The CMS detector, including its muon system, has been operating at the CERN LHC in increasingly challenging conditions for about 15 years. The muon detector was designed to provide excellent triggering and track reconstruction for muons produced in proton–proton collisons at an instantaneous luminosity ( ℒ ) of 1 × 10^34 cm ^-2 s ^-1 . During the Run 2 data-taking period (2015–2018), the LHC achieved an instantaneous luminosity of twice its design value, resulting in larger background rates and making the efficient detection of muons more difficult. While some backgrounds result from natural radioactivity, cosmic rays, and interactions of the circulating protons with residual gas in the beam pipe, the dominant source of background hits in the muon system arises from proton–proton interactions themselves. Charged hadrons leaving the calorimeters produce energy deposits in the muon chambers. In addition, high-energy particles interacting in the hadron calorimeter and forward shielding elements generate thermal neutrons, which leak out of the calorimeter and shielding structures, filling the CMS cavern. We describe the method used to measure the background rates in the various muon subsystems. These rates, in conjunction with simulations, can be used to estimate the expected backgrounds in the High-Luminosity LHC. This machine will run for at least 10 years starting in 2029 reaching an instantaneous luminosity of ℒ = 5 ×10^34 cm^-2 s^-1 and increasing ultimately to ℒ = 7.5 ×10^34 cm^-2 s^-1 . These background estimates have been a key ingredient for the planning and design of the muon detector upgrade.
AbstractThe CMS detector, including its muon system, has been operating at the CERN LHC in increasingly challenging conditions for about 15 years. The muon detector was designed to provide excellent triggering and track reconstruction for muons produced in proton–proton collisons at an instantaneous luminosity ($$\mathcal {L}$$ L ) of $$1 \times 10^{34}$$ 1 × 10 34 cm$$^{-2}$$ - 2 s$$^{-1}$$ - 1 . During the Run 2 data-taking period (2015–2018), the LHC achieved an instantaneous luminosity of twice its design value, resulting in larger background rates and making the efficient detection of muons more difficult. While some backgrounds result from natural radioactivity, cosmic rays, and interactions of the circulating protons with residual gas in the beam pipe, the dominant source of background hits in the muon system arises from proton–proton interactions themselves. Charged hadrons leaving the calorimeters produce energy deposits in the muon chambers. In addition, high-energy particles interacting in the hadron calorimeter and forward shielding elements generate thermal neutrons, which leak out of the calorimeter and shielding structures, filling the CMS cavern. We describe the method used to measure the background rates in the various muon subsystems. These rates, in conjunction with simulations, can be used to estimate the expected backgrounds in the High-Luminosity LHC. This machine will run for at least 10 years starting in 2029 reaching an instantaneous luminosity of $$\mathcal {L} = 5 \times \text {10}^\text {34}\,\text {cm}^\text {-2}\,\text {s}^\text {-1}$$ L = 5 × 10 34 cm -2 s -1 and increasing ultimately to $$\mathcal {L} = 7.5 \times \text {10}^\text {34}\,\text {cm}^\text {-2}\,\text {s}^\text {-1}$$ L = 7.5 × 10 34 cm -2 s -1 . These background estimates have been a key ingredient for the planning and design of the muon detector upgrade.
Abstract The CMS detector, including its muon system, has been operating at the CERN LHC in increasingly challenging conditions for about 15 years. The muon detector was designed to provide excellent triggering and track reconstruction for muons produced in proton–proton collisons at an instantaneous luminosity ( $$\mathcal {L}$$ L ) of $$1 \times 10^{34}$$ 1 × 10 34 cm $$^{-2}$$ - 2 s $$^{-1}$$ - 1 . During the Run 2 data-taking period (2015–2018), the LHC achieved an instantaneous luminosity of twice its design value, resulting in larger background rates and making the efficient detection of muons more difficult. While some backgrounds result from natural radioactivity, cosmic rays, and interactions of the circulating protons with residual gas in the beam pipe, the dominant source of background hits in the muon system arises from proton–proton interactions themselves. Charged hadrons leaving the calorimeters produce energy deposits in the muon chambers. In addition, high-energy particles interacting in the hadron calorimeter and forward shielding elements generate thermal neutrons, which leak out of the calorimeter and shielding structures, filling the CMS cavern. We describe the method used to measure the background rates in the various muon subsystems. These rates, in conjunction with simulations, can be used to estimate the expected backgrounds in the High-Luminosity LHC. This machine will run for at least 10 years starting in 2029 reaching an instantaneous luminosity of $$\mathcal {L} = 5 \times \text {10}^\text {34}\,\text {cm}^\text {-2}\,\text {s}^\text {-1}$$ L = 5 × 10 34 cm -2 s -1 and increasing ultimately to $$\mathcal {L} = 7.5 \times \text {10}^\text {34}\,\text {cm}^\text {-2}\,\text {s}^\text {-1}$$ L = 7.5 × 10 34 cm -2 s -1 . These background estimates have been a key ingredient for the planning and design of the muon detector upgrade.
The Gas Electron Multiplier (GEM) detectors of the GE1/1 station of the CMS experiment have been operated in the CMS magnetic field for the first time on the 7(th) of October 2021. During the magnetic field ramps, several discharge phenomena were observed, leading to instability in the GEM High Voltage (HV) power system. In order to reproduce the behavior, it was decided to conduct a dedicated test at the CERN North Area with the Goliath magnet, using four GE1/1 spare chambers. The test consisted in studying the characteristics of discharge events that occurred in different detector configurations and external conditions. Multiple magnetic field ramps were performed in sequence: patterns in the evolution of the discharge rates were observed with these data. The goal of this test is the understanding of the experimental conditions inducing discharges and short circuits in a GEM foil.The results of this test lead to the development of procedure for the optimal operation and performance of GEM detectors in the CMS experiment during the magnet ramps. Another important result is the estimation of the probability of short circuit generation, at 68 % confidence level, p(short)(HV OFF) = 0.42(-0.35)(+0.94)% with detector HV OFF and p(short)(HV OFF) < 0.49% with the HV ON. These numbers are specific for the detectors used during this test, but they provide a first quantitative indication on the phenomenon, and a point of comparison for future studies adopting the same procedure.
The upgrade of the CMS detector for the high luminosity LHC (HL-LHC) will include gas electron multiplier (GEM) detectors in the end-cap muon spectrometer. Due to the limited supply of large area GEM detectors, the Korean CMS (KCMS) collaboration had formed a consortium with Mecaro Co., Ltd. to serve as a supplier of GEM foils with area of approximately 0.6 m2. The consortium has developed a double-mask etching technique for production of these large-sized GEM foils. This article describes the production, quality control, and quality assessment (QA/QC) procedures and the mass production status for the GEM foils. Validation procedures indicate that the structure of the Korean foils are in the designed range. Detectors employing the Korean foils satisfy the requirements of the HL-LHC in terms of the effective gain, response uniformity, rate capability, discharge probability, and hardness against discharges. No aging phenomena were observed with a charge collection of 82 mC cm-2. Mass production of KCMS GEM foils is currently in progress.
The series of upgrades to the Large Hadron Collider, culminating in the High Luminosity Large Hadron Collider, will enable a significant expansion of the physics program of the CMS experiment. However, the accelerator upgrades will also make the experimental conditions more challenging, with implications for detector operations, triggering, and data analysis. The luminosity of the proton-proton collisions is expected to exceed 2-3 x 10(34) cm(-2) s(-1) for Run 3 (starting in 2022), and it will be at least 5 x 10(34) cm(-2) s(-1) when the High Luminosity Large Hadron Collider is completed for Run 4. These conditions will affect muon triggering, identification, and measurement, which are critical capabilities of the experiment. To address these challenges, additional muon detectors are being installed in the CMS endcaps, based on Gas Electron Multiplier technology. For this purpose, 161 large triple-Gas Electron Multiplier detectors have been constructed and tested. Installation of these devices began in 2019 with the GE1/1 station and will be followed by two additional stations, GE2/1 and MEO, to be installed in 2023 and 2026, respectively. The assembly and quality control of the GE1/1 detectors were distributed across several production sites around the world. We motivate and discuss the quality control procedures that were developed to standardize the performance of the detectors, and we present the final results of the production. Out of 161 detectors produced, 156 detectors passed all tests, and 144 detectors are now installed in the CMS experiment. The various visual inspections, gas tightness tests, intrinsic noise rate characterizations, and effective gas gain and response uniformity tests allowed the project to achieve this high success rate.
An estimate of environmental background hit rate on triple-GEM chambers is performed using Monte Carlo (MC) simulation and compared to data taken by test chambers installed in the CMS experiment (GE1/1) during Run-2 at the Large Hadron Collider (LHC). The hit rate is measured using data collected with proton-proton collisions at 13 TeV and a luminosity of 1.5$\times10^{34}$ cm$^{-2}$ s$^{-1}$. The simulation framework uses a combination of the FLUKA and Geant4 packages to obtain the hit rate. FLUKA provides the radiation environment around the GE1/1 chambers, which is comprised of the particle flux with momentum direction and energy spectra ranging from $10^{-11}$ to $10^{4}$ MeV for neutrons, $10^{-3}$ to $10^{4}$ MeV for $\gamma$'s, $10^{-2}$ to $10^{4}$ MeV for $e^{\pm}$, and $10^{-1}$ to $10^{4}$ MeV for charged hadrons. Geant4 provides an estimate of detector response (sensitivity) based on an accurate description of detector geometry, material composition and interaction of particles with the various detector layers. The MC simulated hit rate is estimated as a function of the perpendicular distance from the beam line and agrees with data within the assigned uncertainties of 10-14.5%. This simulation framework can be used to obtain a reliable estimate of background rates expected at the High Luminosity LHC.
After the Phase-2 high-luminosity upgrade to the Large Hadron Collider (LHC), the collision rate and therefore the background rate will significantly increase, particularly in the high η region. To improve both the tracking and triggering of muons, the Compact Muon Solenoid (CMS) Collaboration plans to install triple-layer Gas Electron Multiplier (GEM) detectors in the CMS muon endcaps. Demonstrator GEM detectors were installed in CMS during 2017 to gain operational experience and perform a preliminary investigation of detector performance. We present the results of triple-GEM detector performance studies performed in situ during normal CMS and LHC operations in 2018. The distribution of cluster size and the efficiency to reconstruct high pT muons in proton-proton collisions are presented as well as the measurement of the environmental background rate to produce hits in the GEM detector.
The high-luminosity phase of the Large Hadron Collider (HL-LHC) will result in ten times higher particle background than measured during the first phase of LHC operation. In order to fully exploit the highly-demanding operating conditions during HL-LHC, the Compact Muon Solenoid (CMS) Collaboration will use Gas Electron Multiplier (GEM) detector technology. The technology will be integrated into the innermost region of the forward muon spectrometer of CMS as an additional muon station called GE1∕1. The primary purpose of this auxiliary station is to help in muon reconstruction and to control level-1 muon trigger rates in the pseudo-rapidity region 1.6≤|η|≤2.2. The new station will contain trapezoidal-shaped GEM detectors called GE1∕1 chambers. The design of these chambers is finalized, and the installation is in progress during the Long Shutdown phase two (LS-2) that started in 2019. Several full-size prototypes were built and operated successfully in various test beams at CERN. We describe performance measurements such as gain, efficiency, and time resolution of these prototype chambers, developed after years of R&D, and summarize their behavior in different gas compositions as a function of the applied voltage.
The CMS muon system in the region with 2.03<|η|<2.82 is characterized by a very harsh radiation environment which can generate hit rates up to 144 kHz/cm2 and an integrated charge of 8 C/cm2 over ten years of operation. In order to increase the detector performance and acceptance for physics events including muons, a new muon station (ME0) has been proposed for installation in that region. The technology proposed is Triple—Gas Electron Multiplier (Triple-GEM), which has already been qualified for the operation in the CMS muon system. However, an additional set of studies focused on the discharge probability is necessary for the ME0 station, because of the large radiation environment mentioned above. A test was carried out in 2017 at the Cern High energy AcceleRator Mixed (CHARM) facility, with the aim of giving an estimation of the discharge probability of Triple-GEM detectors in a very intense radiation field environment, similar to the one of the CMS muon system. A dedicated standalone Geant4 simulation was performed simultaneously, to evaluate the behavior expected in the detector exposed to the CHARM field. The geometry of the detector has been carefully reproduced, as well as the background field present in the facility. This paper presents the results obtained from the Geant4 simulation, in terms of sensitivity of the detector to the CHARM environment, together with the analysis of the energy deposited in the gaps and of the processes developed inside the detector. The discharge probability test performed at CHARM will be presented, with a complete discussion of the results obtained, which turn out to be consistent with measurements performed by other groups.
Gas Electron Multiplier (GEM) technology, in particular triple-GEM, was selected for the upgrade of the CMS endcap muon system following several years of intense effort on R&D. The triple-GEM chambers (GE1/1) are being installed at station 1 during the second long shutdown with the goal of reducing the Level-1 muon trigger rate and improving the tracking performance in the harsh radiation environment foreseen in the future LHC operation [1]. A first installation of a demonstrator system started at the beginning of 2017: 10 triple-GEM detectors were installed in the CMS muon system with the aim of gaining operational experience and demonstrating the integration of the GE1/1 system into the trigger. In this context, a dedicated Detector Control System (DCS) has been developed, to control and monitor the detectors installed and integrating them into the CMS operation. This paper presents the slice test DCS, describing in detail the different parts of the system and their implementation.
We present analytical calculations, Finite Element Analysis modelling, and physical measurements of the interstrip capacitances for different potential strip geometries and dimensions of the readout boards for the GE2/1 triple-Gas Electron Multiplier detector in the CMS muon system upgrade. The main goal of the study is to find configurations that minimize the interstrip capacitances and consequently maximize the signal-to-noise ratio for the detector. We find agreement at the 1.5–4.8% level between the two methods of calculations and on the average at the 17% level between calculations and measurements. A configuration with halved strip lengths and doubled strip widths results in a measured 27–29% reduction over the original configuration while leaving the total number of strips unchanged. We have now adopted this design modification for all eight module types of the GE2/1 detector and will produce the final detector with this new strip design.
A temperature monitoring system based on fibre Bragg grating (FBG) fibre optic sensors has been developed for the gas electron multiplier (GEM) chambers of the Compact Muon Solenoid (CMS) detector. The monitoring system was tested in prototype chambers undergoing a general test of the various technological solutions adopted for their construction. The test lasted about two years and was conducted with the chambers being installed in the CMS detector and operated during regular experimental running. In this paper, we present test results that address the choice of materials and procedures for the production and installation of the FBG temperature monitoring system in the final GEM chambers.
Triple-GEM detector technology was recently selected by CMS for a part of the upgrade of its forward muon detector system as GEM detectors provide a stable operation in the high radiation environment expected during the future High-Luminosity phase of the Large Hadron Collider (HL-LHC). In a first step, GEM chambers (detectors) will be installed in the innermost muon endcap station in the 1.6<|η|<2.2 pseudo-rapidity region, mainly to control level-1 muon trigger rates after the second LHC Long Shutdown. These new chambers will add redundancy to the muon system in the η-region where the background rates are high, and the bending of the muon trajectories due to the CMS magnetic field is small. A novel construction technique for such chambers has been developed in such a way where foils are mounted onto a single stack and then uniformly stretched mechanically, avoiding the use of spacers and glue inside the active gas volume. We describe the layout, the stretching mechanism and the overall assembly technique of such GEM chambers.
We present a novel application of Fiber Bragg Grating (FBG) sensors in the construction and characterisation of Micro Pattern Gaseous Detector (MPGD), with particular attention to the realisation of the largest triple (Gas electron Multiplier) GEM chambers so far operated, the GE1/1 chambers of the CMS experiment at LHC. The GE1/1 CMS project consists of 144 GEM chambers of about 0.5 m2 active area each, employing three GEM foils per chamber, to be installed in the forward region of the CMS endcap during the long shutdown of LHC in 2108-2019. The large active area of each GE1/1 chamber consists of GEM foils that are mechanically stretched in order to secure their flatness and the consequent uniform performance of the GE1/1 chamber across its whole active surface. So far FBGs have been used in high energy physics mainly as high precision positioning and re-positioning sensors and as low cost, easy to mount, low space consuming temperature sensors. FBGs are also commonly used for very precise strain measurements in material studies. In this work we present a novel use of FBGs as flatness and mechanical tensioning sensors applied to the wide GEM foils of the GE1/1 chambers. A network of FBG sensors have been used to determine the optimal mechanical tension applied and to characterise the mechanical tension that should be applied to the foils. We discuss the results of the test done on a full-sized GE1/1 final prototype, the studies done to fully characterise the GEM material, how this information was used to define a standard assembly procedure and possible future developments.
The CMS Collaboration plans to equip the very forward muon system with triple-GEM detectors that can withstand the environment of the High-Luminosity LHC. This project is at the final stages of R&D and moving to production. An unprecedented large area of several 100 m2 are to be instrumented with GEM detectors which will be produced in six different sites around the world. A common construction and quality control procedure is required to ensure the performance of each detector. The quality control steps will include optical inspection, cleaning and baking of all materials and parts used to build the detector, leakage current tests of the GEM foils, high voltage tests, gas leak tests of the chambers and monitoring pressure drop vs. time, gain calibration to know the optimal operation region of the detector, gain uniformity tests, and studying the efficiency, noise and tracking performance of the detectors in a cosmic stand using scintillators.
In order to cope with the harsh environment expected from the high luminosity LHC, the CMS forward muon system requires an upgrade. The two main challenges expected in this environment are an increase in the trigger rate and increased background radiation leading to a potential degradation of the particle ID performance. Additionally, upgrades to other subdetectors of CMS allow for extended coverage for particle tracking, and adding muon system coverage to this region will further enhance the performance of CMS.Following an extensive R&D program, CMS has identified triple-foil gas electron multiplier (GEM) detectors as a solution for the first muon station in the region 1.6 < vertical bar eta vertical bar < 2.2, while continuing R&D is ongoing for additional regions. (C) 2016 Published by Elsevier B.V.
This contribution introduces a new type of Micropattern Gaseous Detector, the Fast Timing Micropattern (FTM) detector, utilizing fully Resistive WELL structures. The structure of the prototype will be described in detail and the results of the characterization study performed with an X-ray gun will be presented, together with the first results on time resolution based on data collected with muon/pion test beams.
In this work the design of a constant fraction discriminator (CFD) to be used in the VFAT3 chip for the read-out of the triple-GEM detectors of the CMS experiment, is described. A prototype chip containing 8 CFDs was implemented using 130 nm CMOS technology and test results are shown.
During the future LHC upgrade planned in 2018, the forward endcap region of the CMS muon spectrometer will be upgraded with GEM chambers. GEM technology is able to withstand the radiation environment expected in the forward region. The GE1/1 station will be included in the muon L1 trigger, allowing to keep low p(T) threshold even at high luminosity. Moreover, it will bring detection redundancy in the most critical part of the CMS muon system, along with benefits to muon reconstruction performance.