为实现风电友好并网,具备针对系统变化的一次调频和主动调压能力,在国网风光储电站建设风电虚拟同步发电机示范工程.目前还没有统一的新能源科技示范工程建管模式,本文对风电虚拟同步发电机建设施工进度和安全质量管控加以阐述,探索风电科技项目建设的优化管理方案.
Wind power has become one of the renewable energy sources with mature technology, economic feasibility and wide application in the world, however, wind farms in our country are at the end of the regional power grid, so their power grid structure and safety and stability are relatively weak. Wind farm accident is likely to bring high wind power penetration, and it may even change the power flow distribution of the regional power grid in which the accident happens, which threatens the static and transient stability of the whole power grid. Research is made on the power system with wind farm, and according to the impact of wind farm on the vulnerability of grid operation state, method of forecasting power grid cascading failures under the condition of wind farm integration is proposed. Wind power grid-connected capacity and ways of grid-connection of wind farm and the impact of wind farm accident upon power grid cascading failures are studied. Simulation analysis of IEEE-57 bus system verifies the rationality, feasibility and validity of the proposed forecasting method.