首先简要描述了海湾隧道典型地质情况,点明了此地质区间的施工难度,并对环流系统关键元器件进行了针对性分析.通过应用现状的介绍,提出了改进结构的措施,并优化了环流系统操作工艺.对比了优化前后的施工情况,可以得知环流系统的优化改进提高了其应对海湾隧道典型地质的能力.
This article introduced the external insulation technology used as one of important building energy-saving measures,analyzed some insulation technology,and elaborated the quality assurance measures of commonly used external insulation technology with thin layer plaster,to promote the continuous development and innovation of the external wall thermal insulation technology.