Launch window design for the Magnetospheric Multiscale (MMS) mission ensured that no excessive eclipses would be encountered during the prime mission. However, no orbit solutions exist that satisfy the eclipse constraints indefinitely: most extended mission years contain 1-3 eclipses long enough to potentially damage either the spacecraft or its scientific instruments. Two steps were taken to improve the situation. Firstly, raising apogee radius from 25 to 29.34 Earth radii altered the Sun-Earth-MMS phasing, so efficiently achieving reductions in the long eclipse durations. These maneuvers were performed in February 2019, in preparation for the first pair of long eclipses during the subsequent August. Secondly, a set of operational steps were taken around the time of the eclipses to help maintain spacecraft and instrument temperatures while preventing power load shedding. These steps included raising key onboard temperatures through adjusting the spacecraft attitude to tilt the instrument deck towards the Sun, and engaging select heaters prior to going into eclipses. In addition, all scientific instruments were turned off, as well as high-power, non-critical spacecraft systems, to conserve energy. These steps each came with trade-offs which will be discussed in the paper. Finally, the results that were obtained when the spacecraft experienced the first set of extremely long eclipses will be discussed, as will lessons learned for future long eclipses.
For highly eccentric orbits such as that of the Magnetospheric Multiscale (MMS) mission, with apogee radius now 29.34 Earth radii, the third-body effects of Sun and Moon are the major perturbations. One key consequence is an oscillation in MMS perigee altitude, on an approximately 6 year cycle. This variation has already required perigee-raise maneuvers to avoid an untimely reentry. There is also a long-term evolution in the orientation of the MMS orbit, with period roughly twice as long. This effect may potentially be useful for MMS science studies, as it can bring the spacecraft into new regions of the magnetosphere.
This paper describes maneuvers that were recently considered for a later extended mission phase for the Magnetospheric Multiscale (MMS) mission. These are apogee raises to set up a lunar gravity assist, which in turn raises perigee for enhanced magnetopause science collection, followed by apogee-lowering to inject into a 3:1 lunar resonance orbit. Since a lunar encounter is only achievable when the MMS apogee vector lies approximately in the lunar orbit plane, the possible dates are mid-2021 or early 2027. This study was made feasible by the fact that MMS is consuming fuel for formation maintenance at a far slower rate than expected pre-flight, and completed the prime mission with a significant amount of fuel remaining.
This paper describes the apogee-raising campaign of the Magnetospheric Multiscale mission, where the spacecraft increased their apogee radii from 12 to 25 Earth radii in a total of 98 maneuvers. These maneuvers included an initial formation resize set to spread the spacecraft apart for safety, 32 apogee-raise delta v maneuvers, their associated slews, four perigee-raise maneuvers and the associated slews, and finally a set of maneuvers to get back into formation. These activities were all accomplished successfully and on schedule with no anomalies, and at a fuel consumption somewhat less than predicted. As a result, MMS was set up ready to carry out in situ studies of magnetic reconnection in the magneto tail, with sufficient fuel remaining for a significant extended mission.
Past and current magnetosphere missions employ conventional spacecraft formations for in situ observations of the geomagnetic tail. Conventional spacecraft flying in inertially fixed Keplerian orbits are only aligned with the geomagnetic tail once per year, since the geomagnetic tail is always aligned with the Earth-Sun line, and therefore, rotates annually. Solar sails are able to artificially create sun-synchronous orbits such that the orbit apse line remains aligned with the geomagnetic tail line throughout the entire year. This continuous presence in the geomagnetic tail can significantly increase the science phase for magnetosphere missions. In this paper, the problem of solar sail formation design is explored using nonlinear programming to design optimal two-craft, triangle, and tetrahedron solar sail formations, in terms of formation quality and formation stability. The designed formations are directly compared to the formations used in NASA’s Magnetospheric Multi-Scale mission.
The MMS spacecraft are highly instrumented (accelerometers, star cameras, Sun sensors, science experiments for plasmas etc.). This presentation will discuss how data from these systems has allowed two micrometeoroid/orbital debris events to be studied: the Feb. 2, 2016 impact with an MMS4 shunt resistor, and the June 12, 2016 impact with an MMS4 wire boom.
This paper describes the underlying dynamics of formation flying in a high-eccentricity orbit such as that of the Magnetospheric Multiscale mission. The GPS-based results used for MMS navigation are summarized, as well as the procedures that are used to design the maneuvers used to place the spacecraft into a tetrahedron formation and then maintain it. The details of how to carry out these maneuvers are then discussed. Finally, the numerical results that have been obtained concerning formation flying for the MMS mission to date (e.g. tetrahedron sizes flown, maneuver execution error, fuel usage, etc.) are presented in detail.
This paper will describe the results that have been obtained to date during the MMS mission concerning conjunction assessment. MMS navigation makes use of a weak-signal GPS-based system: this allows signals to be received even when MMS is flying above the GPS orbits, producing a highly accurate determination of the four MMS orbits. This data is downlinked to the MMS Mission Operations Center (MOC) and used by the Flight Dynamics Operations Area (FDOA) for both maneuver design and conjunction assessment. The MMS fly in tetrahedron formations around apogee, in order to collect simultaneous particles and fields science data. The original plan was to fly tetrahedra between 10 and 160 km in size; however, after Phase 1a of the mission, the science team requested that smaller sizes be flown if feasible. After analysis (to be detailed in a companion paper), a new minimum size of 7 km was decided upon. Flying at this reduced scale size makes conjunction assessment between the MMS spacecraft even more important: the methods that are used by the MMS FDOA to address this problem will be described in the paper, and a summary given of the previous analyses that went into the development of these techniques. Details will also be given of operational experiences to date. Finally, two CA mitigation maneuver types that have been designed (but never yet required to actually be performed) will also be outlined.
Extensive flight data is being collected throughout the MMS mission that includes quantities that are of interest for attitude dynamics studies such as spin rate, spin axis orientation nutation rate, etc. One example of such data is the long-term evolution of the spin rates of the four spacecraft. Spikes in these rates are observed that are separated by the MMS orbital period (just under 24 hr) and occur around perigee due to gravity-gradient torque. Periodic discontinuities in spin rate are caused by the controller resetting the spin rate approximately to the nominal 3.1 RPM value at the time of each maneuver. In between, a slow decay in spin rate can be seen to occur. The paper will discuss various disturbance torque mechanisms that could potentially be responsible for this behavior: these include magnetic hysteresis, eddy currents, solar radiation pressure, and a possible interaction between gravity-gradient and wire boom flexibility effects. One additional disturbance mechanism is produced by the Active Spacecraft Potential Control (ASPOC) devices: these emit positive indium ions to keep the MMS spacecraft electrically neutral, so as not to corrupt the electric field observations that are made by some of the on-board instruments. The spin rate decays that could be produced by these various mechanisms will be quantified in the paper, and their signatures described. Comparing these with the observations from flight data then allow the most likely candidate to be determined.
This paper will describe the results that have been obtained to date concerning MMS formation flying. The MMS spacecraft spin at a rate of 3.1 RPM, with spin axis roughly aligned with Ecliptic North. Several booms are used to deploy instruments: two 5 m magnetometer booms in the spin plane, two rigid booms of length 12.5 m along the positive and negative spin axes, and four flexible wire booms of length 60 m in the spin plane. Minimizing flexible motion of the wire booms requires that reorientation of the spacecraft spin axis be kept to a minimum: this is limited to attitude maneuvers to counteract the effects of gravity-gradient and apparent solar motion. Orbital maneuvers must therefore be carried out in essentially the nominal science attitude. These burns make use of a set of monopropellant hydrazine thrusters: two (of thrust 4.5 N) along the spin axis in each direction, and eight (of thrust 18 N) in the spin plane; the latter are pulsed at the spin rate to produce a net delta-v. An on-board accelerometer-based controller is used to accurately generate a commanded delta-v. Navigation makes use of a weak-signal GPS-based system: this allows signals to be received even when MMS is flying above the GPS orbits, producing a highly accurate determination of the four MMS orbits. This data is downlinked to the MMS Mission Operations Center (MOC) and used by the MOC Flight Dynamics Operations Area (FDOA) for maneuver design. These commands are then uplinked to the spacecraft and executed autonomously using the controller, with the ground monitoring the burns in real time.
Solar radiation pressure is one of the largest perturbing forces on the OSIRIS-Rex trajectory as it orbits the asteroid Bennu. In this work, we investigate how forces due to solar radiation perturb the OSIRIS-REx trajectory in a high-fidelity model. The model accounts for Bennu's non-spherical gravity field, third-body gravity forces from the Sun and Jupiter, as well as solar radiation forces acting on a simplified spacecraft model. Such high-fidelity simulations indicate significant solar radiation pressure perturbations from the nominal orbit. Modifications to the initial design of the nominal orbit are found using a variation of parameters approach that reduce the perturbation in eccentricity by a factor of one-half.
While collisions between the four MMS spacecraft are unlikely, the consequence of a collision between two spacecraft is mission failure. The MMS mission design requirements state that no more than 1 in 1000 unsafe close approaches may remain undetected. However, mission operators and the science team require that collision risk mitigation maneuvers are not excessively frequent and hence that no more than 1 in 20 collision alarms may occur when the conjunction is safe. These competing requirements-collision avoidance conservatism vs. unnecessary interruption of science activities and inconvenience to the ground system-induce the conjunction assessment Operations Concept for the MMS mission.
The Transiting Exoplanet Survey Satellite (TESS) is a National Aeronautics and Space Administration (NASA) mission, scheduled to be launched in 2017. TESS will travel in a highly eccentric orbit around Earth, with initial perigee radius near 17 Earth radii (Re) and apogee radius near 59 Re. The orbit period is near 2:1 resonance with the Moon, with apogee nearly 90 degrees out-of-phase with the Moon, in a configuration that has been shown to be operationally stable. TESS will execute phasing loops followed by a lunar flyby, with a final maneuver to achieve 2:1 resonance with the Moon. The goals of a resonant orbit with long-term stability, short eclipses and limited oscillations of perigee present significant challenges to the trajectory design. To rapidly assess launch opportunities, we adapted the Schematics Window Methodology (SWM76) launch window analysis tool to assess the TESS mission constraints. To understand the long-term dynamics of such a resonant orbit in the Earth-Moon system we employed Dynamical Systems Theory in the Circular Restricted 3-Body Problem (CR3BP). For precise trajectory analysis we use a high-fidelity model and multiple shooting in the General Mission Analysis Tool (GMAT) to optimize the maneuver delta-V and meet mission constraints. Finally we describe how the techniques we have developed can be applied to missions with similar requirements. Keywords: resonant orbit, stability, lunar flyby, phasing loops, trajectory optimization
The NASA Magnetospheric Multiscale (MMS) mission will fly four spinning spacecraft in formation in highly elliptical orbits to study the magnetosphere of the Earth. This paper describes the development of an MMS launch window tool that uses the orbitaveraged Variation of Parameter equations as the basis for a semi-analytic quantification of the dominant oblateness and lunisolar perturbation effects on the MMS orbit. This approach, coupled with a geometric interpretation of all of the MMS science and engineering constraints, allows a scan of 180(sup 2) = 32,400 different (RAAN, AOP) pairs to be carried out for a specified launch day in less than 10 s on a typical modern laptop. The resulting plot indicates the regions in (RAAN, AOP) space where each constraint is satisfied or violated: their intersection gives, in an easily interpreted graphical manner, the final solution space for the day considered. This tool, SWM76, is now used to provide launch conditions to the full fidelity (but far slower) MMS simulation code: very good agreement has been observed between the two methods.
Many space mission planning problems may be formulated as hybrid optimal control problems, that is, problems that include both real-valued variables and categorical variables. In orbital mechanics problems, the categorical variables will typically specify the sequence of events that qualitatively describe the trajectory or mission, and the real-valued variables will represent the launch date, flight times between planets, magnitudes and directions of rocket burns, flyby altitudes, etc. A current practice is to preprune the categorical state space to limit the number of possible missions to a number whose cost may reasonably be evaluated. Of course, this risks pruning away the optimal solution. The method to be developed here avoids the need for prepruning by incorporating a new solution approach. The new approach uses nested loops: an outer-loop problem solver that handles the finite dynamics and finds a solution sequence in terms of the categorical variables, and an inner-loop problem solver that finds the optimal trajectory for a given sequence A binary genetic algorithm is used to solve the outer-loop problem, and a cooperative algorithm based on particle swarm optimization and differential evolution is used to solve the inner-loop problem. The hybrid optimal control solver is successfully demonstrated here by reproducing the Galileo and Cassini missions.
Many space mission planning problems may be formulated as hybrid optimal control problems, i.e. problems that include both real-valued variables and categorical variables. In orbital mechanics problems the categorical variables will typically specify the sequence of events that qualitatively describe the trajectory or mission, and the real-valued variables will represent the launch date, flight times between planets, magnitudes and directions of rocket burns, flyby altitudes, etc. A current practice is to pre-prune the categorical state space to limit the number of possible missions to a number whose cost may reasonably be evaluated. Of course this risks pruning away the optimal solution. The method to be developed here avoids the need for pre-pruning by incorporating a new solution approach. The new approach uses nested loops; an outer-loop problem solver that handles the finite dynamics and finds a solution sequence in terms of the categorical variables, and an inner-loop problem solver that finds the optimal trajectory for a given sequence A binary genetic algorithm is used to solve the outer-loop problem, and a cooperative algorithm based on particle swarm optimization and differential evolution is used to solve the inner-loop problem. The HOCP solver is successfully demonstrated here by reproducing the Galileo and Cassini missions.
The MMS mission consists of four identical spinning spacecraft in a tetrahedron-like formation during predefined orbital regions-of-interest [1]. The MMS formation will fly about a highly eccentric orbit to study magnetic reconnection in the Earth.s magnetosphere. The mission is divided in two main science phases of markedly different orbit size. Phase 1 is a 1.2 R(sub E) x 12 R(sub E) (R(sub E) equals one Earth radius) orbit phase where science will be performed on the day-side of the magnetosphere, and Phase 2 is a 1.2 R(sub E) x 25 R(sub E) orbit phase where science will be performed on the night-side of the magnetosphere. For each phase, the MMS formation initially will fly a series of tetrahedron sizes ranging between 10-km and 400-km to assist the science team in determining the best value for the remainder of the phase. This paper presents a preliminary comparison of the algorithms currently available to determine desired MMS formation states. After a brief description of the MMS formation flying metrics and associated requirements, the five formation design algorithm combinations considered here are presented. Monte Carlo simulations determine the performance of each algorithm defined in terms of formation lifetime and fuel consumption. Preliminary results focusing on the smaller formation size for Phase 1 are discussed and the conclusions are presented along with indications for future work.
The four Magnetospheric Multi Scale (MMS) spacecraft are launched in a stack, and released sequentially by identical sets of springs. They then enter a four-month commissioning phase, during which they must: raise the perigee of their highly elliptical orbits from the initial altitude of 185 km, to avoid any possibility of subsequent imminent deorbit from lunisolar perturbations; deploy wire booms and other appendages; calibrate experiments, thrusters and navigation systems; and enter into the initial tetrahedron formation for science observations around apogee. This paper will discuss the design of the various maneuvers required during the commissioning phase, starting with the separation maneuvers.