CompactLight is a Design Study funded by the European Union under the Horizon 2020 research and innovation funding programme, with Grant Agreement No. 777431. CompactLight was conducted by an International Collaboration of 23 international laboratories and academic institutions, three private companies, and five third parties. The project, which started in January 2018 with a duration of 48 months, aimed to design an innovative, compact, and cost-effective hard X-ray FEL facility complemented by a soft X-ray source to pave the road for future compact accelerator-based facilities. The result is an accelerator that can be operated at up to 1 kHz pulse repetition rate, beyond today’s state of the art, using the latest concepts for high brightness electron photoinjectors, very high gradient accelerating structures in X-band, and novel short-period undulators. In this report, we summarize the main deliverable of the project: the CompactLight Conceptual Design Report, which overviews the current status of the design and addresses the main technological challenges.
Conditioning of a metal surface in a high-voltage system is the progressive development of resistance to vacuum arcing over the operational life of the system. This is relevant for accelerator cavities, where high level of performance is only achievable after a long conditioning period. Beyond the accelerator research field, this is an important topic for any technology where breakdowns can cause device failure, either by directly disrupting device operation or by causing cumulative hardware damage.We are developing a direct method to measure the surface resistivity of a metal surface that is being conditioned with a HV DC system by inducing a high frequency (GHz) radio-frequency current in the parallel-plate electrode system. If the system can function as a resonant cavity, the surface resistivity data would be encoded in its quality factor (Q-factor). The changes in the resistivity measured in cryogenic conditions would indicate a formation of dislocations under the surface, something that has been speculated as an important process behind the conditioning.In this paper, we present two modified designs of the electrode system, which will act as a resonant cavity, the results of 3D EM simulations and experimental results regarding the characterization of this resonant system.
The FREIA Laboratory at Uppsala University focuses on superconducting technology and accelerator development. It actively supports the development of the European Spallation Source, CERN, and MAX IV, among others. FREIA has developed test facilities for superconducting accelerator technology such as a double-cavity horizontal test cryostat, a vertical cryostat with a novel magnetic field compensation scheme, and a test stand for short cryomodules. Accelerating cavities have been tested in the horizontal cryostat, crab-cavities cavities in the vertical cryostat, and cryomodules for ESS on the cryomodule test stand. High power radio-frequency amplifier prototypes based on vacuum tube technology were developed for driving spoke cavities. Solid-state amplifiers and power combiners are under development for future projects. We present the status of the FREIA Laboratory complemented with results of recent projects and future prospects.
The FREIA Laboratory at Uppsala University focuses on superconducting technology and accelerator development. It actively supports the development of the European Spallation Source, CERN, and MAX IV, among others. FREIA has developed test facilities for superconducting accelerator technology such as a double-cavity horizontal test cryostat, a vertical cryostat with a novel magnetic field compensation scheme, and a test stand for short cryomodules. Accelerating cavities have been tested in the horizontal cryostat, crab-cavities cavities in the vertical cryostat, and cryomodules for ESS on the cryomodule test stand. High power radio-frequency amplifier prototypes based on vacuum tube technology were developed for driving spoke cavities. Solid-state amplifiers and power combiners are under development for future projects. We present the status of the FREIA Laboratory complemented with results of recent projects and future prospects.
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^-$ collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years.
FREIA (Facility for REsearch and Instrumentation for Accelerator development) Laboratory at Uppsala University, Sweden, is a new facility, inaugurated 2013. Initially FREIA is testing and developing superconducting accelerating cavities and high power RF sources in collaboration with the European Spallation Source (ESS). Later projects include testing of superconducting cavities and magnets for the high luminosity LHC. The high level control, alarm system and archiving is implemented in EPICS. Presently this includes a helium liquefaction plant, a horizontal test cryostat, two high power RF amplifiers, a low level RF system, environment monitoring and safety systems. Some attention will be given to integration of commercially acquired systems as well as the safety system, interlocks and radiation monitoring. The implementation of the EPICS environment follows closely that of ESS and thus can provide a test bench for developments at ESS.
Dielectric Laser Acceleration Setup Design, Grating Manufacturing and Investigations Into Laser Induced RF Cavity Breakdowns
The ability to solve problems is an important ability for scientists as well as engineers and something we identify as a key competence for our students. Problem solving is often examined but still ...
The X-band FEL collaboration is currently designing an X-ray free-electron laser based on X-band acceleration technology. Due to the higher accelerating gradients achievable with X-band technology, a X-band normal conducting linac can be shorter and therefore potentially cost efficient than what is achievable with lower frequency structures. This cost reduction of future FEL facilities addresses the growing demand of the user community for coherent X-rays. The X-band FEL collaboration consists of 12 institutes and universities that jointly work on the preparation of design reports for the specific FEL projects. In this paper, we report on the on-going activities, the basic parameter choice, and the integrated simulation results. We also outline the interest of the X-band FEL collaboration to use the electron linac CALIFES at CERN to test FEL concepts and technologies relevant for the X-band FEL collaboration.
The Compact Linear Collider (CLIC) is a multi-TeV high-luminosity linear e+e- collider under development. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in a staged approach with three centre-of-mass energy stages ranging from a few hundred GeV up to 3 TeV. The first stage will focus on precision Standard Model physics, in particular Higgs and top-quark measurements. Subsequent stages will focus on measurements of rare Higgs processes, as well as searches for new physics processes and precision measurements of new states, e.g. states previously discovered at LHC or at CLIC itself. In the 2012 CLIC Conceptual Design Report, a fully optimised 3 TeV collider was presented, while the proposed lower energy stages were not studied to the same level of detail. This report presents an updated baseline staging scenario for CLIC. The scenario is the result of a comprehensive study addressing the performance, cost and power of the CLIC accelerator complex as a function of centre-of-mass energy and it targets optimal physics output based on the current physics landscape. The optimised staging scenario foresees three main centre-of-mass energy stages at 380 GeV, 1.5 TeV and 3 TeV for a full CLIC programme spanning 22 years. For the first stage, an alternative to the CLIC drive beam scheme is presented in which the main linac power is produced using X-band klystrons.
An exclusive measurement of the decay η → ππγ has been performed at the WASA facility at COSY. The η mesons were produced in the fusion reaction pd→He X at a proton beam momentum of 1.7 GeV/c. Efficiency corrected differential distributions have been extracted based on 13960±140 events after background subtraction. The measured pion angular distribution is consistent with a relative p-wave of the two-pion system, whereas the measured photon energy spectrum was found at variance with the simplest gauge invariant matrix element of η→ ππγ. A parameterization of the data can be achieved by the additional inclusion of the empirical pion vector form factor multiplied by a first-order polynomial in the squared invariant mass of the ππ system.
An e(+)e(-) collider of several TeV energy will be needed for the precision studies of any new physics discovered at the LHC collider at CERN. One promising candidate is CLIC, a linear collider which is based on a two-beam acceleration scheme that efficiently solves the problem of power distribution to the acceleration structures. The phenomenon that currently prevents achieving high accelerating gradients in high energy accelerators such as the CLIC is the electrical breakdown at very high electrical field. The ongoing experimental work within the CLIC collaboration is trying to benchmark the theoretical models focusing on the physics of vacuum breakdown which is responsible for the discharges. In order to validate the feasibility of accelerating structures and observe the characteristics of the vacuum discharges and their eroding effects on the structure two dedicated spectrometers are now commissioned at the high-power test-stands at CERN.First, the so called Flashbox has opened up a possibility for non-invasive studies of the emitted breakdown currents during two-beam acceleration experiments. It gives a unique possibility to measure the energy of electrons and ions in combination with the arrival time spectra and to put that in context with accelerated beam, which is not possible at any of the other existing test-stands.The second instrument, a spectrometer for detection of the dark and breakdown currents, is operated at one of the 12 GHz stand-alone test-stands at CERN. Built for high repetition rate operation it can measure the spatial and energy distributions of the electrons emitted from the acceleration structure during a single RF pulse. Two new analysis tools: discharge impedance tracking and tomographic image reconstruction, applied to the data from the spectrometer make possible for the first time to obtain the location of the breakdown inside the structure both in the transversal and longitudinal direction thus giving a more complete picture of the vacuum breakdown phenomenon. (C) 2016 Elsevier B.V. All rights reserved.
The X-band FEL collaboration is currently designing an X-ray free-electron laser based on X-band acceleration technology. Due to the higher accelerating gradients achievable with X-band technology, a X-band normal conducting linac can be shorter and therefore potentially cost ecient than what is achievable with lower frequency structures. This cost reduction of future FEL facilities addresses the growing demand of the user community for coherent X-rays. The X-band FEL collaboration consists of 12 institutes and universitiesthatjointlyworkonthepreparationofdesignreports for the specific FEL projects. In this paper, we report on the on-going activities, the basic parameter choice, and the integrated simulation results. We also outline the interest of the X-band FEL collaboration to use the electron linac CALIFES at CERN to test FEL concepts and technologies relevant for the X-band FEL collaboration.
We present analytical calculations of the momentum spectrum of the drive beam in (CLIC and) CTF3 after part of its kinetic energy is converted to microwaves used to accelerate the main beam. The resulting expressions can be used to determine parameters of the power conversion process in the PETS structures installed in the Two-beam test stand in CTF3.
The FREIA laboratory is a Facility for REsearch Instrumentation and Accelerator Development at Uppsala University, Sweden, constructed recently to develop and test accelerator components. Initially it will develop the RF system for the spoke cavities of the ESS linac and test prototype spoke cavities at nominal RF power. For this purpose we installed a helium liquefaction plant and will soon recieve a versatile horizontal test cryostat and two 352 MHz RF power stations, one based on two tetrodes and the other on solid state technology. Beyond these developments FREIA will house a neutron generator and plans for a THz FEL are under discussion. FREIA is embedded in the Angstrom physics, chemistry and engineering campus at Uppsala in close proximity to mechanical workshops, clean room with electron microscopes, tandem accelerator and the biomedical center.
We discuss a spectrometer to analyze the electrons and ions ejected from a high-gradient CLIC accelerating structure that is installed in the klystron-driven 12 GHz test-stand at CERN. The charged particles escaping the structure provide useful information about the physics of the vacuum breakdown within a single RF pulse. The spectrometer consists of a dipole magnet, a pepper-pot collimator, a fluorescent screen and a fast camera. This enables us to detect both transverse parameters such as the emittance and longitudinal parameters such as the energy distribution of the ejected beams. We can correlate these measurements with e.g. the location of the breakdown inside the structure, by using information from the measured RF powers, giving in that way a complete picture of the vacuum breakdown phenomenon. The spectrometer was installed during Spring 2014 and will be commissioned during Summer 2014.