Landsat 9 Operational Land Imager (L9-OLI) was launched on 27 September 2021, after completing a successful radiometric pre-launch calibration and characterization phase. The radiometric math model that governs the ground system—the data processing and analysis system (DPAS)—uses various calibration parameters that had been derived based on the pre-launch tests and analysis. During the on-orbit commissioning phase, the OLI system acquired specific sets of data collects, which enabled the revalidation of the pre-launch absolute calibration scale and other associated instrument performance characteristics. The analysis results shown in this paper focus on the activities and results related to the transfer-to-orbit analysis for the SI-traceable pre-launch radiometric scale. Key topics discussed in this paper include: radiance and reflectance calibration parameters for OLI; solar diffuser collects; stimulation-lamp collects; dark response; signal-to-noise ratios; and noise characteristics; radiometric response stability and the on-orbit update to the radiance to reflectance conversion factors. It will be shown that the OLI response during the early on-orbit operation matched pre-launch results and therefore this re-validates the absolute radiometric scaling at the predicted pre-launch level within the expected level of uncertainties. The launch did not cause any significant changes to the OLI system from the perspective of the absolute radiometric calibration performance. Once the transfer to orbit of the absolute calibration was confirmed, it created a solid basis for further on-orbit refinements of the radiance calibration parameters. As such, follow-on calibration refinements are discussed in other articles within this special issue, and they address issues such as uniformity as well as cross-calibration activities.
The Landsat-9 satellite, launched in September 2021, carries the Operational Land Imager-2 (OLI-2) as one of its payloads. This instrument is a clone of the Landsat-8 OLI and its mission is to continue the operational land imaging of the Landsat program. The OLI-2 instrument is not significantly different from OLI though the instrument-level pre-launch spectral characterization process was much improved. The focal plane modules used on OLI-2 were manufactured as spares for OLI and much of the spectral characterization of the components was performed for OLI. However, while the spectral response of the fully assembled OLI was characterized by a double monochromator system, the OLI-2 spectral characterization made use of the Goddard Laser for Absolute Measurement of Radiance (GLAMR). GLAMR is a system of tunable lasers that cover 350–2500 nm which are fiber-coupled to a 30 in integrating sphere permanently monitored by NIST-traceable radiometers. GLAMR allowed the spectral characterization of every detector of the OLI-2 focal plane in nominal imaging conditions. The spectral performance of the OLI-2 was, in general, much better than requirements. The final relative spectral responses (RSRs) represent the best characterization any Landsat instrument spectral response. This paper will cover the results of the spectral characterization from the component-level to the instrument-level of the Landsat-9 OLI-2.
The accuracy of surface reflectance estimation for satellite sensors using radiance-based calibrations can depend significantly on the choice of solar spectral irradiance (or solar spectrum) model used for atmospheric correction. Selecting an accurate solar spectrum model is also important for radiance-based sensor calibration and estimation of atmospheric parameters from irradiance observations. Previous research showed that Landsat 8 could be used to evaluate the quality of solar spectrum models. This paper applies the analysis using five previously evaluated and three more recent solar spectrum models using both Landsat 8 (OLI) and Landsat 9 (OLI2). The study was further extended down to 10 nm resolution and a wavelength range from Ultraviolet A (UVA) to shortwave infrared (SWIR) (370–2480 nm) using inversion of field irradiance measurements. The results using OLI and OLI2 as well as the inversion of irradiance measurements were that the more recent Chance and Kurucz (SA2010), Meftah (SOLAR-ISS) and Coddington (TSIS-1) models performed better than all of the previous models. The results were illustrated by simulating dark and bright surface reflectance signatures obtained by atmospheric correction with the different solar spectrum models. The results showed that if the SA2010 model is assumed to be the “true” solar irradiance, using the TSIS-1 or the SOLAR-ISS model will not significantly change the estimated ground reflectance. The other models differ (some to a large extent) in varying wavelength areas.
In February 2023 the Landsat 8 mission with its two payloads passed the milestone for a decade of on-orbit operation. This manuscript would summaries major events that occurred through this period to the observatory which includes the spacecraft the two science payloads and their on-board calibration components. It provides a review and decadal summary for the radiometric and geometric performance and stability of the OLI and the TIRS science payloads. Highlights of the current state of the Radiometric and Geometric characteristics performance will be shown. This manuscript illustrates, that despite various safehold events and other technical challenges the Landsat 8 mission continue to perform extremely well, successfully expending the Landsat earth-data archive from 40 years to beyond the 50 years mark.
During the early post-launch phase of the Landsat 9 mission, the Landsat 8 and 9 mission teams conducted a successful under-fly of Landsat 8 by Landsat 9, allowing for the near-simultaneous data collection of common Earth targets by the on-board sensors for cross-calibration. This effort, coordinated by the Landsat Calibration and Validation team, required contributions from various entities across National Aeronautics and Space Administration and U.S. Geological Survey such as Flight Dynamics, Systems, Mission Planning, and Flight Operations teams, beginning about 18 months prior to launch. Plans existed to allow this under-fly for any possible launch date of Landsat 9. This included 16 ascent plans and 16 data acquisition plans, one for every day of the Landsat orbital repeat period, with a minimum of 5 days of useful coverage overlap between the sensors. After the Landsat 9 launch, the plan executed, and led to the acquisition of over 2000 partial to full overlapping scene pairs. Although containing less than the expected number of scenes, this dataset was larger than previous Landsat mission under-fly efforts and more than sufficient for performing cross-calibration of the Landsat 8 and Landsat 9 sensors. The details of the planning process and execution of this under-fly are presented.
The U.S. Geological Survey (USGS) Earth Resources Observation and Science (EROS) Calibration and Validation (Cal/Val) Center of Excellence (ECCOE) focuses on improving the accuracy, precision, calibration, and product quality of remote-sensing data, leveraging years of multiscale optical system geometric and radiometric calibration and characterization experience. The ECCOE Landsat Cal/Val Team continu-ally monitors the geometric and radiometric performance of active Landsat missions and makes calibration adjustments, as needed, to maintain data quality at the highest level. This report provides observed geometric and radiometric analysis results for Landsats 7–8 for quarter 3 (July– September), 2021. All data used to compile the Cal/Val analysis results presented in this report are freely available from the USGS EarthExplorer website: https://ea rthexplore r.usgs.gov. One specific activity that the Cal/Val Team continued to closely monitor this quarter was the Landsat 8 Thermal Infrared Sensor (TIRS) response degradation, which has been observed since the two November 2020 safehold events. Detailed analysis results characterizing this degradation have been included in this report. Additional information about the safehold events is here: h ttps://www .usgs.gov/ core- science-systems/ nli/ landsat/ november- 19- 2020- landsat- 8- data-availability- update- recent- safehold.
Like Landsat 8, Landsat 9 will carry an Operational Land Imager (OLI), a visible to short-wave infrared pushbroom sensor. Referred to as OLI-2, this sensor has 8 spectral bands with about 7000 detectors and one panchromatic band with about 14000 detectors. Maintaining uniformity of the data products is a challenge, particularly at the low end of the response’s dynamic range, as the on-board diffuser provides a high signal level. Water color analyses in coastal and inland areas imaged by Landsat, are one of the more demanding science applications of the OLI data, in part due to the low signal levels. OLI data are serving such demanding science applications due to its excellent noise, stability and calibration characteristics. A new set of on-orbit calibration collects planned for OLI-2 are aimed at enhancing the linearity characterization; these collects should help in keeping uniform imagery through a wide dynamic range. Improved pre-launch characterization of the OLI-2 radiometric response non-linearity led to the idea of using two sets of on-orbit collects to confirm the stability of non-linearity correction across a wider range of response. Collects will be taken where the detector integration time is varied while looking at a constant target: a bright solar diffuser panel and a dimmer internal lamp. Both objects are integral parts of the existing OLI calibration assembly subsystem, but only the diffuser was used in this manner on Landsat 8 OLI. Using pre-launch test data, we demonstrate how the combination of these two sets of data collects will assist in confirming the non-linearity correction is maintained to be under 0.5% across much of the dynamic range. If the on-orbit results show changes, then with such data we should be able to refine the calibration parameters until they minimize the residual errors in the non-linearity throughout the dynamic range.
Landsat 9 is in its final preparations for launch from Vandenberg Space Force Base on 16 September 2021. It has completed its environmental testing at Northrop Grumman Space (NGSP) in Gilbert, Arizona and has been transported to its California launch site. It will be launched into a 705 km orbit replacing Landsat 7 to provide 8-day Earth land mass coverage in concert with Landsat 8. Landsat 8 carries the first Operational Land Imager (OLI) and the Thermal Infrared Sensor (TIRS); Landsat 9 carries the second of each: OLI-2 and TIRS-2. Once launched it will undergo a 90-day activation, checkout, characterization and calibration, a.k.a. commissioning phase before transitioning to operations. For a several-day period during this commissioning phase, Landsat 9 will under-fly Landsat 8, allowing near simultaneous data collection by both sensors of common Earth targets. These data will be used to compare the radiometric calibrations of the instruments and allow for adjustments of processing parameters to provide more consistent data products.
Since the release of Collection 1 in 2016 Landsat imagery in the U.S. Geological Survey (USGS) archive have been organized and managed as a collection of consistently calibrated and processed Earth image data that have been acquired globally over the last nearly 50 years. In addition to Level-2 products and improved geometric accuracy, Collection 2 brings several radiometric updates. In this paper, we will address the Landsat 8 Operational Land Imager (OLI) and Thermal Infrared Sensor (TIRS) absolute and relative gain updates, a change in the OLI bias calculation method and the Landsat 5 Thematic Mapper (TM) thermal band calibration update.
The ECOsystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS) was launched on June 29, 2018, to the International Space Station (ISS). Landsats 7 and 8 were launched on April 15, 1999 and February 11, 2013, respectively. The thermal channels of all three instruments have been validated at the Lake Tahoe, CA/NV, USA, and Salton Sea, CA, USA, automated validation sites. These sites have been used to validate a large number of thermal infrared radiometers including ASTER, MODIS, and VIIRS. We have validated 41 cloud-free ECOSTRESS scenes acquired between July 29, 2018 and June 23, 2019; 625 cloud-free Landsat 7 scenes acquired between June 30, 1999 and February 7, 2019; and 375 cloud-free Landsat 8 scenes acquired between March 10, 2013 and February 8, 2019. Validation involved propagating ground measurements to equivalent at-sensor (vicarious) values and comparing them to the measurements obtained from the sensor using its on-board calibration (OBC). The overall correlation between the in situ measurements and at-sensor radiance for the thermal channels from all three instruments was excellent with R-2 of 0.98-0.99 in all the spectral channels. All three instruments were shown to meet or improve on their preflight absolute radiometric accuracy requirement with absolute radiometric values of better than +/- 1 K at 300 K. All three instruments were also shown to have in-flight noise equivalent delta temperatures which were similar to their preflight values and between 0.1 and 0.3 K depending on the spectral channel.
The history of Earth observation from space is well reflected through the Landsat program. With data collection beginning with Landsat-1 in 1972, the program has evolved technical capabilities while maintaining continuity of land observations. In so doing, Landsat has provided a critical reference for assessing long-term changes to Earth's land environment due to both natural and human forcing. Poised for launch in mid-2021, the joint NASA-USGS Landsat 9 mission will continue this important data record. In many respects Landsat 9 is a clone of Landsat-8. The Operational Land Imager-2 (OLI-2) is largely identical to Landsat 8 OLI, providing calibrated imagery covering the solar reflected wavelengths. The Thermal Infrared Sensor-2 (TIRS-2) improves upon Landsat 8 TIRS, addressing known issues including stray light incursion and a malfunction of the instrument scene select mirror. In addition, Landsat 9 adds redundancy to TIRS-2, thus upgrading the instrument to a 5-year design life commensurate with other elements of the mission. Initial performance testing of OLI-2 and TIRS-2 indicate that the instruments are of excellent quality and expected to match or improve on Landsat 8 data quality. Landsat-9 will maintain the current data acquisition rate of up to 740 scenes per day, with these scenes available from the Landsat archive at no cost to users. In this communication, we provide background and rationale for the Landsat 9 mission, describe the instrument payloads and ground system, and discuss data products available from the Landsat 9 mission through USGS.
The Landsat-8 Thermal Infrared Sensor (TIRS) has been acquiring two-band thermal infrared images of the Earth's surface since 2013. The calibration of the two-band system has been monitored using the on-board calibrator and validated with vicarious calibration performed by NASA/JPL and RIT since launch. Soon after launch, it was discovered that the instrument had a significant stray light effect that was affecting the radiometric calibration. The stray light was corrected in the processing system in 2017. Since then, it has become apparent that there was an additional radiometric error, based on the vicarious calibration results. With a failure within the primary electronic system and subsequent switch to the redundant electronic system, the TIRS instrument effectively has two separate calibration regimes. The vicarious calibration found a statistically significant calibration error, primarily a constant over time, in Band 11 on the primary electronics (Feb 11, 2013 through March 5, 2015) of about -0.6K at 300K. The calibration error in Band 10 was smaller though still statistically significant at about 0.2K at 300K. On the redundant side (March 5, 2015 to present), the calibration error is more signal dependent than time dependent. Both bands are affected, with Band 10 having an error between 1K and -0.4K (between 273-320K) and Band 11 having an error between 0.8K and -1.44K (between 273-320K). This calibration error will be corrected within the USGS Landsat Product Generation System with the release of Landsat Collection-2 products. The Collection-2 release also includes a correction to the relative radiometric calibration of TIRS data. Striping as a result of poor detector-to-detector normalization has been increasing in the imagery since launch. The TIRS relative radiometric calibration will be updated based on internal calibrator data to remove the stripes on a quarterly basis. The visible stripes are generally at 0.1-0.2% level, though there are some detectors in each band that have changed by 1% or more. The Collection-2 release will result in much more uniform TIRS images.
One of the biggest changes in the world of optical remote sensing over the last several years is the sheer increase in the number of sensors that are imaging the Earth in moderate to high spatial resolution. With respect to the calibration of these sensors, they are broadly classified into two types, namely government systems and commercial systems. Because of the differences in the design and mission of these sensor types, calibration approaches are often substantially different. Thus, an opportunity exists to foster discussion between calibration teams for these sensors with the goal of improving overall sensor calibration and data interoperability. The approach used to accomplish this task was a one-day workshop where team members from both government and commercial sensors could share best practices, discuss methods for collaboration and improvement, and make recommendations for continuing activities. Five major recommendations were developed from the event that focused on coordinated activities using pseudo invariant calibration sites (PICS), broader and more consistent communication, collaboration on specific cross-calibration opportunities, developing a reference sensor for all optical systems, and encouraging the coordinated development of surface reflectance products. Workshop participants concluded that regular interactions between these teams could foster a better calibration of all sensor systems and accelerate the improved interoperability of surface products.
Landsat 9 is currently undergoing testing at the integrated observatory level in preparation for launch from Vandenberg Air Force Base in 2021. Landsat 9 will replace Landsat 7 in orbit, 8 days out of phase with Landsat 8. Landsat 9 is largely a copy of Landsat 8 in terms of instrumentation, with an Operational Land Imager (OLI), model #2 and a Thermal Infrared Sensor (TIRS), model #2. The TIRS-2 is more significantly changed from TIRS with increased redundancy, as well as changes to the telescope baffling to improve stray light control and a revised scene select mirror encoder mechanism. Data quality of the Landsat 9 instruments is comparable to, or better than the Landsat 8 ones, with an increase to 14 bits of data transmitted and more detailed pre-launch characterization for OLI-2, and with more detailed characterization of the TIRS-2 pre-launch, in addition to the improved stray light control. The performance of the two instruments is summarized and compared to that of the Landsat 8 instruments.
The radiometric calibration of OLI-2 for Landsat 9 uses two types of sources: pre-launch radiancecalibrated sphere sources and on-board flight solar diffuser panels. For both calibration articles the instrument contractor, Ball Aerospace Corp. assured the NIST scale transfer via laboratory measurements. The NIST reflectance scale transfer was conducted for the OLI-2 two flight diffusers at the University of Arizona Optical Sciences Center. In this report we present an approach in which the per detector information can be derived for the reflectance panel sources from their BRDF characterization. Using such information enables a cross-check of the as measured reflectance results during the prelaunch diffuser collects illuminated by a Heliostat. This information then enables a derivation of the uncertainty levels to allow assessment of the two radiometric calibration paths agreement.
Landsat 9 is planned for launch in December 2020 to continue the mission of observing changes on the Earth's surface that began in 1972 with the launch of Landsat 1. Like Landsat 8, Landsat 9 will carry two imaging instruments: Operational Land Imager 2 (OLI-2), designed and built by Ball Aerospace**, and Thermal Infrared Sensor 2 (TIRS-2), manufactured by NASA Goddard Space Flight Center (GSFC). As of this writing, both sensors have completed the instrument-level ground testing and are ready for integration into the spacecraft. Data collected during the pre-launch performance testing are analyzed to assess the usability of responses of the video reference pixels (VRPs) located on the focal planes of OLI-2 and Landsat 8 OLI for more accurate detector bias estimates, develop a methodology to correct for nonlinearities in the OLI-2 response and compare it to the OLI correction approach, and determine the spatial performance of TIRS-2.
Landsat 9 is currently under development as a joint effort between NASA and the United States Geological Survey (USGS). Landsat 9 is largely a rebuild of Landsat 8 and has the same two sensors, an Operational Land Imager (OLI) and a Thermal InfraRed Sensor (TIRS). The OLI-2 on Landsat 9, being built by Ball Aerospace, has completed its pre-launch characterization and calibration and is scheduled to be delivered in the summer of 2019. The TIRS-2, with improved stray light performance and increased redundancy for improved reliability, is being built by Goddard Space Flight Center. TIRS-2 is undergoing testing through Spring 2019 and is also scheduled for summer 2019 delivery. Several improvements to the characterization of both instruments have been incorporated into the testing plan, including improved spectral and radiometric characterization. The instruments will then be integrated onto the spacecraft being built by Northrop Grumman Innovation Systems (NGIS). The mission is targeted to launch as early as December 2020 on an Atlas V.
Landsat 9 will continue the Landsat data record into its fifth decade with launch scheduled for December 2020. The two instruments on Landsat 9 are Thermal Infrared Sensor-2 (TIRS-2) and Operational Land Imager-2 (OLI-2). OLI-2 is a nine-channel pushbroom imager with a 15-degree field of view that will have a 16-day measurement cadence from its nominal 705-km orbit altitude. A key aspect of the data that will be produced by OLI-2 is its spectral fidelity which enables countless science applications. The prelaunch test campaign for spectral characterization of OLI-2 was substantially improved relative to the methodology used for OLI: the full spectral response of every detector was characterized with greater accuracy, sampling, and precision. This paper will describe how this was accomplished with a tunable laser-based light source called Goddard Laser for Absolute Measurement of Radiance (GLAMR).