Studies of possible energy upgrades of the Large Hadron Collider (LHC) aim at increasing the current nominal beam energy of 7 TeV in view of expanding the discovery potential and physics reach of the LHC. Some critical aspects of the feasibility of partial or full energy upgrades are studied here, together with novel mitigation measures. Higher beam energies can be realized by pushing the installed main dipoles to their limits or by replacing different fractions of installed magnets. Moreover, a revised lattice design for a full energy upgrade, also known as the high-energy LHC (HE-LHC), is presented. The studies reported focus on the linear optics design and on the lattice layout. In particular, an optics with 60 degrees transverse phase advance in the regular arc cells, meant to alleviate the strength requirements for the main quadrupoles, has been designed in view of possible beam tests during the next LHC run 3. The methods developed in this article, for matching the ring geometry to a reference tunnel, for improving the beam aperture, and for minimizing the required field strengths for new high-energy LHC-like machines, will also be applicable to other future circular collider projects.
We present updated design parameters for a future HighEnergy LHC. A more realistic turnaround time has led to a revision of the target peak luminosity, as well as a choice of a larger IP beta function, and longer physics fills. Pushed parameters of the Nb3Sn superconducting cable together with a modified layout of the 16 T dipole magnets resulted in revised field errors, updated dynamic-aperture simulations, and an associated re-evaluation of injector options. Collimators in the dispersion suppressors help achieve satisfactory cleaning performance. Longitudinal beam parameters ensure beam stability throughout the cycle. Intrabeam scattering rates and Touschek lifetime appear benign.
In response to the 2013 Update of the European Strategy for Particle Physics (EPPSU), the Future Circular Collider (FCC) study was launched as a world-wide international collaboration hosted by CERN. The FCC study covered an energy-frontier hadron collider (FCC-hh), a highest-luminosity high-energy lepton collider (FCC-ee), the corresponding 100km tunnel infrastructure, as well as the physics opportunities of these two colliders, and a high-energy LHC, based on FCC-hh technology. This document constitutes the third volume of the FCC Conceptual Design Report, devoted to the hadron collider FCC-hh. It summarizes the FCC-hh physics discovery opportunities, presents the FCC-hh accelerator design, performance reach, and staged operation plan, discusses the underlying technologies, the civil engineering and technical infrastructure, and also sketches a possible implementation. Combining ingredients from the Large Hadron Collider (LHC), the high-luminosity LHC upgrade and adding novel technologies and approaches, the FCC-hh design aims at significantly extending the energy frontier to 100TeV. Its unprecedented centre of-mass collision energy will make the FCC-hh a unique instrument to explore physics beyond the Standard Model, offering great direct sensitivity to new physics and discoveries.
The High Energy Large Hadron Collider (HE-LHC), a possible successor of the High Luminosity Large Hadron Collider (HL-LHC) aims at reaching a centre-of-mass energy of about 27 TeV using basically the same 16 T dipoles as for the hadron-hadron Future Circular Collider FCC-hh. Designing the HE-LHC results in a trade off between energy reach, beam stay clear as well as geometry offset with respect to the LHC. In order to best meet the requirements, various arc cell and dispersion suppressor options have been generated and analysed, before concluding on two baseline options, which are presented in this paper. Merits of each design are highlighted and possible solutions for beam stay clear minima are presented.
In the frame of the FCC study we are designing a 27 TeV hadron collider in the LHC tunnel, called the High Energy LHC (HE-LHC). The HE-LHC can be realized by replacing the LHC’s 8.33 T niobium-titanium dipole magnets with 16 T niobium-tin magnets developed for FCC-hh. A high-quality beam available from the upgraded LHC injector complex and significant radiation damping allow achieving the challenging target values for both peak and integrated luminosity required by particle physics. Tunnel integration determines the maximum outer size of the magnet cryAPCostat. The HE-LHC arc optics maximizes the dipole filling factor and optimizes the dynamic aperture, while limiting the field strengths of quadrupoles and sextupoles. The low-beta optics for the experimental insertions features a shielded quadrupole triplet even longer than the HL-LHC’s, which can support an interaction-point beta function of 25 cm, and survive an integrated luminosity above 10/ab. Other challenges include collimation and extraction. The choice of injection energy and injector is another important element, and so are various collective effects. We here report the HE-LHC design status.
The High Energy LHC (HE-LHC) proton-proton collider is a proposed replacement of the LHC in the existing 27-km tunnel, with the goal of reaching the centre-ofmass beam energy of 27 TeV. The required higher dipole field can be realized by using 16-T dipoles being developed for the FCC-hh design. A major concern is the dynamic aperture at injection energy due to degraded field quality of the new dipole based on Nb3Sn superconductor, the potentially large energy swing between injection and collision, and the slightly reduced magnet aperture. Another issue is the field in quadrupoles and sextupoles at top energy, for which it may be cost-effective, wherever possible, to stay with Nb-Ti technology. In this study, we explore design options differed by arc lattice, for three choices of injection energy, with the goal of attaining acceptable magnet field and maximum injection dynamic aperture with dipole non-linear field errors.
So far, the massive numerical simulation studies of the LHC dynamic aperture were performed using thin lens models of the machine. This approach has the clear advantage of speed, but it has also the disadvantage of requiring re-matching of the optics from the real thick configuration to the thin one. The figure-of-merit for the rematching is the agreement between the beta-functions for the two models. However, the quadrupole gradients are left as free parameters, thus, the impact of the magnetic multipoles might be affected by this approach. In turns, the dynamic aperture computation could be changed. In this paper the new approach is described and the results for the dynamic aperture are compared with the old approach, including detailed considerations on the CPU-time requirements.
The Large Hadron Electron Collider (LHeC) aims at lepton-proton and lepton-nucleus collisions with centre of mass energies of 1–2 TeV at ep luminosities in excess of 10 33 cm -2 s -1 . We present here a lattice design for the electron ring option, which meets the design parameters and also the constraints imposed by the integration of the new electron ring in the LHC tunnel.
Initial commissioning of the LHC beam dump system with beam took place in August and September 2008. The preparation, setting-up and the tests performed are described together with results of the extractions of beam into the dump lines. Analysis of the first detailed aperture measurements of the extraction channels and kicker performance derived from dilution sweep shapes are presented. The performance of the other equipment subsystems is summarised, in particular that of the dedicated dump system beam instrumentation.
The beam dynamics in the LHC require a tight control of the field quality and geometry of its magnets. At the EPAC06 we presented the simulation tool WISE which generates magnetic field errors to be used as input to the MAD-X program. This paper describes the evolution in the WISE software since EPAC06. The allocation of magnets to lattice positions is completed, and therefore there is no more need for simulated allocations. Geometric axis measurements are now available for all cryostats. Furthermore, survey data is available to estimate the precision of the magnet installation (alignment). This paper discusses how the new data is used in connection with MAD-X simulations to give the most recent figures for beta-beating at injection (450 GeV) and collision energy (7 TeV).
The betatron coupling introduced by the experimental solenoids in the LHC is small at injection and negligible at collision energy. We present a study of these effects and look at possible corrections. Additionally we report about the implementation of solenoids in the MAD-X program. A thin solenoid version is also made available for tracking purposes.
Injection intensities for the LHC are over an order of magnitude above damage level. The TI 2 and TI 8 transfer lines between the SPS and LHC are each about 2.5 km long and comprise many active elements running in pulsed mode. The collimation system in the transfer lines is designed to dilute the beam energy sufficiently in case of accidental beam loss or mis-steered beam. A system using three collimator families spaced by 60 degrees in phase advance, both in the horizontal and the vertical plane has been chosen. We discuss the reasons for this choice, the layout and, the expected performance of the system in terms of maximum amplitudes and energy deposition.
The betatron coupling introduced by the experimental solenoids in the LHC is small at injection and negligible at collision energy. We present a study of these effects and look at possible corrections. Additionally we report about the implementation of solenoids in the MAD-X program. A thin solenoid version is also made available for tracking purposes.
The beam dynamics in LHC requires a tight control of the field quality and geometry of the magnets. As the production advances, decisions have to be made on the acceptance of possible imperfections. To ease decision making, an adaptative model of the LHC optics has been built, based on the information available on the day (e.g. magnetic measurements at warm or cold, magnet allocation to machine slots) as well as on statistical evaluations for the missing information (e.g. magnets yet to be built, measured, or for non-allocated slots). The uncertainties are included: relative and absolute measurement errors, warm-to-cold correlations for the fraction of magnets not measured at cold, hysteresis and power supply accuracy. The pre-processor WISE generates instances of the LHC field errors for the MAD-X program, with the possibility of selecting various sources. We present an application to estimate the expected beta-beating
It is customary to evaluate the performance of a circular particle accelerator by computing the dynamical aperture, i.e. the domain in phase space where bounded single- particle motion occurs. In the case of the LHC the dynamical aperture computation is performed by assuming a statistical distribution of the magnetic field errors of various magnets classes: the numerical computations are repeated for a given set of realisations of the LHC ring. With the progress in the magnet production and allocation of the available positions in the ring, the statistical approach has to be replaced by the computation of one single configuration, namely the actual realisation of the machine. Comparisons between the two approaches are presented and discussed in details.
An excellent match between the SPS, the several kilometres long transfer lines and the LHC will be required to minimise emittance blow-up at injection. Several optics changes in the SPS and the LHC injection insertions had to be accommodated in the design phase. The new 3-phase collimation system in the transfer lines results in additional phase advance constraints. It will be important to maintain some tuning range for the LHC commissioning phase and to accommodate possible further optics changes. We analyse the requirements, the constraints, the current status and options to enhance the optics flexibility.