Soil vapor extraction (SVE) has been used at sites across the Department of Energy complex, including sites where legacy subsurface wastes represent a potential source of groundwater contamination. At Los Alamos National Laboratory (LANL), leakage from waste drums buried at an inactive chemical waste site has created a subsurface vapor plume of volatile organic compounds (VOCs). Soil vapor extraction operation in 2015 and rebound testing through 2017 were successful in reducing the plume's mass and mitigating VOC migration toward the water table. However, the possibility that waste drums could fail and release VOCs could pose a challenge in the future. To explore the impacts of drum failure, as well as the capabilities of SVE remediation, we simulated hypothetical contaminant release scenarios and subsequent SVE remediation. Three-dimensional subsurface VOC behavior, including advection, diffusion, and plume interactions with topography, were simulated using the porous flow simulator Finite Element Heat and Mass Transfer. Simulations of future site conditions have allowed identification of "sentry" boreholes that can be monitored for early detection in case of drum failure. Sentry boreholes can also be used to set concentration thresholds above which SVE should be initiated. For the LANL site, simulations show that SVE can be started 3 yr following drum failure and remain a viable remediation tool. More broadly, the principles outlined in this work can be used to support remediation planning at other subsurface waste sites. Predictive models of future releases can be analyzed to set concentration threshold values, guide selection of sentry boreholes, and increase operational efficiency.
This report consists of four major sections, including this introductory section. Section 2 provides an overview of previous investigations related to the development of the current sitescale model. The methods and data used to develop the 3-D groundwater model and the techniques used to distill that model into a form suitable for use in the GoldSim models are discussed in Section 3. Section 4 presents the results of the model development effort and discusses some of the uncertainties involved. Eight attachments that provide details about the components and data used in this groundwater pathway model are also included with this report. The groundwater modeling effort reported here is a revision of the work that was conducted in 2005 (Stauffer et al., 2005a) in support of the 2008 Area G performance assessment and composite analysis (LANL, 2008). The revision effort was undertaken primarily to incorporate new geologic information that has been collected since 2003 at, and in the vicinity of, Area G. The new data were used to create a more accurate geologic framework model (GFM) that forms the basis of the numerical modeling of the site’s long-term performance. The groundwater modeling uses mean hydrologic properties of the geologic strata underlying Area G; this revision includes an evaluation of the impacts that natural variability in these properties may have on the model projections.