The mission of WEST (tungsten-W Environment in Steady-state Tokamak) is to explore long pulse operation in a full tungsten (W) environment for preparing next-step fusion devices (ITER and DEMO) with a focus on testing the ITER actively cooled W divertor in tokamak conditions. Following the successful completion of phase 1 (2016-2021), phase 2 started in December 2022 with the lower divertor made entirely of actively cooled ITER-grade tungsten mono-blocks. A boronization prior the first plasma attempt allowed for a smooth startup with the new divertor. Despite the reduced operating window due to tungsten, rapid progress has been made in long pulse operation, resulting in discharges with a pulse length of 100 s and an injected energy of around 300 MJ per discharge. Plasma startup studies were carried out with equatorial boron nitride limiters to compare them with tungsten limiters, while Ion Cyclotron Resonance Heating assisted startup was attempted. High fluence operation in attached regime, which was the main thrust of the first campaigns, already showed the progressive build up of deposits and appearance of dust, impacting the plasma operation as the plasma fluence increased. In total, the cumulated injected energy during the first campaigns reached 43 GJ and the cumulated plasma time exceeded 5 h. Demonstration of controlled X-Point Radiator regime is also reported, opening a promising route for investigating plasma exhaust and plasma-wall interaction issues in more detached regime. This paper summarises the lessons learned from the manufacturing and the first operation of the ITER-grade divertor, describing the progress achieved in optimising operation in a full W environment with a focus on long pulse operation and plasma wall interaction.
Combined high-fusion performance and long-pulse operation is one of the key integration challenges for fusion energy development in magnetic devices. Addressing these challenges requires an integrated vision of physics and engineering aspects with the purpose of simultaneously increasing time duration and fusion performance. Significant progress has been made in tokamaks and stellarators, including very recent achievement in duration and/or performance. This progress is reviewed by analyzing the experimental data (109 plasma pulses with a total of 3200 data points, i.e. on average 29 data per pulse) provided by ten tokamaks (in alphabetical order: Axially Symmetric Divertor Experiment Upgrade, DIII-D, Experimental Advanced Superconducting Tokamak, Joint European Torus, JT-60 Upgrade, Korea Superconducting Tokamak Advanced Research, tokamak à configuration variable, Tokamak Fusion Test Reactor, Tore Supra, W Environment in Steady-State Tokamak) and two stellarators (Large Helical Device and Wendelstein 7-X) expanding the pioneering work of Kikuchi (Kikuchi M. and Azumi M. 2015 Frontiers in Fusion Research II: Introduction to Modern Tokamak Physics (Springer)). Data have been gathered up to January 2022 and coordination has been provided by the recently created International Energy Agency-International Atomic Energy Agency international C oordination on I nternational C hallenges on L ong duration OP eration group. By exploiting the multi-machine international database, recent progress in terms of injected energies (e.g. 1730 MJ in L-mode, 425 MJ in H-mode), durations (1056 s in L-mode, 101 s in H-mode), injected powers, and sustained performance will be reviewed. Progress has been made to sustain long-pulse operation in tokamaks and stellarators with superconducting coils, actively cooled components, and/or with metallic walls. The graph of the fusion triple products as a function of duration shows a dramatic reduction of, at least two orders of magnitude when increasing the plasma duration from less than 1 s to 100 s. Indeed, long-pulse operation is usually reached in dominant electron-heating modes at reduced density (current drive optimization) but with low ion temperatures ranging from 1 to 3 keV for discharges above 100 s. Difficulties in extending the duration may arise from coupling high heating powers over long durations and the evolving plasma-wall interaction towards an unstable operational domain. Possible causes limiting the duration and critical issues to be addressed prior to ITER operation and DEMO design are reported and analyzed.
WEST is an MA class superconducting, actively cooled, full tungsten (W) tokamak, designed to operate in long pulses up to 1000 s. In support of ITER operation and DEMO conceptual activities, key missions of WEST are: (i) qualification of high heat flux plasma-facing components in integrating both technological and physics aspects in relevant heat and particle exhaust conditions, particularly for the tungsten monoblocks foreseen in ITER divertor; (ii) integrated steady-state operation at high confinement, with a focus on power exhaust issues. During the phase 1 of operation (2017-2020), a set of actively cooled ITER-grade plasma facing unit prototypes was integrated into the inertially cooled W coated startup lower divertor. Up to 8.8 MW of RF power has been coupled to the plasma and divertor heat flux of up to 6 MW m(-2) were reached. Long pulse operation was started, using the upper actively cooled divertor, with a discharge of about 1 min achieved. This paper gives an overview of the results achieved in phase 1. Perspectives for phase 2, operating with the full capability of the device with the complete ITER-grade actively cooled lower divertor, are also described.
The WEST platform consists in a major upgrade of Tore Supra towards a steady-state tungsten (W) diverted tokamak. In support of this, significant developments are performed on the measurement systems (diagnostics); the control, data access and communication (CODAC); the plasma control system (PCS), the monitoring and protection of the first wall and modelling to prepare the restart of the plasma. Thanks to collaboration agreements already in force, most of the developments and some hardware procurements are performed with the help of several international partners. This paper discusses the present status of developments regarding the measurements and control for the WEST project. In particular, the integration of about 50 diagnostics in ports is completed, and their in-vessel and ex-vessel installation is underway. The refurbishment of the CODAC network architecture has been completed. The development of the new acquisition units based on PXI and of the Plasma Control System (PCS) is ongoing and some units are already available. In parallel, to prepare the plasma restart, the development of plasma magnetic and kinetic controllers has been performed on simplified plant and actuator models and plasma models.
Following the completion in May 2011 of the shutdown for the installation of the beryllium wall and the tungsten divertor, the first set of JET campaigns have addressed the investigation of the retention properties and the development of operational scenarios with the new plasma-facing materials. The large reduction in the carbon content (more than a factor ten) led to a much lower Zeff (1.2–1.4) during L- and H-mode plasmas, and radiation during the burn-through phase of the plasma initiation with the consequence that breakdown failures are almost absent. Gas balance experiments have shown that the fuel retention rate with the new wall is substantially reduced with respect to the C wall. The re-establishment of the baseline H-mode and hybrid scenarios compatible with the new wall has required an optimization of the control of metallic impurity sources and heat loads. Stable type-I ELMy H-mode regimes with H98,y2 close to 1 and βN ∼ 1.6 have been achieved using gas injection. ELM frequency is a key factor for the control of the metallic impurity accumulation. Pedestal temperatures tend to be lower with the new wall, leading to reduced confinement, but nitrogen seeding restores high pedestal temperatures and confinement. Compared with the carbon wall, major disruptions with the new wall show a lower radiated power and a slower current quench. The higher heat loads on Be wall plasma-facing components due to lower radiation made the routine use of massive gas injection for disruption mitigation essential.