The National Ignition Facility (NIF) Power Conditioning System (PCS) is a modular capacitive energy storage system that will be capable of storing nearly 400 MJ of electrical energy and delivering that energy to the nearly 8000 flashlamps in the NIF laser. The first sixteen modules of the power conditioning system have been built, tested and installed. Activation of the first nine power conditioning modules has been completed and commissioning of the first "bundle" of laser beamlines has begun. This paper will provide an overview of the power conditioning system design and describe the status and results of initial testing and activation of the first "bundle" of power conditioning modules.
The National Ignition Facility (NIF) Power Conditioning System (PCS) is a modular capacitive energy storage system that provides over 34 kilojoules of energy to each of the nearly 8000 flashlamps in the NIF laser. Up to 400 megajoules of energy can be stored in the NIF PCS system, discharged through spark gaps and delivered to the flashlamps through a coaxial transmission line system requiring nearly 100 miles of high-voltage cable. The NIF PCS has been under development for nearly 4 years. During this time, the system was developed and designed by Sandia National Laboratory in Albuquerque, NM (SNLA) in conjunction with Lawrence Livermore National Laboratory (LLNL). Extensive reliability testing was performed at SNLA on the First Article NIF Test Module (FANTM) test facility and design improvements were implemented based on FANTM test results, leading to the final design presently undergoing system reliability testing at LLNL. Low-cost energy-storage capacitors, charging power supplies, and reliable, fault-tolerant components were developed through partnerships with numerous contractors. Extensive reliability and fault testing of components has also been performed. This paper provides an overview of the many efforts that have culminated in the final design of the NIF PCS. The PCS system design will be described and the cost tradeoffs discussed. Plans for fabrication and installation of the NIF PCS system over the next 6 years will be presented.