This paper introduced the construction technology of pile patching,caps and middle cross beam reinforcement of the International Trade Bridge in Beijing.The pile patching method is applying pile reinforcement to bridge pier foundation,which means building a 1.5 m diameter pile in each north and south side of the bridge original cap.Building new caps is to spray concrete in steel net,set bolt anchor on the wall of foundation pit based on slope excavation,lift and install the girder for flanged beam lifting,and band reinforcement bar and cast concrete at the bottom of original cap.Reinforcing middle cross beam is to add two steel piles on both sides of the bridge piers in order to support steel cap beam which can support cross beams with adjustable force basin rubber pedestal and convert single-point-support to three-points-support so as to improve the beam force condition,and reinforce the steel beams by pasting the steel plates so as to enhance the beam shear capacity.
文章分析了《工程材料》课程的特点,并结合笔者的经验,分析了《工程材料》课程改革的主要内容,总结了《工程材料》课程行之有效的教学方法。
结合南京长江大桥南引桥施工实例,介绍了移动模架(Moving Support System)的组成,施工原理及主要性能,指出应用移动模架法施工可以保证施工质量和加快施工进度。
本文阐述了高职人才培养模式的基本含义,探讨了以就业为导向的高职人才培养模式,以校企合作办学为基本途径,实施"订单教育"。
At the basis of analysis on influencing factors of collapsibility of loessal foundation,it is subjected that the collapsibile deformation should be thought of as a system that many factors worked and influenced together,especially a grey system..Thus the grey incidence analysis method can be applied to collapsibility of loessal foundation.and it is cheerful that the method works so well that some useful results could be attained according to the grey incidence analysis on influencing factors of collapsibility of loessal foundation,results indicat that the void ratio is the superior and steadily influencing factor of collapsibility at all events and other influencing factors will have some different degree of influence.The paper expounds some influencing factors of collapsibility and helps to think correctly some influencing factors in setting up the model of collapsibility.
教师布置统一作业要求学生统一完成,其中有诸多弊端,应当加以改进完善。