针对潜液泵管路共振问题,运用有限元法对一种潜液泵进行预应力模态分析,根据分析结果对潜液泵管路的支撑形式进行优化设计.结果表明,优化设计避免潜液泵工作频率附近主管路的共振,采用振型优化方法可有效降低细长管路的共振对系统的不利影响.
Double-wall steel cofferdam is one of the important construction measures for the deepwater foundation.The structure design and related calculation of double-wall steel cofferdam are emphatically introduced.The structure stress conditions are simulated with finite element software and a strengthen scheme is obtained.The bridge construction is guaranteed.
Platform foundation of cable tower for Chongqing Jialing River Bridge locates in deepwater riverbed.For the platform foundation construction smoothly,the blasting and excavation are proposed for the riverbed.The rock foundation blasting,excavation construction and process are introduced in detail.
In the process of rapid urbanization,preservation and utilization of large scale sites faces great challenge in China,the practice has been enriched and the research has been performed further,whole world has focused on this field as well.Aiming to prompt the practice and theory of preservation and utilization of large scale sites,developing the chinese Characteristic method of preservation and utilization,it is necessary to summarize and typologi-cally.classify the research result of this field,give a brief review of relevant policies and measures,analyze and summarize the current research status of this field,including both the achievement and shortage.It was concluded that the question of large scale sites is the comprehensive question involving every aspect of current society,the scientific outlook of large scale sites,and essential method of establishing the Preservation District of Large Scale Sites to solve the conflicts between the preservation and utilization.
Aim By analyzing of game-theory relations between government and people in Great Site,to make sure it can achieve Nash equilibrium.Methods Game theory,establish Great Site residents′relocation behavior game model.Results Under the assumption of rational person,government and the residents in Great Site reserves will eventually achieving Nash equilibrium.Conclusion With the fixed targets,government can make people move of their own accord and actively cooperate by compensation and resettlement and measures.