The longitudinal compression of high-intensity, space-charge-dominated proton bunches is a critical requirement for future proton-driven muon colliders. We propose a proton bunch compression experiment at the Integrable Optics Test Accelerator (IOTA) storage ring at Fermilab to investigate optimal radio-frequency (RF) cavity parameters and lattice configurations. IOTA is a compact, fixed-energy storage ring dedicated to beam physics Research and Development and capable of circulating a 2.5 MeV proton beam under extreme space-charge conditions. Using the ImpactX code with its 3D space-charge solver, simulations indicate that the bunch length can be rapidly reduced by at least a factor of two without appreciable degradation of transverse beam quality–even in the strong space-charge regime. However, longitudinal defocusing due to the space-charge remains a significant challenge in short-pulsed intense proton bunches, and the optimization of compression under these conditions is discussed.
An overview is given of the methods and preliminary results from dedicated beam studies on three topics conducted over five days in July 2023. In the first study, the Fermilab Booster magnets were held constant at magnetic fields corresponding to the injection energy. The beam loss and emittance growth were observed under varying intensity, tunes, and sextupole resonances. The corresponding beam conditions were also simulated with the MADX-SC code [1]. In the second study, measurements of the vertical half-integer resonance and correction methods are conducted for high-intensity beams ramping in the Booster. Finally, syncho-betatron instabilities are observed during transition-crossing in the Booster under strong space-charge conditions.
We summarize the Fermilab Accelerator Complex Evolution (ACE) Science Workshop, held on June 14-15, 2023. The workshop presented the strategy for the ACE program in two phases: ACE Main Injector Ramp and Target (MIRT) upgrade and ACE Booster Replacement (BR) upgrade. Four plenary sessions covered the primary experimental physics thrusts: Muon Collider, Neutrinos, Charged Lepton Flavor Violation, and Dark Sectors. Additional physics and technology ideas were presented from the community that could expand or augment the ACE science program. Given the physics framing, a parallel session at the workshop was dedicated to discussing priorities for accelerator R\&D. Finally, physics discussion sessions concluded the workshop where experts from the different experimental physics thrusts were brought together to begin understanding the synergies between the different physics drivers and technologies. In December of 2023, the P5 report was released setting the physics priorities for the field in the next decade and beyond, and identified ACE as an important component of the future US accelerator-based program. Given the presentations and discussions at the ACE Science Workshop and the findings of the P5 report, we lay out the topics for study to determine the physics priorities and design goals of the Fermilab ACE project in the near-term.
In preparation for PIP-II, there has been interest in running the Fermilab Booster at a higher current more indicative of the PIP-II era operation. In July 2023, an experiment was performed to study collective instabilities over the transition crossing at the Fermilab Booster. Over the transition crossing, the synchrotron tune becomes small and synchro-betatron instabilities become possible. During the experiment, an intensity threshold was observed, above which a dipole instability with losses concentrated in the tail of the bunch. These losses are consistent with the Convective Instability.
he PIP-II proton accelerator will provide the intensity sufficient to power a new generation of high energy facilities at Fermilab. Extension of that linac to higher energy with following acceleration and bunching rings could provide the intensity needed to feed a muon production target for a high-energy $\mu^{+} - \mu^{-}$ collider. Scenarios using a rapid-cycling synchrotron or an $\sim$8 GeV Linac are presented and discussed. Some near-term opportunities at Fermilab for muon collider R&D are introduced.
recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.
The Fermilab Proton-Improvement-Plan-II (PIP-II) is being implemented in order to support the precision neutrino oscillation measurements at the Deep Underground Neutrino Experiment, the U.S. flagship neutrino experiment. The PIP-II LINAC is presently under construction and is expected to provide 800 MeV protons with 2 mA current. This white paper summarizes the outcome of the first workshop on May 10 through 13, 2023, to exploit this capability for new physics opportunities in the kinematic regime that are unavailable to other facilities, in particular a potential beam dump facility implemented at the end of the LINAC. Various new physics opportunities have been discussed in a wide range of kinematic regime, from eV scale to keV and MeV. We also emphasize that the timely establishment of the beam dump facility at Fermilab is essential to exploit these new physics opportunities.
aFor Snowmass and P5, Fermilab recently proposed a new upgrade plan known as Accelerator Complex Evolution (ACE) to occur after PIP-II upgrade in tandem with DUNE/LBNF operation. The first phase of ACE, ACE-MIRT, is the ACE Main Injector Ramp and Targetry upgrade, which would raise the LBNF beam power from 1.2 MW to 2 MW by shortening the Main Injector cycle time to around 0.65s. The second phase of ACE, AC-BR, is the ACE Booster Replacement, which would replace the Booster with a new machine and achieve 2.4 MW for DUNE/LBNF. The implications for the Fermilab neutrino program and future experiments hosted at Fermilab will be discussed.
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a mega-watt, GeV-scale beam dump facility and to LBNF/DUNE. Designs for proton accumulator rings are being studied to bunch the PIP-II protons into the short pulses needed for neutrino and low-mass dark matter experiments. PIP2-BD is a proposed 100-ton LAr scintillation-only experiment, whose detector design is inspired by CENNS-10 and CCM, that would have world-leading sensitivities to BSM physics, including low-mass dark matter produced in the PIP-II proton beam dump.
We develop and solve a constrained optimization model to identify an integrable optics rapid-cycling synchrotron lattice design that performs well in several capacities. Our model encodes the design criteria into 78 linear and nonlinear constraints, as well as a single nonsmooth objective, where the objective and some constraints are defined from the output of Synergia, an accelerator simulator. We detail the difficulties of the 23-dimensional simulation-constrained decision space and establish that the space is nonempty. We use a derivative-free manifold sampling algorithm to account for structured nondifferentiability in the objective function. Our numerical results quantify the dependence of solutions on constraint parameters and the effect of the form of objective function.
A new Proton Accumulator Ring is being proposed as a future upgrade to the Fermilab Complex for new physics experiments.This ring will extract the beam from the Linear accelerator at 0.8 GeV and then inject into the PIP-II Booster ring, enabling a 0.8 -1.0 GeV upgrade.While studying the beam op cs of the current Booster ring, a preliminary la ce design of the Proton Accumulator Ring was transcribed from an older version of Methodical Accelerator Design to a more recent version (MAD-X).A successful transla on of the ring op cs is verified by a comparison of the twiss outputs between both versions of the program.
DUNE/LBNF constitutes an international multi-decadal physics program for leading-edge neutrino science and proton decay studies [1] and is expected to serve as the flagship particle experiment based at Fermilab.
Proton beam dumps are prolific sources of mesons enabling a powerful technique to search for vector mediator coupling of dark matter to neutral pion and higher mass meson decays. By the end of the decade the PIP-II linac will be delivering up to 1 MW of proton power to the FNAL campus. This includes a significant increase of power to the Booster Neutrino Beamline (BNB) which delivers 8 GeV protons to the Short Baseline Neutrino (SBN) detectors. By building a new dedicated beam dump target station, and using the SBN detectors, a greater than an order of magnitude increase in search sensitivity for dark matter relative to the recent MiniBooNE beam dump search can be achieved. This modest cost upgrade to the BNB would begin testing models of the highly motivated relic density limit predictions and provide novel ways to test explanations of the anomalous excess of low energy events seen by MiniBooNE.
This white paper presents opportunities afforded by the Fermilab Booster Replacement and its various options. Its goal is to inform the design process of the Booster Replacement about the accelerator needs of the various options, allowing the design to be versatile and enable, or leave the door open to, as many options as possible. The physics themes covered by the paper include searches for dark sectors and new opportunities with muons.
Fermilab has submitted two Snowmass whitepapers on a future 2.4 MW upgrade for DUNE/LBNF featuring a 2 GeV extension of the PIP-II linac and the construction of a new rapid-cycling-synchrotron. This paper summarizes the relationship between these two scenarios, emphasizing the commonalities and tracing the differences to their original design questions. In addition to a high-level summary of the two 2.4 MW upgrade scenarios, there is a brief discussion of staging, beamline capabilities, subsequent upgrades, and relevant R&D. We are proposing a vigorous program to address various challenges associated with each scenario and to down-select the concept, most suitable to provide proton beams for years to come.
Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilabs Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast transverse instabilities caused by electron cloud effects. According to the experience in the Recycler, the electron cloud gradually builds up over multiple turns in the combined function magnets and can reach final intensities orders of magnitude greater than in a pure dipole. Since the Booster synchrotron also incorporates combined function magnets, it is essential to discover any existence of an electron cloud. And if it does, its effects on the PIP-II era Booster and its mitigating techniques. As the first step, the presence or absence of the electron cloud was investigated using the clearing bunch technique. This paper presents experimental details and observations of the bunch-by-bunch tune shifts of beams with various bunch train structures at low and high intensities and simulation results conducted using PyECLOUD.