随着经济和社会的持续发展,我国的建筑业也进入了一个繁荣发展的黄金时代,不但有很多的施工项目涌现出来,施工规模也在持续地增加,并且还显著地提高了现代化城市建设的总体水准。然而,在建筑工程的建设中,仍然存在着某些污染问题,给周围的自然环境和居民的生活造成了很大的负面影响,只有坚持绿色施工的思想,才能有效地解决上述问题,促进我国的建筑事业朝着专业化、人性化和科学化的方向发展。基于此,本文对绿色施工背景下建筑工程管理的优化措施进行研究,以供参考。
In recent years, energy conservation and emission reduction policies and green environmental protection concept have been paid more and more attention. Relevant industries in infrastructure construction system in China have also actively promoted green building and the corresponding new management mode. This new construction model is mainly renewable energy and clean energy in terms of construction materials. At the same time, major enterprises introduce more advanced management methods to maximize the level of project management. Although new green building management models have gradually become the mainstream, it still lacks practice. This paper will start from the perspective of green building management, combined with the actual projects, summarize and improve the problems, so as to provide a reference for the development of the new management mode.
为精准判断围垦堤防架空隐患的位置和范围,结合探地雷达检测技术的优点,基于时域有限差分法(FDTD),对探地雷达电磁波的传播特征进行数值模拟分析.主要研究时域有限差分法的差分形式、二维空间内的时域差分方程、数值稳定性及吸收边界条件的设定等问题.对围垦堤防可能存在的几种隐患形式进行正演模拟,通过分析雷达电磁波幅值变化,讨论其相应的剖面图像特征,并通过开展室内模拟试验和现场检测工作研究对正演模拟结论进行验证.研究结果表明:正演模拟可实现探地雷达典型形状目标的识别,为提高现场检测图像解释的精度和准确性提供理论参考.
科学技术是第一生产力,BIM技术正随着计算机技术的发展以及建筑全生命周期理论的深化迅速席卷全国,并在多个方面迅猛发展.文章对BIM技术在不同建筑领域的实践应用及影响进行研究,将具体项目与BIM技术相结合,针对现有的工程项目管理中的弊端,从多方面发现并解决问题,从三维模型的角度体现BIM技术在工程项目中的重要作用,探索科学合理的施工进度安排方法,立体化地展现BIM技术在施工进度管理中的实际应用.
沈阳地区为以砂卵(砾)石土层为主,顶进大直径顶管可借鉴的工程经验不多,本文首先从顶管实际的纠偏施工中遇到的问题实际情况的角度,建立了大直径顶管纠偏施工的数值模拟计算模型,并提出了由顶管弯矩为评价指标研究顶管纠偏施工安全性的方法,并对纠偏施工中的土体变形情况进行了预测.研究结果表明,采用数值模拟方法研究顶管顶进中的纠偏施工安全性是可行的,并可以为中继间的合理布置提供参考;值得说明的是,沈阳地区顶管纠偏施工中的纠偏压力宜保持在0.4MPa~0.7MPa.
随着高等教育规模的扩大,在人民得到更多接受高等教育机会的同时,社会各界越来越关注高等教育教学质量问题,相应的教育质量观念也在发生变化.