TRMM has three level 3 (space/time averaged) data products that aggregate level 2 TRMM Microwave Imager (TMI) GPROF precipitation retrievals: 3A12, a monthly accumulation of 2A12 the GPROF swath retrieval product; 3B31, a monthly accumulation of 2B31 the combined retrieval product that uses both Precipitation Radar (PR) and TMI data; 3G68 (and its variants) that provide hourly retrievals for TMI, PR and combined. The 3G products are packaged as daily files but provide hourly information at .5 x .5 degree globally, .25 x .25 degree globally, and .1 x .1 degree over Africa, Australia and South America.
TRMM has three level 3 (space/time averaged) data products that aggregate level 2 TRMM Microwave Imager (TMI) GPROF precipitation retrievals. These three products are TRMM 3A12, which is a monthly accumulation of 2A12 the GPROF swath retrieval product; TRMM 3B31, which is a monthly accumulation of 2A12 and 2B31 the combined retrieval product that uses both Precipitation Radar (PR) and TMI data; and 3G68 and its variants, which provide hourly retrievals for TMI, PR and combined. The 3G68 products are packaged as daily files but provide hourly information at 0.5 deg x 0.5 deg resolution globally, 0.25 deg x 0.25 deg globally, or 0.1 deg x 0.1 deg over Africa, Australia and South America. This paper will present early information of the changes in the v7 TMI GPROF level 2 retrievals that have an impact on the level 3 accumulations. This paper provides an analysis of the effect the 2A12 GPROF changes have on 3G68 products. In addition, it provides a comparison between the TRMM level 3 products that use the TMI GPROF swath retrievals.
NASA has a long standing commitment to the improvement of its mission datasets. Indeed, data reprocessing is always built into the plans, schedule and budget for the mission data processing system. However, in addition to these ongoing mission reprocessing, NASA also supports a final reprocessing of all the data for a mission upon its completion (known as Phase F). TRMM Phase F started with the end of the TRMM mission in June of 2015. This last reprocessing has two overall goals: improvement of the TRMM mission data products; incorporation of the 17+ years of TRMM data into the ongoing NASA/JAXA GPM data processing. The first goal guarantees that the latest algorithms used for precipitation retrievals will also be used in reprocessing the TRMM data. The second goal ensures that as GPM algorithms are improved, the entire TRMM data will always be reprocessed with each GPM reprocessing. In essence TRMM becomes another of the GPM constellation satellites. This paper will concentrate on presenting the improvements to TMI level 1 data including calibration, geolocation, and emissive antenna corrections. It will describe the format changes that will occur how the TMI level 1C product will be intercalibrated using GMI as the reference calibration. It will also provide an overview of changes in the precipitation radar products as well as the combined TMIPR product.