The paper analyses the breathing air consumption among participating firefighters during full-scale tests performed in the Tistbrottet mine in Sweden 2013. The availability of breathing air during firefighting has in earlier work been identified as a critical tactical factor in underground firefighting. Results from the tests show that there are differences in the breathing air consumption and that this depends on the methods used, equipment and the workload. The use of BA-teams, i.e. firefighters equipped with breathing apparatuses, is a complex group activity where the largest breathing air consumer will set the limits for the whole team. Light equipment and a structured command and control during the activities will enhance the endurance and the firefighting performance. Equipment and methods affect both firefighting performance and the durability of the firefighting activities. Examples of tested methods and equipment during the test series are: different variations of conventional hose lay-out; CAFS; cutting extinguisher; and trolley for equipment and complementary air. The aid of additional air supply and the use of trolleys will support the activities but is dependent on a large degree of preparation and training to function properly. Based on the tests, it is concluded that the larger model of air bottles should be considered for distances longer than 75 m.
The paper describes full-scale fire-fighting tests performed in an underground mine. A total of six different methods to fight a full scale fire in a mine tunnel were tested. The methods involved different fire-fighting equipment but were comparable regarding fundamental conditions such as length of response-route, fire-fighting set-up, and smoke and fire size. The aim was to compare different equipment and methods to reach and eventually extinguish the fire. Fire fighters using breathing apparatus (BA) were monitored regarding air consumption, movement speed and local actions and decisions. The results are presented and analyzed in respect to fire-fighting efficiency, front BA operations including moving speed and performed actions, as well as the time to successfully put out the fire. Measurements of heat release rates, temperatures and moving speeds are given in order to quantify the efficiency of the operation. Results indicate that a timespan of 15–30 min is needed for the firefighters to reach the fire source and achieve the extinguishing criteria in five of the tests. The standard equipment and nozzles shows good performance in the tests. A limiting factor on the firefighter’s endurance is the amount of air that is available. As a result from these findings the endurance of BA-teams could improve if focus is put on team organization, lightweight equipment and air supply.
The need for a successful fire and rescue operation in an underground facility, e.g., a tunnel, introduces challenges both in the planning phase and during the incident. This is because these types ...
The paper describes the full-scale fire and rescue tests performed in Tistbrottet in Sala, Sweden, in autumn 2013. A total of six different approaches to fight a full scale fire in a tunnel were tested. The six approaches involved different fire-fighting equipment but were performed from an equal point regarding fundamental conditions such as length of response-route, fire-fighting set-up, smoke and fire size. The aim was to compare different equipment and methods to reach and eventually put out the fire. Fire fighters using breathing apparatus (BA) were monitored regarding air consumption, movement speed and local actions and decisions. The results are presented and analyzed in respect to fire-fighting efficiency, front BA operations including moving speed and performed actions, as well as the time to successfully put out the fire. Measurements of heat release rates (HRR) and temperatures are given in order to quantify the efficiency of the operation. KEYWORD: full-scale fire experiments, tunnel, fire-fighting, heat release rate (HRR), oxygen, walking speed.
I oktober 2013 genomfordes sex fullskaliga brandforsok med kombinerat forflyttnings och slackmoment i Bjorka Minerals dolomitgruva i Tisbrottet i Sala. Tidigare har dessa tva moment inte kombinerat ...
This report compiles the results from the METRO project. The different parts of theproject – design fires, evacuation, integrated fire control, smoke control, extraordinarystrain onconstructions an ...
Fire and rescue operations in mass transport systems underground often constitute a great challengefor the first responders. In rush-hour traffic at important junctions thousands of people can be l ...