Superconducting (SC) tokamak JT-60SA plays an essential role in fusion research and development by supporting and complementing the ITER project, providing directions to the DEMO design activity and fostering next generation scientists and engineers. Since the short circuit incident at the terminal joints of equilibrium field coil #1 during the integrated commissioning (IC) in March 2021, both EU and JA implementing agencies (IAs) have examined how to ensure safe operation of JT-60SA by mitigating the risk of possible discharge occurrence inside the cryostat. Based on the experience of the global Paschen tests, the IAs have established a strategy of risk mitigation measures, which is a combination of (i) reinforcement of insulation, (ii) avoiding unnecessary voltage application to the coil systems and (iii) immediate de-energization of the coils when deteriorated vacuum conditions are detected. Thanks to the considerable efforts of the Integrated Project Team members, the IC restarted in May 2023. After confirmation of the SC state of the coil systems (TF, EF and CS), the coil energization test and the plasma operation phase 1 (OP-1) started. The first plasma was successfully achieved on 23 October 2023 with a limited value of voltage and current applied to the coils. The plasma configuration control was also confirmed with low plasma current and low auxiliary heating power conditions. Based on the IO-F4E-QST collaboration, activities of JT-60SA have been shared with the IO and provided an important lesson for ITER assembly and commissioning, and will provide an outstanding contribution to fusion research at large. After OP-1, maintenance & enhancement phase 1 (M/E-1) starts from January 2024, in which in-vessel components are installed, and heating and diagnostic systems are extensively upgraded to allow a high power heating experiment planned in OP-2. In order to make the best use of JT-60SA, a newly organized JT-60SA experiment team will refine the research plan for the future high heating power operation phase.
ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system. The 16.5 MW expected neutral beam power per injector is several notches higher than worldwide existing facilities. A Neutral Beam Test Facility (NBTF) was established at Consorzio RFX, exploiting the synergy of two test beds, SPIDER and MITICA. SPIDER is dedicated to developing and characterizing large efficient negative ion sources at relevant parameters in ITER-like conditions: source and accelerator located in the same vacuum where the beam propagates, immunity to electromagnetic interferences of multiple radio-frequency (RF) antennas, avoidance of RF-induced discharges on the outside of the source. Three years of experiments on SPIDER have addressed to the necessary design modifications to enable full performances. The source is presently under a long shut-down phase to incorporate learnings from the experimental campaign. Parallelly, developments on MITICA, the full-scale prototype of the ITER NBI featuring a 1 MV accelerator and ion neutralization, are underway including manufacturing of in-vessel components, while power supplies and auxiliary plants are already under final testing and commissioning. Integration, commissioning and tests of the 1MV power supplies are essential for this first-of-kind system, unparalleled both in research and industry field. The integrated test to confirm 1MV output by combining invertor systems, DC generators and transmission lines extracted errors/accidents in some components. To realize a concrete system for ITER, solutions for the repair and the improvement of the system were developed. Hence, NBTF is emerging as a necessary facility, due to the large gap with existing injectors, effectively dedicated to identify issues and find solutions to enable successful ITER NBI operations in a time bound fashion.
Beam optics of the ITER prototype accelerator with 88 mm acceleration gap length has been examined through H - beam acceleration tests at the ITER target beam perveance. The beam optics has been examined for beam energies up to 790 keV under the ITER target perveance. The total grid heat load was successfully reduced to 10 %, which was lower than the allowable value of 15 %. The beam emittance of the ITER perveance has been measured for the first time by using newly developed emittance measurement system consisting of carbon-fiber-composite (CFC) plate with pin-holes. The emittance of 790 keV H - beam shows the divergence angle of the beam core is satisfied with the ITER requirement of <7 mrad. Measurement at the beam periphery was made possible by modifying the pin-hole size of pepper-pot apertures, and the observed divergent components were 20 mrad. The ratio of the diverged beam became lower with the increase of the beam energy. This result contributes the design of the ITER accelerator and the beam line components.
Reverse calculation of negative ion trajectory based on the measured beam emittance has been performed for the first time in multi-stage accelerator in order to reconstruct negative ion profile near meniscus, which has been a long-term issue for negative ion sources. According to reverse calculation, negative ions are mainly extracted from the periphery of extraction area, and the particles extracted from the aperture edge is lost on acceleration grids. By taking into account the lost component with reconstructed negative ion profile, the negative ion trajectory became consistent with observed beam traces on the acceleration grids. This result can be applied directly to the design of ITER accelerator as well as the other Cs-seeded negative ion sources.
The electrical insulation of the Megavolt ITER Injector and Concept Advancement (MITICA) beam source (BS) at 1 MV in vacuum is a challenging issue, which could not be fully addressed so far on the basis of experimental results and of theoretical models available in literature. A specific high-voltage (HV) test campaign is being prepared to validate and optimize the voltage holding capability of the BS insulation under realistic conditions, using full-size mockup electrodes reproducing in detail the geometry of the BS and accelerator. The proposed test strategy will address both the single-gap and the multistage insulation, so as to obtain a verification of voltage holding at 1 MV before the installation of the real components. This approach is intended to reduce the risk related to the HV insulation at 1 MV and, if necessary, to allow the development of effective corrections. In this article, the test motivations and requirements are defined, and the electrode implementation and diagnostic setup are described. Finally, the test configurations and the experimental procedure are discussed.
As a challenge to measure the extraction surface of the negative ion beam, a laser Thomson scattering system with high spatial resolution was applied to a weakly ionized plasma in a negative ion source for the first time. The first target was to measure electron density around extraction region because shape of the extraction surface can be estimated by electron spatial profile. However, stray light by injected laser, filament and plasma was too intense compared to signal from the low density region. To solve this, a triple grating spectroscopy and a multilayer black screen were introduced, and the laser spot size was minimized to reduce slit sizes of the spectroscopy. As a result, electron density was successfully measured accurately in low density region. From an error estimation, measurement of electron density 3 × 10 16 m -3 with spatial resolution of 0.5 mm at extraction region can be realized with accumulation of signals from multiple laser shots. This system can contribute to the understanding of the mechanism of formation of the extraction surface, which is a long-term issue in the negative ion source.
A beam optics study using the ITER-relevant high intense negative ion beams, such as 1 MeV, 200 A/m2, has been performed experimentally and analytically using a multi-aperture and five-stage accelerator. Initially, multi-beamlets generated from this accelerator were deflected in various directions due to the magnetic field and space charge repulsion between beams and showed various divergences. These had limited the pulse length and the beam energy. Compensation methods of the beamlet deflections have worked effectively and contributed to achieving the ITER requirement, the divergence angle of <7 mrad, and the deflection angle of <1 mrad for 1 MeV beam. The beam pulse has been gradually extended from 1 to 100 s and is now going to a longer pulse based on these results. One of the remaining issues is to understand and suppress peripheral components of the beam, namely, the halo, and to reduce the local heat loads observed around the aperture edge. This halo component has been successfully distinguished from the beam core by using a newly developed beam emittance measurement system for high intense beams. By combining this measured beam emittance and the beam simulation, it was clarified for the first time that the halo components are generated in an area of 1 mm width from the aperture edge.
In the negative-ion-based neutral beam injector (N-NBI) of JT-60SA, a hydrogen negative ion beam with energy of 500 keV and a current density of 154 A m −2 for 118 s has been successfully demonstrated. This achievement exceeds the requirements (500 keV, 130 A m −2 , 100 s) for the first time. To maintain stable negative ion production for a long pulse, the optimal temperatures of the chamber wall and plasma grid were analytically examined and were experimentally demonstrated. It was confirmed that the temperature during the beam pulse should be <50 °C for the chamber wall and >200 °C for the plasma grid. Damage to the filament cathode due to an abnormal discharge, so-called arcing, has been mitigated by developing a fast cut-off system of the arc current for around 100 μ s after the arcing. To maintain sufficient voltage holding capability and to reduce the grid heat load due to the beam in the accelerator, techniques developed for the beam acceleration have been applied to this test. As a result of the integration of these techniques, a stable beam over 100 s has been demonstrated successfully. This is the first achievement over a 100 s stable beam with intensity of >75 MW m −2 , which is the required practical level in the N-NBI. These results contribute to the coming NBI system for ITER and DEMO.
A protection system of ion source components from local abnormal discharge has been developed with ITER-class filament-driven negative ion source for high power and stable long-term operation. Protection from unpredictable discharge is a common issue for filament and RF-driven ion sources. To understand how fast should be cut off the discharge, threshold energy not to cause critical damage on the filament was investigated. The experimental exploration concluded that the energy less than 1.87 J or fast cut-off faster than 343 μs is the threshold for the robust protection of the filaments. A developed system successfully detected and cut off the discharge at 100 μs under noisy environments with the high current power supply. Moreover, the detection system is remotely adjustable. Such versatile protection system can contribute to any abnormal discharges in high current system including various ion sources, gyrotron, and high voltage components.
The voltage holding capability of the MITICA Beam Source at 1 MV is a very challenging issue, which could not be fully addressed so far on the basis of experimental results and of theoretical models available in literature. This paper describes a specific HV test campaign which is planned to be implemented in the MITICA Vacuum Vessel using mock-up electrodes reproducing in detail the geometry of the Beam Source and Accelerator. The test set-up will incorporate all essential features both of the single-gap and of the multi-stage insulation, so as to obtain reliable data on voltage holding at 1 MV before the installation of the real components. This approach is intended to reduce the risk related to the HV insulation at 1 MV and, if necessary, to allow to develop the most effective solutions. The tests will be performed in the MITICA Vessel (already available in the NBTF site) both in vacuum and in low-pressure gas. In the paper, the test strategy and requirements are first introduced. Then the sequence of test configurations is defined. Finally, some design solutions for the electrode realization are described and a preliminary plan together with a list of test equipment is given.
It is a widely recognized phenomenon that, in negative ion sources for NBI, the magnetic fields in the source cause an asymmetry of the current density at the meniscus, which affects the beam optics. In order to achieve a more realistic estimation of the negative ion beam optics, the ion current density profile at the beamlet meniscus is sometimes assumed to be non-symmetric with respect to the beamlet axis. The new hypothesis tested in this paper is an empirical law obtained by recent investigations on a similar Kamaboko ion source, which relates this asymmetry to the magnetic field strength at the meniscus and to the power injected in the ion source. For the first time this hypothesis is used to directly and correctly predict the value of the beamlet deflection. The MeV ion source Test Facility (MTF) is a high voltage negative ion beam accelerator dedicated to fusion experiments in QST, Naka, Ibaraki, Japan. MTF can be operated as a three- or five-stage multi-aperture accelerator with a configuration and beam energy comparable to the future ITER NBI. In 2019, experiments were conducted on MTF aiming at accelerating a H- beam with high energy and good optics for a long duration of the beam (around 100 s). These experiments allowed to measure the beamlet divergence and deflection as well as the heat loads due to particle impinging on the accelerator grids, over a wide range of operating parameters. The predictions of several beam simulation codes (Opera, COMSOL, SLACCAD, EAMCC3D) have been compared to the experimental measurements, which allows to obtain a good agreement in terms of beam optics and a fair agreement in terms of heat loads.
To reach fusion conditions and control the plasma configuration in ITER, the next step in tokamak fusion research, two neutral beam injectors (NBIs) will supply 16.5 MW each, by neutralizing accelerated negative hydrogen or deuterium ions. The requirements of ITER NBIs (40A/1 MeV D-ions for <1 h, 46A/870 keV H-ions for <1000 s) have never been simultaneously attained. So in the Neutral Beam Test Facility (NBTF, Consorzio RFX, Italy) the operation of the full-scale ITER NBI prototype (MITICA) will be tested and optimised up to full performances, focussing on accelerator (including voltage holding), beam optics, neutralisation, residual ion removal. The NBTF includes also the full-scale prototype of the ITER NBI source with 100 keV particle energy (SPIDER), for early investigation of: negative ion production and extraction, source uniformity, negative ion current density and beam optics. This paper will describe the main results of the first two years of SPIDER operation, devoted to characterizing plasma and beam parameters, including investigation of RF-plasma coupling efficiency and magnetic filter field effectiveness in reducing co-extracted electrons. SPIDER is progressing towards the first caesium injection, which aims at increasing the negative ion density. A major shutdown, planned for 2021, to solve the issues identified during the operation and to carry out programmed modifications, will be outlined. The installation of each MITICA power supply and auxiliary system is completed; in-vessel mechanical components are under procurement by Fusion for Energy (F4E). Integration, commissioning and test of the power supplies, procured by F4E and QST, as the Japanese Domestic Agency (JADA), will be presented. In particular, 1.0MV insulating tests were carried out step-by-step and successfully completed. In 2020 integrated tests of the power supplies on the accelerator dummy load started, including the assessment of their resilience to accelerator grid breakdowns using a short-circuit device located in vacuum. The aggressive programme, to validate the NBI design at NBTF and to meet ITER schedule (requiring NBIs in operation in 2032), will be outlined. Unfortunately, in 2020 the coronavirus disease infection affected the NBTF activities. A solution to proceed with integrated power tests despite the coronavirus is presented.
A scaling technique has been developed in order to predict the voltage holding capability of the world-largest electrostatic accelerator for fusion application having a long gap vacuum insulation around 1 m with large surface area of more than 6 m2. One of critical issues for design of such large-size accelerator is the development of the prediction model based on the experimental results. For this purpose, the 1/5 scale mockup has been developed, which is composed of the 5-stage accelerator with the high voltage bushing in the vacuum vessel. Direct comparison of the sustainable voltages in the 1/5 scale and full-scale high voltage busing only shows that a voltage scaling in 1/5 scale size is 55%. It was found that the voltage scaling is consistent with the prediction based on the empirical scaling according to the surface area and gap length. As a result, the voltage holding capability of the 1/5 scale mockup is 400 kV in the experiment, which indicates an estimation of 720 kV in full-scale with a real configuration. This is the first experiment-based prediction of the voltage holding capability for the largest accelerator for ITER. The improvement of the voltage holding capability has been already planned by using multi-layer electrostatic shields. In such experiment, the developed scaling technique is useful to predict the voltage holding capability for large vacuum components which can not be easily tested.
To realize stable negative ion beams for 100 s required in the neutral beam injector of JT-60SA, a physical model to control cesium (Cs) distribution inside the negative ion source has been developed in order to maintain the stable negative ion production at the plasma grid (PG) surface with Cs. In this work, to quantitatively evaluate Cs coverage on the PG, a three-dimensional Cs transportation code was introduced to consider the spatial Cs distribution in the source. The spatial temperature distribution of the chamber wall was also introduced in this model. As a result, the reasonable variation of the Cs coverage for 100 s was obtained, compared to that in the initial model. Based on the modified model, the operational temperature of the chamber wall was proposed to be less than 60 °C to suppress the desorption of Cs in the chamber wall and to sustain the stable negative ion production. In addition, it was also suggested that a slightly higher wall temperature before the operation leads to a decrease in the amount of Cs stored at the chamber wall, resulting in suppression of Cs consumption in the ion source.
In multi-beamlet negative ion accelerators for neutral beam injectors, the transverse magnetic field necessary for suppressing the co-extracted electrons induces a deflection of the negative ion beamlets that must be corrected. For the design, particle-tracing simulation codes are used to compute ion trajectories and optical properties of the beamlets in the acceleration stage. In these codes, uniform boundary conditions are normally assumed for the ion current density distribution at the surface (called meniscus), where negative ions are extracted from the plasma and form beamlets, which are accelerated across the apertures of the accelerator grids. Recently, experimental campaigns dedicated to the accurate measurement of the beamlet deflection in the acceleration phase revealed higher deflection than foreseen by simulations. In this work, we demonstrate that an agreement with the experimental data can be obtained by incorporating in the numerical simulations a non-radially symmetric distribution of the ion current density extracted across the meniscus surface. In the first part, the asymmetry of the ion current density at the meniscus is studied in an empirical way, by analysing and fitting the experimental results obtained with different operating parameters. In the second part, we show that the ion current asymmetry estimated by this procedure is well consistent with the flow pattern of H(-)ions calculated in the meniscus zone using a detailed particle in cell (PIC) model of the ion source in the presence of transverse magnetic field.
JT-60SA, the largest tokamak that will operate before ITER, has been designed and built jointly by Japan and Europe, and is due to start operation in 2020.Its main missions are to support ITER exploitation and to contribute to the demonstration fusion reactor machine and scenario design.Peculiar properties of JT-60SA are its capability to produce long-pulse, high-β, and highly shaped plasmas.The preparation of the JT-60SA Research Plan, plasma scenarios, and exploitation are producing physics results that are not only relevant to future JT-60SA experiments, but often constitute original contributions to plasma physics and fusion research.Results of this kind are presented in this paper, in particular in the areas of fast ion physics, highbeta plasma properties and control, and non-linear edge localised mode stability studies.
This study, following Japanese Registry of NeuroEndovascular Treatment 1 and 2 (JR-NET 1 & 2), shows an annual trend of cases including adverse events and clinical outcomes at 30 days after NET. JR-NET3 was registered by 749 cumulative total number of physicians, certified by the Japanese Society of Neuroendovascular Therapy in 166 centers, between 2010 and 2014. Medical information about the patients was anonymized and retrospectively registered through a website. A total of 40,177 patients were recruited, 632 patients were excluded because data of preprocedural status were not available. So we analyzed 39,545 patients retrospectively. The proportion of octogenarians is increasing year-by-year and 14.7% in 2014 compared with 10.4% in 2010. Most frequent target disease is intracranial aneurysm. For the proportion of the treatment of intracranial aneurysm, 50.0% in 2010, but that has decreased to 44.8% in 2014. However, number of procedures were increased from 3150 in 2010 to 3419 in 2014. Although before the positive clinical evidence of mechanical thrombectomy for acute ischemic stroke (AIS) was established, the proportion of endovascular treatment for AIS increased 13.8% in 2014 compared with 6.3% in 2010. The number of patients requiring neuroendovascular treatment in Japan is increasing since 2010-2013, but that declined a little in 2014 caused by study operation suspended at the end of 2013. The outcomes of such therapy are clinically acceptable. Details of each type of treatment will be investigated in sub-analyses of the database.
For the realization of the ITER neutral beam (NB) system, a method for achieving the acceleration voltage of 1 MV for the vacuum insulated beam source (VIBS) has been developed. Additionally, the design basis for the 1 MV vacuum insulation has also been developed by integrating previous empirical scaling of the voltage holding capability for plane and coaxial electrodes with new scaling for the corner region where the locally-concentrated electric field is generated. The scaling clarified that a product of electric field and voltage obtained by electric field analysis in the beam source vessel was much higher than the allowable level. Therefore, in order to improve the voltage holding capability, electrostatic shields having intermediate potential have been proposed. Consequently, it was found that the VIBS needs to be surrounded by more than three intermediate shields instead of a single gap insulation of 1 MV. Reliability of the design basis of the developed intermediated shields has been experimentally verified by improving the 1.3 m single gap insulation in the voltage holding test. As a result, the sustainable voltage has been significantly improved from 0.7 MV with the single gap to 1 MV with shielding up to the power supply limit. This result ensures the realization of the 1 MV VIBS in the ITER NB system.
In the framework of the collaboration between Consorzio RFX (Padova, Italy) and QST (Naka, Japan) two experimental campaigns have been organized on the Negative Ion Test Stand (NITS) in Naka, employing an ITER-like multi-beamlet configuration. These campaigns were aimed at compensating for the undesired magnetic deflection of the ion beam. The experiments have clarified the influence of operating parameters on the optical properties of the ion beam. The physical phenomena acting on the optics have been investigated, in particular the effect of an asymmetry of the ion current density at meniscus. Comparisons with simulations have been made and the modeling has been improved consequently. During the second experimental campaign, a perfect compensation of the ion deflection has been achieved.