Taking advantage of the flexibility of Distributed Energy Resources (DER) can help improve distribution network efficiency, reliability and resilience. EUniversal project aims to facilitate the use of flexibility services and interlink active system management of distribution system operators with electricity markets. congestion management and voltage control have been identified has the most relevant needs, within different operation timeframes, namely: from day, weeks and years ahead. This paper considers long-term flexibility services to support maintenance actions, increasing the periods where is technically possible to perform maintenance actions maintaining security of operation. The methodology developed to schedule planned maintenance actions based on forecasted network profiles, maintenance costs, network reconfiguration capability and flexibility contracted in long-term flexible markets will be presented.
The EUniversal project, funded by the European Union, aims to establish a universal approach to the utilization of flexibility by Distribution System Operators (DSOs) and their engagement with new flexibility markets. To achieve this objective, the project team has focused on developing the Universal Market Enabling Interface (UMEI) concept. This paper presents an overview of the process of adapting grid core systems to interact with different market platforms and agents, which is a key aspect of the real-world demonstration set to take place in Portugal.
EUniversal project aims to facilitate the use of flexibility services and interlink distribution systems active management with electricity markets. Implementing market-based flexibility services implies a change in distribution network monitoring and control towards a more predictive approach. However, integrating cost-effective monitoring and control tools for the LV network is still quite challenging. Within the project, a set of operation and planning tools have been developed for a coordinated quantification and activation of flexibility in HV, MV and LV distribution networks. The paper presents the tools developed for the Portuguese pilot and shows preliminary results obtained when considering network operation scenarios characterized by large scale integration of DER and EV.
This paper proposes an energy community management system for local energy sharing with grid flexibility services to solve the potential grid constraints of the local distribution network. A three-stage model is proposed. Stage 1 is the individual minimization of the energy bill of each prosumer by optimizing the schedules of its battery. The second stage optimizes the energy bill of the energy community by sharing internally the prosumers energy surplus and re-dispatching their batteries, while guaranteeing that each new individual prosumer energy bill is always equal or less than its stage 1 bill. The third stage is performed by the DSO to solve the grid constraints by re-dispatching the batteries, curtailing local generation or reducing consumption. Stage 3 minimizes the impact on stage 2 by minimizing the loss of profit or utility of every prosumer which is compensated accordingly.