The National Ignition Facility (NIF) utilizes 192 high-energy laser beams focused with enough power and precision on a hydrogen-filled spherical, cryogenic target to potentially initiate a fusion reaction. NIF has been operational for six years and during that time, thousands of successful laser firings or shots have been executed. Critical instrument measurements and camera images are carefully recorded for each shot. The result is a massive and complex database or ‘big data’ archive that can be used to investigate the state of the laser system at any point in its history or to locate and track trends in the laser operation over time. In this study, the optical light throughput for more than 1600 NIF shots for each of the 192 main laser beams and 48 quads was measured over a three year period from January 2009 to October 2012. The purpose was to verify that the variation in the transmission of light through the optics performed within design expectations during this time period. Differences between average or integrated intensity from images recorded by the input sensor package (ISP) and by the output sensor package (OSP) in the NIF beam-line were examined. A metric is described for quantifying changes in the integrated intensity measurements. Changes in light transmission from the NIF main laser over the three year time-frame are presented.
We have achieved the NIF design goals for power and energy by delivering 1.86 MJ of ultra-violet energy in a wide dynamic range (> 300: 1), 22.5-ns shaped ignition pulse with a peak power of 520 TW.
The National Ignition Facility (NIF) is a high power laser system capable of supporting high-energy-density experimentation as a user facility for the next 30 years. In order to maximize the facility availability, preventive maintenance enhancements are being introduced into the system. An example of such an enhancement is a camera-based health monitoring system, integrated into the automated alignment system, which provides an opportunity to monitor trends in measurements such as average beam intensity, size of the beam, and pixel saturation. The monitoring system will generate alerts based on observed trends in measurements to allow scheduled pro-active maintenance before routine off-normal detection stops system operations requiring unscheduled intervention.
The National Ignition Facility (NIF) is a 192-beam high energy laser designed for Inertial Confinement Fusion (ICF), and High Energy Density (HED) and basic science experiments. In order to achieve ignition with an ICF target, the beam and target alignment must be performed within very tight specifications. At the same time, in order to be able to conduct the wide range of HED and basic science experiments, the facility must be able to meet the tight tolerances for both main and offset backlighter beams and targets. To diagnose the ignition event, many different target diagnostics are employed, including optical, x-ray, and nuclear diagnostics. These target diagnostics must also be positioned accurately and reliably within very tight specifications in order to ensure good data is acquired. In this paper, we describe the strategy for beam, target, and diagnostic alignment at NIF.
Automated alignment for the National Ignition Facility (NIF) is accomplished using a large-scale parallel control system that directs 192 laser beams along the 300m optical path. The beams are then focused down to a 50μ spot in the middle of the target chamber. The entire process is completed in less than 50min. The alignment system commands 9000 stepping motors for extremely precise adjustment of mirrors and other optics. 41 control loops per beamline perform parallel processing services running on a LINUX cluster to analyze high-resolution images of the beams and their references. This paper describes the status the NIF automatic alignment system and the challenges encountered as NIF development has transitioned from building the laser, to becoming a research project supporting a 24h, 7 days/week laser facility. NIF is now a continuously operated system where performance monitoring is increasingly more critical for operation, maintenance, and commissioning tasks. Equipment wear and the effects of high energy neutrons from fusion experiments are issues which affect alignment efficiency and accuracy. New sensors needing automatic alignment assistance are common. System modifications to improve efficiency and accuracy are prevalent. Handling these evolving alignment and maintenance needs while minimizing the impact on NIF experiment schedule is expected to be an on-going challenge for the planned 30 year operational life of NIF.
Summary form only given. We have installed the National Ignition Facility Neutron Imaging System. The imaging system provides information about the areal density of fuel in the various regions of the capsule implosion. A long line of sight enables imaging both the primary 14 MeV neutrons as well as the down-scattered neutrons with energies in the range of 9-12 MeV. The imager is a pinhole camera where the pinhole is located 325 mm from the target and the imaging plane is located 28 m from the target. The long absorption length of neutrons requires precise alignment of these extended imager components in order to have high detection efficiency and strong background rejection. The imaging plane is a 150 mm square scintillating fiber bundle 50 mm thick. The bundle consists of 250 μm square fibers. The fiber bundle is aligned such that the fibers point at the target. The pointing is accomplished using a retro reflection of a laser alignment device aligned to the imager line of sight. The 200 mm long pinhole is aligned to the imager line of sight using the Opposed Port Alignment System. The imager line of sight was registered to the alignment system to calculate the precise position of the pinhole. The ability of the positioning manipulator to both place and maintain the precise location of the pinhole, were monitored using the positioning imaging system as well as laser alignment device. Here we describe the various aspects of the imaging system alignment to enable the acquisition of neutron images as well as the estimated pointing errors of the first shot imaged.
The 192 laser beams in the National Ignition Facility (NIF) are automatically aligned to the target-chamber center using images obtained through charged-coupled-device (CCD) cameras. Several of these cameras are in and around the target chamber during an experiment. Current experiments for the National Ignition Campaign are attempting to achieve nuclear fusion. Neutron yields from these high-energy fusion shots expose the alignment cameras to neutron radiation. The present work explores modeling and predicting laser alignment performance degradation due to neutron radiation effects, and introduces techniques to mitigate performance degradation. Camera performance models have been created based on the predicted camera noise from the cumulative neutron fluence at the camera location. We have found that the effect of the neutron-generated noise for all shots to date have been well within the alignment tolerance of half a pixel, and image processing techniques can be utilized to reduce the effect even further on the beam alignment to target.
The National Ignition Facility in Livermore, California, completed it's commissioning milestone on March 10, 2009 when it fired all 192 beams at a combined energy of 1.1 MJ at 351nm. Subsequently, a target shot series from August through December of 2009 culminated in scale ignition target design experiments up to 1.2 MJ in the National Ignition Campaign. Preparations are underway through the first half of of 2010 leading to DT ignition and gain experiments in the fall of 2010 into 2011. The top level requirement for beam pointing to target of 50μm rms is the culmination of 15 years of engineering design of a stable facility, commissioning of precision alignment, and precise shot operations controls. Key design documents which guided this project were published in the mid 1990's, driving systems designs. Precision Survey methods were used throughout construction, commissioning and operations for precision placement. Rigorous commissioning processes were used to ensure and validate placement and alignment throughout commissioning and in present day operations. Accurate and rapid system alignment during operations is accomplished by an impressive controls system to align and validate alignment readiness, assuring machine safety and productive experiments.
The National Ignition Facility (NIF) is currently the largest and most energetic laser system in the world. The main amplifiers are driven by the Injection Laser System comprised of the master oscillators, optical preamplifiers, temporal pulse shaping and spatial beam formatting elements and injection diagnostics. Starting with two fiber oscillators separated by up to a few angstroms, the pulse is phase modulated to suppress SBS and enhance spatial smoothing, amplified, split into 48 individual fibers, and then temporally shaped by an arbitrary waveform generator. Residual amplitude modulation induced in the preamplifiers from the phase modulation is also pre-compensated in the fiber portion of the system before it is injected into the 48 pre-amplifier modules (PAMs). Each of the PAMs amplifies the light from the 1 nJ fiber injection up to the multi-joule level in two stages. Between the two stages the pre-pulse is suppressed by 60 dB and the beam is spatially formatted to a square aperture with pre-compensation for the nonuniform gain profile of the main laser. The input sensor package is used to align the output of each PAM to the main laser and acquire energy, power, and spatial profiles for all shots. The beam transport sections split the beam from each PAM into four main laser beams (with optical isolation) forming the 192 beams of the NIF. Optical, electrical, and mechanical design considerations for long term reliability and availability will be discussed. Work performed under the auspices of the U. S. Department of Energy under contract W-7405-Eng-48.
One of the major purposes of National Ignition Facility at Lawrence Livermore National Laboratory is to accurately focus 192 high energy laser beams on a nanoscale (mm) fusion target at the precise location and time. The automatic alignment system developed for NIF is used to align the beams in order to achieve the required focusing effect. However, if a distorted image is inadvertently created by a faulty camera shutter or some other opto-mechanical malfunction, the resulting image termed "off-normal" must be detected and rejected before further alignment processing occurs. Thus the off-normal processor acts as a preprocessor to automatic alignment image processing. In this work, we discuss the development of an "off-normal" pre-processor capable of rapidly detecting the off-normal images and performing the rejection. Wide variety of off-normal images for each loop is used to develop the criterion for rejections accurately.
The National Ignition Facility at LLNL recently commissioned the first set of four beam lines into the target chamber. This effort, called NIF Early Light, demonstrated the entire laser system architecture from master oscillator through the laser amplifiers and final optics to target and initial X-ray diagnostics. This paper describes the major installation and commissioning steps for one of NIF's 48 beam quads. Using a dedicated single beam line Precision Diagnostic System, performance was explored over the entire power versus energy space up to 6.4 TW/beam for sub-nanosecond pulses and 25 kJ/beam for 23 ns pulses at 1w. NEL also demonstrated frequency converted Nd:Glass laser energies from a single beamline of 11.3 kJ at 2w and 10.4 kJ at 3w.
The National Ignition Facility (NIF) at the Lawrence Livermore National Laboratory is a stadium-sized facility containing a 192-beam, 1.8-Megajoule, 500-Terawatt, ultraviolet laser system. High-energy-density and inertial confinement fusion physics experiments require the ability to precisely align and focus pulses with single beam energy up to 20KJ in a few nanoseconds onto mm-sized targets. NIF's alignment control system now regularly provides automatic alignment of the four commissioned beams prior to every NIF shot in approximately 45min., and speed improvements are being implemented. NIF utilizes adaptive optics for wavefront control, which significantly improves the ability to tightly focus each laser beam onto a target. Multiple sources of both static and dynamic aberration are corrected. This presentation provides an overview of the NIF Automatic Alignment and Wavefront Control Systems including the accuracy and target spot size performance achieved.
Welcome to the Eleventh Annual C.A.S.I.S. Workshop, a yearly event at the Lawrence Livermore National Laboratory, presented by the Center for Advanced Signal & Image Sciences, or CASIS, and sponsored by the LLNL Engineering Directorate. Every November for the last 10 years we have convened a diverse set of engineering and scientific talent to share their work in signal processing, imaging, communications, controls, along with associated fields of mathematics, statistics, and computing sciences. This year is no exception, with sessions in Adaptive Optics, Applied Imaging, Scientific Data Mining, Electromagnetic Image and Signal Processing, Applied Signal Processing, National Ignition Facility (NIF) Imaging, and Nondestructive Characterization.
EUVL is an emerging technology for fabrication of sub-100 nm feature sizes on silicon, following the SIA roadmap well into the 21st Century. The specific EUVL system described is a scanned, projection lithography system with a 4:1 reduction, using a laser plasma EUV source. The mask and all of the system optics are reflective, multilayer mirrors which function in the extreme UV at 13.4 nm wavelength. Since the masks are imaged to the wafer exposure plane, mask defects greater than 80 percent of the exposure plane CD will in many cases render the mask useless, whereas intervening optics can have defects which are not a printing problem. For the 100 nm node, we must reduce defects to less than 0.01/cm2 at 80 nm or larger to obtain acceptable mask production yields. We have succeeded in reducing the defects to less than 0.1/cm2 for defects larger than 130 nm detected by visible light inspection tools, however our program goal is to achieve 0.01/cm2 in the near future. More importantly though, we plan to have a detailed understanding of defect origination and the effect on multilayer growth in order to mitigate defects below the ion-beam multilayer deposition tool, details of the defect detection and characterization facility, and progress on defect printability modeling.
We have developed amplitude and phase modulation systems for glass lasers using integrated electro-optic modulators and solid state high-speed electronics. The present and future generation of lasers for Inertial Confinement Fusion require laser beams with complex temporal and phase shaping to compensate for laser gain saturation, mitigate parametric processes such as transverse stimulated Brillouin scattering in optics, and to provide specialized drive to the fusion targets. These functions can be performed using bulk optoelectronic modulators, however using high-speed electronics to drive low voltage integrated optical modulators has many practical advantages. In particular, we utilize microwave GaAs transistors to perform precision, 250 ps resolution temporal shaping. Optical bandwidth is generated using a microwave oscillator at 3 GHz amplified by a solid state amplifier. This drives an integrated electrooptic modulator to achieve laser bandwidths exceeding 30 GHz.
We describe the prototype preamplifier for the NIF laser system and discuss the performance of the regenerative amplifier and 4-pass laser systems that comprise the preamplifier.