NREL hosted this workshops to help state public utility commissions (PUCs) understand the materials and support available to assist in distributed energy resource (DER) interconnection activities. This workshop focused on "Modern DER Capabilities and Deployment Concerns" and included four speakers, whose material will be posted at https://www.nrel.gov/grid/ieee-standard-1547/workshops.html. The slides in this deck were for the facilitator to provide context to the attendees, as well as additional resources on the topics discussed.
This project identifies and makes publicly available educational materials to assist stakeholders in adopting the revised IEEE Std 1547-2018, Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces. The new standard is significantly different than the previous 2003 version, contains new concepts and new technical requirements, and requires educational material on the application of these changes. NREL had a principal role in accelerating the revision process though its chairmanship of the IEEE Std 1547 working group to revise the standard and through technical support provided to the working group. Under this project, NREL and partners compiled and developed publicly available educational materials for IEEE Std 1547-2018, including webinars, white papers, and other resources on related topics.
project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.
As part of the U.S. Agency for International Development (USAID)-National Renewable Energy Laboratory (NREL) Young Leaders Workforce Training Program in Colombia, participants from Colombia's Energy and Gas Regulatory Commission (CREG) leveraged their training and professional experience to develop a regulatory roadmap for the interconnection and interoperability of increasing integration of distributed energy resources (DERs). CREG was one of four teams selected by the training program development team to receive continued technical assistance and strategic advisory support from the USAID-NREL Partnership for action plan development and implementation. This case study provides an overview of the key activities and outcomes of the technical assistance provided by NREL on the CREG Action Plan, and key next steps for implementation of Colombia's DER Integration Regulatory Roadmap.
This issue brief provides an overview of key technical requirements for inverter-based resources - including distributed energy resources (DERs) - to support the reliable and safe operation of the Providencia Island electrical grid, and other island or isolated area mini-grid applications. With the planned increase in inverter-based resources and the introduction of energy storage, adopting Institute of Electrical and Electronics Engineers (IEEE) Std 1547-2018, including the more advanced performance capabilities for voltage and frequency ride-through, will simplify interconnection as well as help to maintain a safe, reliable grid on Providencia Island.
The USAID-NREL Partnership in Colombia, in conjunction with SURE and USEA, selected four action plan teams from the Young Professionals Leadership Program to receive tailored NREL technical assistance to support action plan implementation. The four plans selected represent various aspects associated with planning for the efficient integration of DERs, including electric mobility, residential and commercial energy applications, distributed generation modeling, and regulatory considerations. In response to national grid modernization, decentralization, digitalization, and electrification trends, CREG is looking to update Colombia's electric distribution code, with an emphasis on the integration of electric vehicles and charging stations, but also energy storage systems, non-conventional sources of renewable energy, and other distributed energy resources (DERs). CREG aims to establish the general steps that must be carried out to update the distribution code for the integration of DERs, with a view to the design and development of new markets. The objective of the TA provided to CREG was to support them in identifying and outlining the general processes and approaches to consider when updating Colombia's distribution code for the integration of electric vehicles, distributed renewable energy systems, and energy storage systems, with a view to the design and development of new markets.
As the DER penetration level has risen significantly in recent times, parameter settings and configuration of installed DERs are having direct impact on local electric distribution utilities as well as bulk power systems during normal and abnormal grid conditions. On the other hand, all grid-connected DERs in the United States of America must conform to the interconnection requirements prescribed in the IEEE Std 1547-2018. Because of these reasons, it is crucial to understand the expected DER performance during abnormal grid conditions considering the requirements of the IEEE Std 1547-2018. The aim of this document is twofold: (1) to summarize requirements in IEEE Std 1547-2018 having direct implications in distribution network protection, and (2) to provide the reader with knowledge and information that will be required for users to apply the requirements specified. Since the focus of this document is on distribution network protection in the presence of DERs, it is assumed that the readers have basic understanding of distribution network protection as well as working principles of DERs. This document starts with a brief introduction on protection systems for distribution network followed by a discussion on the impact of DER on the protection systems. Current practices to provide network protection in the presence of DER is briefly discussed. The document then explores the DER performance requirements in IEEE Std. 1547-2018; especially on those related to distribution network protection. Section 6.1 in IEEE Std. 1547-2018 provides an overview of capabilities and control requirements for DER under abnormal operating conditions. This section also introduces abnormal operating performance categories I, II, III. The DER response to various types of faults and grid conditions such as short-circuit faults and open phase conditions are discussed in section 6.2 in the standard while requirements for coordination with the Area EPS reclosing scheme are provided in section 6.3. Section 6.4 in the IEEE Std 1547-2018 specifies requirements for mandatory voltage tripping and ride-through requirements during low and high voltage disturbances and section 6.5 specifies similar requirements for low and high frequency disturbances. IEEE Std. 1547 requires that the conformance of the DERs to IEEE Std 1547-2018 requirements should be verified in accordance with IEEE Std. 1547. 1. There are several parameters and settings of DERs that need to be properly selected for reliable operation during abnormal grid condition while applying the requirements of IEEE Std 1547-2018. Key decisions for proper selections of parameter and settings are: 1. Determination of required DER abnormal operating performance category, 2. Determination of DER response (shall trip) to abnormal voltages and 3. Determination of DER response (shall trip) to abnormal frequency.
This report covers microgrids as a special application of distributed energy resources (DERs) in Puerto Rico. This is one of a series of reports describing the U.S. Department of Energy (DOE) multi-laboratory efforts undertaken. To ensure the sustainable, long-term recovery of Puerto Rico's electric power grid from hurricanes Maria and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, DOE convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. In Phase 1 of the multi-laboratory effort to support Puerto Rico's recovery, the National Renewable Energy Laboratory (NREL) provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected, renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliability, safety, or security (https://www.nrel.gov/docs/fy19osti/73848.pdf). In Phase 2, NREL published a report focused on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico (https://www.nrel.gov/docs/fy21osti/77127.pdf). This report familiarized the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provided considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers 1547-2018 interconnection standard. Additionally, the report identified ways to improve the physical resiliency of installed DERs. This task describes how distributed energy systems may participate in and contribute to improving the resiliency of Puerto Rico's energy infrastructure in the future. This report presents an analysis of the Puerto Rico grid to illustrate the possible different microgrid and minigrid scenarios. The capability to form sustained microgrids and minigrids has the potential to provide a high level of resiliency during disturbances on the grid. DERs, on the other hand, have the capability to aid in the microgrid operation by providing grid support as well as grid-forming functionality. Other tasks in Phase 3 include voltage regulation in distribution networks using DERs and transmission-and-distribution co-simulation.
This document provides an overview of intentional islands, otherwise known as microgrids. The topics covered include common types of microgrid configurations, high level summaries of standards that address some aspect of microgrid implementation and interconnection, and a discussion of specific standards that apply during specific the islanding operational stages of parallel operation, transition to islanding, islanding operation and transition back to parallel operation.
The focus of this document is to provide a summary of the requirements related to unintentional islanding in the IEEE 1547 standard, and to provide the reader with basic knowledge and background information to improve the understanding and utilization of the requirements specified.
To ensure the sustainable long-term recovery of Puerto Rico's electric power grid from hurricanes María and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, the U.S. Department of Energy (DOE) convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. A resilient electric grid is vital to Puerto Rico's security, economy, and way of life, and it will provide the foundation for essential services that people and businesses on the island rely on every day. This report shows progress for a grid modeling task under the DOE-sponsored project that is a collaboration among the National Renewable Energy Laboratory (NREL) and other national laboratories. In Phase 1 of the multilab effort to support Puerto Rico's recovery, NREL provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This Phase 2 report focuses on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico. This report is intended to familiarize the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provides considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard (RPS) goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers (IEEE) 1547-2018 interconnection standard.
The intent of this paper is to support local authorities in adopting the most current technical requirements for interconnecting distributed energy resources (DERs) to the electric distribution system as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, state regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this paper addresses both the technical issues and related process considerations. A lack of uniform and transparent procedures for addressing interconnection rule changes can result in implementation issues or inefficiencies, such as unclear, lengthy, and complicated interconnection rules that can increase distributed generation "soft costs" (i.e., non-hardware costs). This can further delay the deployment of DERs and jeopardize time-constrained national and state policy goals, such as renewable energy targets, or limit participation in emerging techno-economic trends. Additionally, misconstructed interconnection rules are at risk of becoming mired in stakeholder conflicts. This guide addresses the concerns of electric service regulators from both the process and technical standpoints by presenting a structured, step-by-step approach to developing and updating existing interconnection rules. In this document, the process of developing and updating interconnection rules is subdivided into three steps: (1) determining the context (stakeholders and major drivers); (2) developing the rule, including updating technical requirements; and (3) maintaining and revising the rule over time.
The intent of this document is to support local authorities governing interconnection requirements in adopting the most current requirements for interconnecting distributed energy resources (DERs) to the electric distribution system, as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018 ). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, electric service regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this document addresses both the technical issues and related process considerations.
The revised Institute of Electrical and Electronics Engineers (IEEE) 1547 Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018) was published in April 2018. This standard is one of the foundational documents in the United States needed for integrating distributed energy resources (DERs), including solar energy systems, with the electric distribution grid. The revised standard contains 11 chapters (clauses) and 8 annexes that comprise 136 pages. The revision is significantly different from the 2003 version, and it contains new concepts and new technical requirements. Each clause specifies information or requirements that apply to certain aspects important to the interconnection of DERs to the electric power system. Implementing the requirements necessitates a careful study of the underlying technical concept and requires the appropriate information required to calculate relevant settings and configurations. Various stakeholders have different roles in implementing the standard, and portions of the standard are directed toward a specific audience who must possess specialized information and technical training to use and apply the requirements. This document aims to (1) summarize a specific portion of the standard as concisely as possible and (2) provide the reader with introductory knowledge and information to support the utilization of the requirements.
The revised Institute of Electrical and Electronics Engineers (IEEE) 1547-2018, Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces, was published in April 2018. This standard is one of the foundational documents in the United States needed for integrating distributed energy resources (DERs), including solar energy systems, and energy storage systems with the electric distribution grid. The revised standard contains 11 chapters (clauses) and 8 annexes that comprise 136 pages. The revision is significantly different from the 2003 version, and it contains new concepts and new technical requirements. Each clause specifies information or requirements that apply to certain aspects that are important to the interconnection of DERs to the electric power system. Implementing the requirements necessitates a careful study of the underlying technical concepts and requires appropriate information to calculate relevant settings and configurations. This document provides informative material on the requirements related to electrical power quality in IEEE Std 1547-2018, with the intent to equip the reader with basic knowledge and background information to improve understanding and use of the requirements specified.
This document addresses analytical tools and methods to support electric distribution system planning with distributed energy resources (DERs) and grid modernization, drawing on leading-edge research and examples from around the United States. In this report, tools include computer models and software, as well as other analytical aids and practices that support distribution system planning. At its core, distribution system planning is about supporting investment decisions. Enhanced and integrated distribution system planning allows utilities to move from a passive reactive role to smart proactive planning with respect to DERs. Distribution system planning can increase transparency around utility distribution system investments before they are brought to the regulatory body for cost recovery, can support deferring traditional infrastructure investments, and can provide information and incentives to customers and third parties about where DERs can help the grid. A growing number of states are beginning to consider a comprehensive distribution system planning process that addresses the costs and benefits of DERs, reflects more choices coming from the customer/third-party domains, is integrated with resource and transmission planning, and incorporates planning scenarios that reflect the dynamic and changing nature of the electricity system
The revised IEEE 1547 standard (IEEE Std 1547-2018) contains eleven chapters (clauses) and eight annexes that comprise 136 pages. Each clause specifies information or requirements that apply to certain aspects important to the interconnection of distributed energy resources to the electric power system. Implementation of the requirements needs a careful study of the underlying technical concept and also needs the appropriate information that may be required to calculate various settings and configurations. This document aims to provide an introductory text to assist users of IEEE Std 1547-2018 in identifying the following questions: what is the primary audience of the clause/subclause? What knowledge is required to understand the technical subject matter? What information is required to apply/implement the requirements specified? What level of fluency with the subject matter is required to apply/implement the requirements?
This document is intended to aid in the understanding and application of the New York State Standardized Interconnection Requirements (SIR) and Application Process for New Distributed Generators 5 MW or Less Connected in Parallel with Utility Distribution Systems, and it aims to provide supplemental information and discussion on selected topics relevant to the SIR. This guide focuses on technical issues that have to date resulted in the majority of utility findings within the context of interconnecting photovoltaic (PV) inverters. This guide provides background on the overall issue and related mitigation measures for selected topics, including substation backfeeding, anti-islanding and considerations for monitoring and controlling distributed energy resources (DER).