
The circular saw cutting slope has requirements on high excavation quality,little disturbance to slope rock mass and high slope stability.But the selection of slope cutting and excavation parameters is mainly based on the experience of operators so far,which restricts the application of the technology.Based on the mechanical mechanism of circular saw cutting and breaking rock,this paper adopts PFC3 D discrete element model to study the meso-mechanism of circular saw cutting and breaking rock,then it analyzes the key factors affecting the stability of slope.The results show that the forward speed and cutting depth of the saw blade are positively correlated with the damage degree of the slope rock mass.The larger the forward speed and cutting depth are,the more cracks are produced and the greater the damage to the slope rock mass is.There is little difference in the force of the saw blade between multiple cutting and single cutting at the same depth,but the number and range of cracks produced by multiple cutting are smaller than that of single cutting,that is,the damage to rock mass is smaller by multiple cutting.Rotation speed and direction have little influence on rock breaking effect.The research results could provide reference and basis for cut-ting and excavation of rock slope with circular saw.
In order to obtain a special airfoil for vertical axis wind turbines with good aerodynamic perform-ance and quantification,and to optimize the design of the airfoil with the method of combining the agent model with the genetic algorithm,an optimization algorithm with global convergence characteristics is pro-posed by using the agent model and the method of the genetic algorithm.Based on the CST,the parameter-ization of the geometry of the wind wing is completed by using the 7th-order Bernstein polynomial,the Kriging model is established to greatly shorten the optimization time,and the optimization efficiency and model fitting accuracy are improved by combining LHS and EI plus dots.Comparing and analyzing the opti-mized airfoil with the vertical axis wind turbine NACA0015,the results show that under the designed state,the lift coefficients of the optimized airfoil are increased by 7.81%and 4.42%,the tangential force co-efficients are increased by 10.82%and 6.00%,respectively,and the drag coefficients satisfy the requirement of the constraint conditions.
The fractured vuggy carbonate reservoir of Yijianfang formation in Yueman block of northern Tarim Basin is affected by both structure and karst.Different reservoir sizes and shapes differ greatly,and the reservoir heterogeneity is strong.Therefore,it is of great significance for the exploration and develop-ment of the study area to accurately describe the shape of reservoirs and the distribution of reservoirs in the study area.Based on the understanding of reservoir characteristics and vertical development law of reser-voir,combined with seismic,logging and other data,the reservoir modeling of the study area is carried out based on the overall modeling idea of multi-scale and multi type.For the karst cave reservoir,the sensitive characteristic attribute to the karst response is optimized,the cut-off value is obtained through analysis,the training image is established based on the characteristic attribute,and the modeling is carried out with the well seismic data as the hard data and the cave development probability body as the soft data constraint.Through manual interpretation of seismic data,a large-scale fracture model is established,and ant tracking technology is used for deterministic modeling of medium-scale fractures.For small-scale fractures,density fitting function is used,and ant body is used for random modeling.By fusing multiple models with assign-ment of apposition conditions method,the three-dimensional geological model of fracture vuggy carbonate reservoir in Yijianfang formation of Yueman block is established.
The load-shedding culvert reduces the earth pressure at the top of the culvert by changing the load transfer path of the fill.However,under the long-term load,the EPS plate in the fill and the load-shed-ding hole will creep with time,the stress mechanism of the culvert will change,and the theoretical calcula-tion method of earth pressure under the long-term load is also unknown.In order to explore the theoretical calculation method of earth pressure under short-term and long-term load,the mechanical mechanism mod-el of the load-shedding culvert was established when only two soil columns formed above the load-reducing hole and the culvert side were considered,and the calculation formula of earth pressure on the culvert top under short-term load was derived.Then,considering the creep effect of soil and EPS plate,the calculation methods of culvert top earth pressure under three cases of soil creep,EPS plate creep and soil and EPS plate both creep are deduced.The calculation results are compared with the numerical simulation results,and the correctness of the theoretical formula is verified.
Taking the five-span continuous rigid-frame bridge with high and low piers with the span of(82.5+220+290+220+82.5)m as the research object,the finite element software is used to simulate and analyze its stress and deformation in this essay.The analysis results show that by changing the height difference of the middle pier,the span is symmetrical and the pier height varies.Under the premise that the load on the main beam remains unchanged and under the action of the temperature load,the pier height difference of this bridge should be controlled within 30~40 m.At this time it is conducive to the deformation control and force distribution of the bridge.When the location of the bridge not meet the height difference demand,other relevant measures should be taken to make the bridge force distribution reasonably.The analysis and calculation results could provide reference for the design and construction of other similar bridges.