• 学术搜索
  • 科研智能体
    • Research Labs
    • AI 阅读
    • AI 文库
    • 深度研究
    • 学者亮点
  • 学术资源
    • AI2000
    • 期刊/会议
    • 学者库
    • 学术API
      MCP&Skill
    • 溯源树
    • 数据集
  • 知识沉淀
    • 学术空间
订阅小程序
旧版功能
aminer vip
开通会员低至0.73元/天
一次搞定AI科研
立即登录
  • English
  • 联系方式
    A

    Alberta Energy

    EST. 1984
    67论文总数
    903引用总数

    The Ministry of Energy is a Cabinet-level agency of the government of the Canadian province of Alberta responsible for coordinating policy relating to the development of mineral and energy resources. It is also responsible for assessing and collecting non-renewable resource (NRR) royalties, freehold mineral taxes, rentals, and bonuses. The Alberta Petroleum Marketing Commission, which is fully integrated with the Department of Energy within the ministry, and fully funded by the Crown, accepts delivery of the Crown's royalty share of conventional crude oil and sells it at the current market value.The Alberta Energy and Utilities Board regulated energy resource development, pipelines, transmission lines, and investor-owned electric, water, and natural gas utilities, as well as certain municipality-owned utilities. It reported to the Executive Council through the Ministry of Energy, although it operated and made its formal decisions independently and autonomously.

    论文量&引用量时间轴

    机构学者

    论文(67)

    年份
    起
    –
    止
    排序
    1MXenes for Solid-State Batteries: Progress, Challenges, and Perspectives for Advanced Energy Storage
    Syed Muhammad Zain Mehdi,Sunil Kumar, Fahad Aldakheel,Zaeem Ur Rehman,Manish Taunk,Muhammad Faheem Maqsood, Muzahir Ali

    Solid-state batteries (SSBs) are emerging as a transformative solution for high-energy-density and intrinsically safe energy storage systems. Challenges, such as low ionic conductivity, poor interfacial contact, and lithium dendrite formation, continue to impede their large-scale adoption despite significant advances in electrochemical stability, thermal resilience, and compact cell design. MXenes are a novel family of 2D transition metal carbides and nitrides that have shown great promise to overcome these limitations due to their tunable surface terminations, high conductivity, and structural versatility. This review explores the recent breakthroughs in MXene-integrated all SSBs. It delves into their roles as functional fillers in solid-state electrolytes (SSEs) as well as interfacial layers, electrodes, and current collectors. We discuss synthesis strategies, surface engineering, and design principles that enable MXenes to enhance ionic transport, suppress dendrite growth, and improve interfacial compatibility. A foundational overview of MXene physicochemical properties that are relevant to SSBs is provided in addition to an evaluation of the key SSE characteristics. Finally, the review outlines critical challenges and future directions for the rational design of MXene-enabled SSB architectures. This review aims to accelerate the development of safe, durable, and high-performance SSBs by bridging a fundamental understanding with application-driven innovation.

    2026Journal of Alloys and Compounds(2026)
    引用
    AI阅读
    加入学术空间
    2Characterizing the Potential of Wind-Blown Lithium Sediments: A Case Study from Devonian Evaporites of the Western Canada Sedimentary Basin
    Cody N. Lazowski, Scott Melnyk, Daniela Gutierrez-Rueda,Jiuyuan Wang,Lidya G. Tarhan,Tyler E. Hauck,Daniel S. Alessi,Kurt O. Konhauser,Murray K. Gingras

    Elevated lithium (Li) within the formational waters of deep sedimentary basins continues to garner attention as a widespread addition to global Li resources. However, the nature of Li emplacement remains understudied. Here we document elevated Li in Devonian evaporites of the Western Canada Sedimentary Basin and reconstruct the processes that led to their enrichment. Our results show bulk Li concentrations ranging from 49.4 ppm to 284 ppm. Contrary to previous speculation that Li is hosted within evaporitic minerals, our findings indicate that it is instead within aggregate grains of clay-sized particles composed of micas and clay minerals. The Li-bearing grains range from subangular to rounded, displaying a bimodal distribution with particle fractions of either medium- to coarse-grained silt or very fine sand. The individual particles average 304 ppm Li and attain concentrations as high as 394 ppm. Previous work has shown that Li was weathered from Precambrian basement and transported into the basin via fluvial discharge; however, no attempt has been made to characterize the distribution of these sediments by wind-borne processes. Thin sections reveal that these aggregate grains are widespread and that they dominantly occur in supratidal sediments, waning in abundance into lower intertidal deposits. Based on the particle distribution and several other lines of evidence, we suggest that these Li-rich detritals were deposited by wind-borne processes, and the results herein are the first to characterize the potential of wind-blown Li sediments. Given the extent of enrichment in these evaporites, we propose that aeolian processes play an important yet underappreciated role in transporting and accumulating Li-rich sediments. As alternative Li resources continue emerging, these findings highlight the potential of wind transport and provide a predictive framework for the paleogeographic distribution of Li-rich strata and their associations with Li-enriched brines.

    2025GEOLOGICAL SOCIETY OF AMERICA BULLETIN(2025)引用:3
    引用
    AI阅读
    加入学术空间
    3Revolutionizing Drilling: Integrating the Internet of Things (iot) and Cloud Technology into Remotely Operated Managed Pressure Drilling (MPD) and Tripping in Canada, Duvernay Formation
    A. Y. Sadat, C. Bilbao, C. Li, F. Angyal, K. Schmelzle

    As the IoT continues to transform drilling operations, technologies that were once restricted to local control can now be remotely operated through a collective network that connects local devices with the cloud. This paper presents a case study where IoT integration enabled an operator to leverage the advantages of managed pressure drilling (MPD) operations in the Duvernay formation, all within a carefully planned and remotely controlled environment, leading to cost savings and more effective drilling operations. A hydraulics model was initially set up on an operating panel in the doghouse using MPD software, enabling direct remote access and integration with the rig's electronic drilling recorder. This allowed MPD equipment on-site to be operated locally or remotely. With the operating panel connected to the cloud, remote operators could manipulate MPD parameters before or during operations. Given that IoT and cloud technology were critical to safely operating the MPD equipment remotely, all personnel were briefed on the associated risks. Drillers received additional training to handle situations that prevented remote operators from controlling the equipment. Over the course of nine wells, constant bottomhole pressure (BHP) was remotely automated and applied to the wellbore, targeting anywhere between 1,750 to 1,900 kg/m³ at the landing point or Duvernay Top on connections during drilling. A little over 37,800 meters were drilled with MPD equipment operated remotely from Calgary and Houston. Remote operators also assisted with tripping operations, maintaining a dynamic target pressure at BH to mitigate swab effects while stripping out of the hole. To ensure the hydraulics model accurately reflected current well parameters, constant communication between on-site representatives, drillers, remote operators, engineers, and other vendors (e.g., drilling fluids, directional, and cementers) was recognized as an essential requirement, in which an integrated chat application and communication devices were all utilized. The success of drilling these nine different curves and laterals in the Duvernay, with no incidents, reflects the effectiveness of integrating IoT and cloud technology into traditionally manual operations, despite the challenges which were addressed through considerate pre-planning and execution. The use of IoT and cloud technology for remotely controlling MPD equipment is still uncommon in the drilling industry. This paper provides practical insights into the application of these technologies in actual drilling operations within the Duvernay formation. While it demonstrates the feasibility of IoT and cloud integration in MPD operations, it can also highlight potential future challenges and lessons learned in safely operating and controlling MPD equipment and software remotely

    2025SPE Canadian Energy Technology Conference and Exhibition(2025)
    引用
    AI阅读
    加入学术空间
    4Thermal Well Screen Plugging: Revisiting an Old Challenge, Part 1: Role of Drilling Fluids in Screen Impairment
    Morteza Roostaei,Mahdi Mahmoudi, Colin Baillargeon, Da Zhu, Colby Sutton

    This paper presents results from novel tests investigating screen plugging and the factors that influence it. The study focuses on sand retention and flow convergence into screens, assuming formation collapse. Controlled experiments were conducted to evaluate the performance of different screens and the role of sand in plugging. The tests also explore how drilling and completion processes affect screen performance and plugging behavior. A novel test procedure was developed to simulate sand retention on screens. Screens with retained sand were placed in a flow apparatus to study multiphase flow behavior. A mix of sand and fines slurry was used to evaluate screen and near-screen plugging. The effect of mud and filter cake was assessed by allowing cake formation on the sand face before flowing. Additionally, the influence of temperature—up to 200°C—was examined to understand thermal impacts on screen plugging mechanisms under realistic downhole conditions. This study utilized three Particle Size Distribution (PSD) classes from the McMurray Formation to represent common variations in thermal project sands. A common polymeric mud, representative of the mud system used in thermal drilling, was employed. The thickness of the mud cake varied significantly among the three sands and was directly related to their permeability, with finer sands forming denser cakes that reduced retained permeability by over 55% in the lowest permeability class. Experiments during the drawdown phase revealed that wire-wrapped screens outperformed punch screens in permeability recovery due to enhanced channeling, with coarser PSDs showing better restoration (up to 72% retention). Thermal exposure at 200°C, intended to break down polymers, instead densified the cake with residue deposition, reducing post-steaming permeability by 5-30% depending on PSD, though wire-wrapped screens with 100-150 μm slots mitigated losses. Plugging occurred primarily at the sand-cake interface, emphasizing the need for near-screen management. These findings support preventive measures to minimize plugging and optimize thermal performance. This study aims to help engineers understand the key factors influencing screen plugging and the resulting high differential pressure drop between injectors and producers. The insights gained support the implementation of preventive measures to avoid or minimize screen plugging, improving overall system performance and reliability.

    2025SPE Thermal Well Integrity and Production Symposium(2025)
    引用
    AI阅读
    加入学术空间
    5Usage of a Coiled Tubing PWC Tool to Abandon Two Wells with Surface Casing Vent Flow on Onshore Australia
    Marcelo A. Jaculli, Erlend Engelsgjerd, Patrick Andersen, Eivind A. Knudsen, Markus Iuell, Ivar Holm, Stuart Butcher, Dayln Beazer, Janet Mignano, James Ashton

    The increase in plugging and abandonment (P&A) activities requires innovative solutions that can reduce costs, enhance operational efficiency, and reduce emissions while ensuring that Operators comply with local regulations, maintain environmental responsibility, and achieve P&A objectives. One solution is the introduction of a coiled tubing perf-wash-cement (PWC) tool, which can install cross-sectional cement barriers without rigs. In this paper, we present the basis of PWC via a case study of two wells decommissioned in Australia. The installation of the cross-sectional cement barriers was part of a 20-week P&A campaign to decommission two wells in the Bowen/Surat Basins, onshore Australia. Through zone selection in the P&A design, the objective was to improve cement barrier placement over a 60m interval behind production casing and remediate a surface casing vent flow (SCVF) problem while managing the effective isolation of multiple aquifer units. The solution needed to provide long-term well integrity while overcoming these complex conditions. Another challenge was that the operator could not establish circulation for a traditional perf & squeeze at the desired depths. Considering the location, tool availability, cost targets, and technical challenges, a decision was made to attempt a coiled tubing PWC operation. The tool was deployed successfully in September 2024, placing two cement plugs in each well, four plugs in total. Despite the complexity of the operation, all four plugs were installed within a three-week interval, which contributed to reducing the project timeline, with three out of four plugs each taking only 11 hours to complete. All four plugs were confirmed through tagging and pressure testing, in line with the Code of Practice (CoP), ensuring a good quality barrier was placed between the formation and the casing, capable of remediating any potential leak pathways. The combination of testing and the correct job execution – following the operational parameters set during job design and used previously in other similar PWC operations - was sufficient to successfully execute the four jobs, and to meet compliance with the QLD regulations and the CoP. Later monitoring, which consisted of monthly inspection during 6 months, confirmed that the observed issues of SCVF and SCP were remediated post-job. It can be concluded that the operation was successfully deployed using the coiled tubing PWC tool, achieving all the targets, which included operational efficiency that was set by the operator during the P&A design. This case study highlights the PWC flexibility as a method for annular remediation during plugging and abandonment in combination with coiled tubing and a mechanical perforator. This allowed for safe, environmentally responsible, and cost-effective P&A operations, remediating well integrity issues by permanently sealing potential leak pathways using cement. Such technology has many other well candidates in Australia (and worldwide) that could benefit from the flexibility provided by coiled tubing PWC, saving costs and reducing emissions.

    2025SPE Symposium - Asia Pacific Decommissioning and Well P&ampA(2025)
    引用
    AI阅读
    加入学术空间
    立即登录,查看全部 67 篇论文

    合作机构(32)

    阿尔伯塔大学合作论文 4
    Syncrude合作论文 2
    Toronto Public Health合作论文 2
    National Research Council (Canada)合作论文 2
    Suncor Energy (Canada)合作论文 1
    Select Engineering Services (United States)合作论文 1
    萨省大学合作论文 1
    曼尼托巴大学合作论文 1
    西蒙弗雷泽大学合作论文 1
    Nova Chemicals (Canada)合作论文 1

    机构统计