å). G-CLEF will be the first light facility instrument on the Giant Magellan Telescope (GMT) when the GMT is commissioned in 2023. G-CLEF is a fiber-fed, vacuum-enclosed spectrograph with an asymmetric white pupil echelle design. We discuss several innovative structural, optical and control system features that differentiate G-CLEF from previous precision RV instruments.
The payload portion of James Web Space Telescope (JWST) consists of a deployable, three mirror anistigmat, telescope and an Integrated Science Instrument Model (ISIM) that contains the scientific instruments. This paper describes the overall process and strategy of aligning the Observatory in an efficient manner that reduces risk and strives to be tolerant of faults in the system. A process has been developed consisting of ground calibration of the instruments and alignment testing of the fixed optics to ensure that the telescope is alignable in space. The overall architecture of the alignment process and the processes to safely and efficiently conduct the optical commissioning is described.
The James Webb Space Telescope is a large deployable cryogenic space telescope that is pointed on the sky by control of the attitude of the integrated spacecraft and telescope. The primary mirror has 18 hexagonal Primary Mirror Segment Assemblies (PMSA) that are deployed; 3 on each of two deployable wings, and 12 on a fixed central section of the Primary Mirror Backplane Support Structure. The Secondary Mirror (SM) is deployed from the Secondary Support Structure that folds out from the backplane, and the complete Telescope and Integrated Science Instrument Module are deployed in extension from the spacecraft. The resulting tolerances will result in a "first light" image that has a spread array of 18 individual images for each point source located within the field of view. The initial attitude of the spacecraft will be adjusted to point the telescope to a desired star field for the initial WFSC commissioning process. The deployment tolerances will result in the telescope field of view being offset from the desired location. By use of a sequence of pointings, a mosaic "first light" image that includes the multiplicity of the 18 misaligned segment images may be created that will allow the calibration of the offset between the telescope boresight and the spacecraft attitude control system, allowing subsequent pointing to be done accurately to a fraction of the field of view of the instruments using spacecraft attitude control.
The James Webb Space Telescope (JWST) is a segmented deployable telescope, utilizing 6 degrees of freedom for adjustment of the Secondary Mirror (SM) and 7 degrees of freedom for adjustment of each of its 18 segments in the Primary Mirror (PM). When deployed, the PM segments and the SM will be placed in their correct optical positions to within a few mm, with accordingly large wavefront errors. The challenge, therefore, is to position each of these optical elements in order to correct the deployment errors and produce a diffraction-limited telescope, at lambda=2 mu m, across the entire science field. This paper describes a suite of processes, algorithms, and software that has been developed to achieve this precise alignment, using images taken from JWST's science instruments during commissioning. The results of flight-like end-to-end simulations showing the commissioning process are also presented.
From its orbit around the Earth-Sun second Lagrange point some million miles from Earth, the James Webb Space Telescope (JWST) will be uniquely suited to study early galaxy and star formation with its suite of infrared instruments.([1]) To maintain exceptional image quality using its 6.6 meter segmented primary mirror, wavefront sensing and control (WFS&C) is vital to ensure the optical alignment of the telescope throughout the mission. After deployment of the observatory structure and mirrors from the "folded" launch configuration, WFS&C is used to align the telescope([2]), as well as maintain that alignment. WFS&C verification includes the verification of the software and its incorporated algorithms, along with the supporting aspects of the integrated ground segment, instrumentation, and telescope through increasing levels of assembly. The software and process are verified with the Integrated Telescope Model (ITM), which is a Matlab/Simulink integrated observatory model which interfaces to CodeV/OSLO/IDL. In addition to lower level testing, the Near-Infrared Camera ([3]) (NIRCam) with its wavefront sensing optical components is verified with the other instruments with a cryogenic optical telescope simulator (OSIM) before moving on to the final WFS&C testing in Chamber A at the Johnson Space Center (JSC) where additional observatory verification occurs.
NASA's Technology Readiness Level (TRL)-6 is documented for the James Webb Space Telescope (JWST) Wavefront Sensing and Control (WFSC) subsystem. The WFSC subsystem is needed to align the Optical Telescope Element (OTE) after all deployments have occurred, and achieves that requirement through a robust commissioning sequence consisting of unique commissioning algorithms, all of which are part of the WFSC algorithm suite. This paper identifies the technology need, algorithm heritage, describes the finished TRL-6 design platform, and summarizes the TRL-6 test results and compliance. Additionally, the performance requirements needed to satisfy JWST science goals as well as the criterion that relate to the TRL-6 Testbed Telescope (TBT) performance requirements are discussed.
The primary mirror of the James Webb Space Telescope (JWST) consists of 18 segments and is 6.6 meters in diameter. A sequence of commissioning steps is carried out at a single field point to align the segments. At that single field point, though, the segmented primary mirror can compensate for aberrations caused by misalignments of the remaining mirrors. The misalignments can be detected in the wavefronts of off-axis field points. The Multifield (MF) step in the commissioning process surveys five field points and uses a simple matrix multiplication to calculate corrected positions for the secondary and primary mirrors. A demonstration of the Multifield process was carried out on the JWST Testbed Telescope (TBT). The results show that the Multifield algorithm is capable of reducing the field dependency of the TBT to about 20 nm RMS, relative to the TBT design nominal field dependency.
NASA's Technology Readiness Level (TRL)-6 is documented for the James Webb Space Telescope (JWST) Wavefront Sensing and Control (WFSC) subsystem. The WFSC subsystem is needed to align the Optical Telescope Element (OTE) after all deployments have occurred, and achieves that requirement through a robust commissioning sequence consisting of unique commissioning algorithms, all of which are part of the WFSC algorithm suite. This paper identifies the technology need, algorithm heritage, describes the finished TRL-6 design platform, and summarizes the TRL-6 test results and compliance. Additionally, the performance requirements needed to satisfy JWST science goals as well as the criterion that relate to the TRL-6 Testbed Telescope (TBT) performance requirements are discussed.
The one-meter Testbed Telescope (TBT) has been developed at Ball Aerospace to facilitate the design and implementation of the wavefront sensing and control (WFSC) capabilities of the James Webb Space Telescope (JWST). We have recently conducted an "end-to-end" demonstration of the flight commissioning process on the TBT. This demonstration started with the Primary Mirror (PM) segments and the Secondary Mirror (SM) in random positions, traceable to the worst-case flight deployment conditions. The commissioning process detected and corrected the deployment errors, resulting in diffraction-limited performance across the entire science FOV. This paper will describe the commissioning demonstration and the WFSC algorithms used at each step in the process.
The Keck Observatory began science observations with a laser guide star adaptive optics system, the first such system on an 8–10 m class telescope, in late 2004. This new capability greatly extends the scientific potential of the Keck II Telescope, allowing near–diffraction‐limited observations in the near‐infrared using natural guide stars as faint as 19th magnitude. This paper describes the conceptual approach and technical implementation followed for this system, including lessons learned, and provides an overview of the early science capabilities.
The opto-mechanical design of the 6.6 meter James Webb Space Telescope(1) (JWST), with its actively-controlled secondary and 18-segment primary mirror, presents unique challenges from a system engineering perspective. To maintain the optical alignment of the telescope on-orbit, a process called wavefront sensing and control (WFS & C) is employed to determine the current state of the mirrors and calculate the optimal mirror move updates. The needed imagery is downloaded to the ground, where the WFS & C algorithms to process the images reside, and the appropriate commands are uploaded to the observatory. Rather than use a dedicated wavefront sensor for the imagery as is done in most other applications, a science camera is used instead.For the success of the mission, WFS & C needs to perform flawlessly using the assets available among the combination of separate elements (ground operations, spacecraft, science instruments, optical telescope, etc.) that cross institutional as well as geographic borders. Rather than be yet another distinct element with its own set of requirements to flow to the other elements as was originally planned, a novel approach was selected. This approach entails reviewing and auditing other documents for the requirements needed to satisfy the needs of WFS & C. Three actions are taken: (1) when appropriate requirements exist, they are tracked by WFS & C; (2) when an existing requirement is insufficient to meet the need, a requirement change is initiated; and finally (3) when a needed requirement is missing, a new requirement is established in the corresponding document. This approach, deemed a "best practice" at the customer's independent audit, allows for program confidence that the necessary requirements are complete, while still maintaining the responsibility for the requirement with the most appropriate entity.This paper describes the details and execution of the approach; the associated WFS & C requirements and verification documentation; and the implementation of the primary database tool for the project, DOORS (Dynamic Object-Oriented Requirements System).
From its orbit around the Earth-Sun second Lagrange point some million miles from Earth, the James Webb Space Telescope (JWST) will be uniquely suited to study early galaxy and star formation with its suite of infrared instruments. To maintain exceptional image quality using its 6.6 meter segmented primary mirror, wavefront sensing and control (WFS&C) is vital to ensure the optical alignment of the telescope throughout the mission. WFS&C design architecture includes using the Near-Infrared Camera (NIRCam) to provide imagery for ground-resident image processing algorithms which determine the optimal alignment of the telescope. There are two distinct mission phases for WFS&C, both of which use algorithms and NIRCam imagery to determine the required segment updates. For the first phase, WFS&C commissioning, the telescope is taken from its initial deployed state with each of the 18 primary mirror segments acting like independent telescopes, to its final phased state with each segment acting in concert as a part of a single mirror. The second phase, Wavefront Monitoring and Maintenance, continues for the rest of the mission. Here the wavefront quality is evaluated, and when needed, the mirror positions are updated to bring it back to an optimal configuration. This paper discusses the concept of operations for the commissioning and on-going maintenance of the telescope alignment using WFS&C.
The optical system of the James Webb Space Telescope (JWST) is split between two of the Observatory's element, the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM). The OTE optical design consists of an 18-hexagonal segmented primary mirror (25m(2) clear aperture), a secondary mirror, a tertiary mirror, and a flat fine steering mirror used for fine guidance control. All optical components are made of beryllium. The primary and secondary mirror elements have hexapod actuation that provides six degrees of freedom rigid body adjustment. The optical components are mounted to a very stable truss structure made of composite materials. The OTE structure also supports the ISIM. The ISIM contains the Science Instruments (SIs) and Fine Guidance Sensor (FGS) needed for acquiring mission science data and for Observatory pointing and control and provides mechanical support for the SIs and FGS. The optical performance of the telescope is a key performance metric for the success of JWST. To ensure proper performance, the JWST optical verification program is a comprehensive, incremental, end-to-end verification program which includes multiple, independent, cross checks of key optical performance metrics to reduce risk of an on-orbit telescope performance issues. This paper discusses the verification testing and analysis necessary to verify the Observatory's image quality and sensitivity requirements. This verification starts with component level verification and ends with the Observatory level verification at Johnson Space Flight Center. The optical verification of JWST is a comprehensive, incremental, end-to-end optical verification program which includes both test and analysis.
The one-meter Testbed Telescope (TBT) has been developed at Ball Aerospace to facilitate the design and implementation of the wavefront sensing and control (WFS&C) capabilities of the James Webb Space Telescope (JWST). The TBT is used to develop and verify the WFS&C algorithms, check the communication interfaces, validate the WFS&C optical components and actuators, and provide risk reduction opportunities for test approaches for later full-scale cryogenic vacuum testing of the observatory. In addition, the TBT provides a vital opportunity to demonstrate the entire WFS&C commissioning process. This paper describes recent WFS&C commissioning experiments that have been performed on the TBT.
The W. M. Keck Observatory Adaptive Optics (AO) team recently celebrated a milestone first AO-corrected image with the new Laser Guide Star (LGS) system. This paper details focus and pointing changes implemented for the LGS AO system. The combination of variable sodium altitude, elevation-dependent distance to the LGS, off-axis projection, and equipment flexure require both focus and pointing adjustments to keep the laser spot located and its size minimized on the wavefront sensor. We will describe the current approach to LGS focus and pointing-compensation adjustments, and provide some insight into issues seen thus far during engineering activities at the W. M. Keck Observatory.