The construction industry has been facing a paradigm shift to (i) increase productivity, efficiency, infrastructure value; quality and sustainability (ii) reduce lifecycle costs, lead times and duplications via effective collaboration and communication of stakeholders in construction projects. This paradigm shift is becoming more critical with remote construction projects, which reveals unique and even more complicated challenging problems in relation to communication and management due to the remoteness of the construction sites. On the other hand, Building Informational Modelling (BIM) is offered by some as the panacea to addressing the interdisciplinary inefficiencies in construction projects. Although in many cases the adoption of BIM has numerous potential benefits, it also raises interesting challenges with regards to how BIM integrates the business processes of individual practices. This paper aims to show how BIM adoption for an architectural company helps to mitigate the management and communication problems in remote construction project. The paper adopts a case study methodology, which is a UK Knowledge Transfer Partnership (KTP) project of BIM adoption between the University of Salford, UK and John McCall Architects (JMA), in which the BIM use between the architectural company and the main contractor for a remote construction project is elaborated and justified. Research showed that the key management and communication problems such as poor quality of construction works, unavailability of materials, and ineffective planning and scheduling can largely be mitigated by adopting BIM at the design stage.
Enabling knowledge societies and knowledge based economies is a key policy in the UK. Knowledge Transfer Partnership (KTP) scheme initiated by the Technology Strategy Board is a pathway for collaboration and partnerships between higher education institutions and companies to transfer innovative knowledge based solutions from universities to businesses in order to equip them with the leading edge knowledge and technology infrastructure for sustainable long term competitive advantages in both national and international market. The paper explains a KTP project between the University of Salford and John McCall Architects (JMA) in Liverpool in the UK that aimed to identify, map and re-engineer JMA’s strategic and operational change processes through lean thinking and the implementation of Building Information Modelling (BIM), which is a foundational tool for implementing an efficient process and invariably leads to lean-orientated, team based approach to design and construction by enabling the intelligent interrogation of designs; provide a quicker and cheaper design production; better co-ordination of documentation; more effective change control; less repetition of processes; a better quality constructed product; and improved communication both for JMA and across the supply chain whereas it provided opportunity to increase business relevance of knowledge based research and teaching for the higher education. Case study approach is employed in this paper and the KTP project is assessed for i) how it helped in improving JMA’s knowledge and technology capacity in conducting their practice, and, ii) how it helped the university in improving its knowledge based research and teaching. Keywords: Knowledge Transfer Partnership, Design and Construction, Technology Transfer, Building Information Modelling, Lean Process Improvement