
This paper presents an improved model for pedestrian crossing time that is used to establish preliminary guidelines for lateral clearance needs on railroad-highway grade crossings. The improved model includes new elements that are lacking in existing models such as pedestrian observation-reaction time, length of pedestrian unit, and safety margin. A general model for the required lateral clearance, that is applicable to any number of tracks on crossings located on horizontal curves or on tangent sections, was developed. The model can be used to determine the required lateral clearance to the right and to the left of the crossing, including maximum lateral clearance, its location, and lateral clearance at a specified location. A comparison of pedestrian crossing sight distance with intersection (vehicle) sight distance shows that lateral clearance needs for pedestrians are not generally satisfied by those currently available for vehicles. The presented design guidelines promote pedestrian safety and should be of interest to highway and railroad professionals. (C) 2017 American Society of Civil Engineers.
Decision making about transport infrastructure investment is based on the net impacts and risks to the community. The private sector is often involved in toll road projects, including various schemes to design, build, operate and/or finance the project either in a partnership with a host government, independently, or in some combination. Cost-Benefit Analysis of a privately operated toll road require careful allocations of project impacts, in order to properly reflect the net impacts and risks to the community from the host government’s perspective. This study investigates whether alternative assumptions are valid from differing perspectives, when toll roads are delivered and operated privately rather than by a host government. Treatments of tolls and other toll road project related payments are considered from different perspectives. Cost-Benefit Analysis is conducted for a synthesised toll tunnel project case by considering alternating treatments of some impacts. This leads to the exploration of analyses outcomes when the treatment of tolls differ when two perspectives of “toll as a transfer payment” and “toll as an end user cost” are considered. Various scenarios are explored including public versus private operations. The Monte Carlo simulation approach is used to account the risks of variables in the analysis. The synthesised case study revealed that, for privately operated toll roads, treating toll charges as a transfer payment, and alternatively as an end user cost, can both be valid approaches but from two perspectives. Moreover, the analysis outcomes under different perspectives are particularly helpful to make decisions on the basis of the impacts and risks solely from the perspective of the host government. The proposed methodology can examine various scenarios other than the ones examined in this study and is extremely useful in the project evaluation of privately operated toll road projects.
This study introduces a new methodology for signal timing optimization that is carried out by adjusting green splits of a.m. peak, p.m. peak, and rest of the day timing plans for each signalized intersection in the urban street network without changing the existing cycle length and signal coordination to minimize total vehicle and pedestrian delays per cycle. It contains a basic model that handles vehicle delays only and an enhanced model that simultaneously addresses vehicle and pedestrian delays using two different pedestrian delay estimation methods. Both models are incorporated into a high fidelity simulation-based regional travel demand forecasting model for detailed traffic assignments. A computational study is performed for methodology application using data on Chicago metropolitan area travel demand, traffic counts, geometric designs, and signal timing plans for major intersections in the Chicago central business district (CBD) area. A sensitivity analysis is conducted in the application of the enhanced model to examine the impacts of assigning different weights to vehicle and pedestrian delays on intersection vehicle travel time and delay reductions after signal timing optimization. The computational experiment reveals that after systemwide signal timing optimization, vehicle delays in the CBD area could reduce by 13% when considering only vehicle delays and by 5% when simultaneously considering vehicle and pedestrian delays.
The design of urban bus transit systems aims to determine a network configuration with a set of bus lines and associated frequencies that achieve the targeted objective. This paper presents a methodology framework to formulate and solve the bus transit network design problem (TNDP). It first proposes a TNDP taking into account the travel time stochasticity. A robust optimization model is formulated for the proposed problem, which aims to minimize the sum of the expected value of the operator cost and its variability multiplied by a weighting value. A heuristic solution approach, based on k-shortest path algorithm, simulated annealing algorithm, Monte Carlo simulation, and probit-type discrete choice model, is subsequently developed to solve the robust optimization model. Finally, the proposed methodology is applied to a numerical example. (C) 2013 American Society of Civil Engineers.