The potential energy savings from occupancy lighting control depends primarily on the potential ''wasted-light'' hours associated with occupant characteristics and job functions. This factor is certainly variable and very hard to assess. Potential savings also depend on specific settings and sensitivities of lighting control equipment. This paper assesses the effect of occupant characteristics on potential energy savings from the use of lighting occupancy sensor control. It also presents data describing the interaction among these occupant characteristics and equipment settings as related to energy savings.The study involved placing sensor test equipment in 154 sample spaces in eight office and laboratory buildings for a total of more than 54,700 test hrs. From the data collected, estimates were derived of potential wasted lighting operation relative to space and occupant characteristics. These space and occupant parameters, historically difficult to assess and generally ignored or assumed by the lighting controls industry, greatly affect sensor performance. The study also explored additional savings possible from more effective sensor-equipment adjustment.The study results indicate the actual field-measured potential energy savings associated with differing space and occupant types. These data are useful in assessing cost-effective use of occupancy sensor lighting control. This information, historically unavailable, is an integral part of energy assessment and retrofit decisions. The results also present quantitative insight into the now unattainable energy savings associated with current equipment limitations.
The U.S. Navy commissioned Pacific Northwest Laboratory (PNL) to revise and/or update the Navy Utilities Targets Manual, NAVFAC MO-303 (U.S. Navy 1972b). The purpose of the project was to produce a current, applicable, and easy-to-use version of the manual for use by energy and facility engineers and staff at all Navy Public Works Centers (PWCs), Public Works Departments (PWDs), Engineering Field Divisions (EFDs), and other related organizations. The revision of the MO-303 manual involved developing a methodology for estimating energy consumption in buildings and ships. This methodology can account for, and equitably allocate, energy consumption within Navy installations. The analyses used to develop this methodology included developing end-use intensities (EUIs) from a vast collection of Navy base metering and billing data. A statistical analysis of the metering data, weather data, and building energy-use characteristics was used to develop appropriate EUI values for use at all Navy bases. A complete Navy base energy reconciliation process was also created for use in allocating all known energy consumption. Initial attempts to use total Navy base consumption values did not produce usable results. A parallel effort using individual building consumption data provided an estimating method that incorporated weather effects. This method produced a set of building EUI values and weather adjustments for use in estimating building energy use. A method of reconciling total site energy consumption was developed based on a {open_quotes}zero-sum{close_quotes} principle. This method provides a way to account for all energy use and apportion part or all of it to buildings and other energy uses when actual consumption is not known. The entire text of the manual was also revised to present a more easily read understood and usable document.
The U.S. Army Forces Command (FORSCOM) has tasked the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Irwin facility located near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 16 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present valve (NPV) and savings-to-investment ratio (SIR) of each ERO.
The Pacific Northwest Laboratory (PNL) conducted a SAVEnergy Audit of the National Oceanic and Atmospheric Administration`s (NOAA) National Marine Fisheries Service, Northwest Fisheries Science Center in Seattle, Washington. The objectives of this study were to evaluate the performance of all energy-consuming equipment in the facility, to estimate energy consumption and demand by end-use and to recommend energy conservation measures (ECMs) and water conservation measures (WCMs) to reduce costs . This section describes the facility and the systems encountered during the visit by the audit team. It also presents a summary of energy conservation measures. Section 2 shows energy consumption and costs for electricity, natural gas and water. A breakdown of energy consumed by end-use is also presented. Recommended energy conservation measures are presented in Section 3. Section 4 contains a discussion of operations and maintenance issues and other energy measures that can be implemented on a replace-on-failure basis rather than replacing immediately. Appendix A contains a three-year history of consumption, demand and cost for electric, natural gas and water utilities. Appendix B contains information on local weather data correlated to utility billing periods. A brief summary on Federal life-cycle costing is located in Appendix C along with the life-cycle cost analyses summaries for the energy and water conservation measures detailed in this report. Information on the rebate program sponsored by Seattle City Light, the electric utility, is located in Appendix D. Sample information for water-efficient equipment is located in Appendix E. Appendix F contains submittal forms to the Federal Energy Efficiency Fund for the energy conservation measures recommended in Section 3 of this report. A glossary of terms and abbreviations used in this report is located in Appendix G.
This report documents the assessment of baseline energy use at Fort Irwin, a US Army Forces Command facility near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL has designed to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Irwin. This analysis examines the characteristics of electric, propane gas, and vehicle fuel use for a typical operating year. It records energy-use intensities for the facilities at Fort Irwin by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that accounts for all energy use among buildings, utilities, and applicable losses.
This study was designed to assess the potential energy savings from the use of lighting occupancy sensor control in the US Department of Energy (DOE) Hanford Site office facilities. The final results of the study provide useful information for assessing cost-effective use of occupancy sensor lighting control. The results also include specific application data for Hanford Site office building spaces that indicate where sensor technology could be applied for cost-effective energy savings.
Pacific Northwest Laboratory (PNL) has been tasked to plan and implement a framework for measuring and analyzing the efficiency of on-site energy conversion, distribution, and end-use application on federal facilities as part of its overall technical support to the US Department of Energy (DOE) Federal Energy Management Program (FEMP). The Mobile Energy Laboratory (MEL) Procedures establish guidelines for specific activities performed by PNL staff. PNL provided sophisticated energy monitoring, auditing, and analysis equipment for on-site evaluation of energy use efficiency. Specially trained engineers and technicians were provided to conduct tests in a safe and efficient manner with the assistance of host facility staff and contractors. Reports were produced to describe test procedures, results, and suggested courses of action. These reports may be used to justify changes in operating procedures, maintenance efforts, system designs, or energy-using equipment. The MEL capabilities can subsequently be used to assess the results of energy conservation projects. These procedures recognize the need for centralized NM administration, test procedure development, operator training, and technical oversight. This need is evidenced by increasing requests fbr MEL use and the economies available by having trained, full-time MEL operators and near continuous MEL operation. DOE will assign new equipment and upgrade existing equipment as new capabilities are developed. The equipment and trained technicians will be made available to federal agencies that provide funding for the direct costs associated with MEL use.