The thermionic gridded gun is described which generates short electron bunches for further acceleration in a Nb3Sn conduction cooled SRF linac. The gun is built into the first cavity of the 250 keV injector [1] for the 20 kW, 10 MeV, 1.3 GHz CW conduction cooled one-cavity linac. The beam current is 2 mA. The RF gun design is presented as well as the results of perveance measurements, which are in a good agreement with the design parameters. The design of the RF resonator of the gun is presented also. The beam generated by the gun is matched to the injector to provide lack of current interception in the SRF cavity.
After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.
The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the internal components. Of particular concern is the coupler ceramic window and surrounding brazes, which will see stresses during an excitation event. Since the antenna design is new, and because of the setback failure would create, a cyclic stress test was devised for the antenna. This paper presents the experimental methods, setup, and results of the test.
Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-II linac and accelerates it to ~ 2 GeV in a 650 MHz SRF linac, and then accelerates to ~8 GeV in an SRF pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.
The United States has a rich history in high energy particle accelerators and colliders — both lepton and hadron machines, which have enabled several major discoveries in elementary particle physics. To ensure continued progress in the field, U.S. leadership as a key partner in building next generation collider facilities abroad is essential; also critically important is to prepare to host an energy frontier collider in the U.S. once the construction of the LBNF/DUNE project is completed. In this paper, we briefly discuss the ongoing and potential U.S. engagement in proposed collider projects abroad and present a number of future collider options we have studied for hosting an energy frontier collider in the U.S. We also call for initiating an integrated national R&D program in the U.S. now, focused on future colliders.
Fundamental 325 MHz power couplers are designed, built and tested for SSR cavities in PIP-II project [1]. Couplers should work in CW mode at power level 7.5kW w/o beam and ~15 kW with the 2 mA beam. At pre-production stage we built and tested 6 couplers, produced by CPI (FNAL) and PMB (IJCLab) and 4 more couplers will be tested soon. Two of tested couplers had TiN coated ceramic window. In warm test stand two couplers were mounted on the coupling chamber and tested in SW regime at full reflection with phase controlled by position of short and reflection insert. Couplers were tested at pulse mode (up to 25kW) and cw mode (12kW) with HV bias or without bias. Test results demonstrated that 3.5 kV DC bias completely suppresses multipactor in coupler. Vacuum activity in coupler was controlled by e-pickups and build-in vacuum gauges, located near the vacuum side of window. Power processing without DC bias was done for several couplers with and without TiN coating on ceramic window. Test results are presented and discussing in paper.
recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.
Low Beta 650 MHz cryomodule (ppLB650 CM). This paper presents the pHB650 CM lessons learned and experiences gathered from the design to the lower coldmass assembly and how this cryomodule has a positive impact on all the next Proton Improvement Plan-II (PIP-II) cryomodules due to the standardization set up among SSR and 650 cryomodules.
The LCLS-II-HE project is an upgrade to the Linac Coherent Light Source facility at SLAC National Accelerator Laboratory. Fermilab is part of the LCLS-II-HE collaboration and will deliver 14 cryomodules to SLAC for LCLS-II-HE. These cryomodules consist of eight 1.3 GHz 9-cell cavities. Cryomodule production is in progress, and four cryomodules have been delivered to SLAC. One of the cryomodules already delivered is the verification cryomodule that reached 200 MV total voltage in continuous wave mode. Status of cryomodule production, and lessons learned will be presented. Fermilab is also designing a buncher cryomodule as part of a low emittance injector design for the project. The design is near completion, and status will be reported.
Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life cycle, including design, manufacturing, and assembly, along with the lessons learned at each stage.
650 MHz fundamental power couplers were developed for PIP-II project to deliver RF power for low-beta and high-beta elliptical cavities. Few prototypes were built and tested and after some modification we built 8 pre-production couplers (with few spares for vacuum side) for HB650 cryomodule. All couplers were successfully tested in pulse mode (up to 100kW) and in CW mode (up to 50kW) in test stand at full reflection at 8 phases. In baseline configuration with DC bias we do not see any multipactoring activity after short processing. We also tested power processing without bias for uncoated and TiN coated ceramic window. Results of these studies presented in this paper. One of the coupler was assembled on LB650 cavity and tested at cryogenic environment in STC cryostat at ~20kW power with full reflection at different reflection phase. We also demonstrated good result from power processing without bias for warm and cold cavity. Six couplers were assembled on HB650 cavities in pre-production cryomodule. Test results from cryomodule qualification is discussing in this paper.
An eight-cavity, 1.3 GHz, SLAC linac coherent light source II High Energy cryomodule was assembled and tested at Fermilab to verify performance before the start of production. Its cavities were processed with a novel nitrogen doping treatment to improve gradient performance. The cryomodule was tested with a modified protocol to process sporadic quenches, which were observed in Linac Coherent Light Source II production cryomodules and are attributed to multipacting. Dedicated vertical test experiments support the attribution to multipacting. The verification cryomodule achieved an acceleration voltage of 200 MV in continuous wave mode, corresponding to an average accelerating gradient of 24.1 MV/m, significantly exceeding the specification of 173 MV. The average Q0 (3.0 x 1010) also exceeded its specification (2.7 x 1010). After processing, no field emission was observed up to the maximum gradient of each cavity. This paper reviews the cryomodule performance and discusses operational issues and mitigations implemented during the several month program.
Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning, and the lessons learned at each stage.
Radio frequency superconductivity is a cornerstone technology for many future HEP particle accelerators and experiments from colliders to proton drivers for neutrino facilities to searches for dark matter. While the performance of superconducting RF (SRF) cavities has improved significantly over the last decades, and the SRF technology has enabled new applications, the proposed HEP facilities and experiments pose new challenges. To address these challenges, the field continues to generate new ideas and there seems to be a vast room for improvements. In this paper we discuss the key research directions that are aligned with and address the future HEP needs.
power. Each of these developments has been individually proven and an effort is underway at the Illinois Accelerator Research Center at Fermilab to integrate them into the first prototype of an entirely new class of industrial SRF-based accelerators. These accelerators will enable robust, turn-key operation with very high electrical efficiency. The accelerator prototype under design will be capable of 10 MeV beam, CW operation, and 250 kW of electron beam power. These modular systems are small enough to be palletized and transported to the point of use. Their high electrical efficiency mean that portable power generation systems can be enable their use in mobile applications. The goal is a compact, cost-effective, high-power accelerator suitable for many of the applications covered by this conference. Fermilab is actively working to build the prototype. The end-product will be a commercially available, robust, turn-key system for applications requiring reliable electron beam or X-ray irradiation. Keywords: accelerator, applications, conduction-cooling, cryogen-free, industrial, super-conducting RF.
The United States has a rich history in high energy particle accelerators and colliders – both lepton and hadron machines, which have enabled several major discoveries in elementary particle physics. To ensure continued progress in the field, U.S. leadership as a key partner in building next generation collider facilities abroad is essential; also critically important is the exploring of options to host a future collider in the U.S. The "Snowmass" study and the subsequent Particle Physics Project Prioritization Panel (P5) process provide the timely opportunity to develop strategies for both. What we do now will shape the future of our field and whether the U.S. will remain a world leader in these areas. In this white paper, we briefly discuss the US engagement in proposed collider projects abroad and describe future collider options for the U.S. We also call for initiating an integrated R&D program for future colliders.
We present the technical and engineering design of a medium energy (10 MeV) and high average power (1000 kW) electron-beam accelerator intended for irradiation treatment of high-volume industrial and municipal wastewater. The accelerator uses a Nb3Sn superconducting radio-frequency (SRF) cavity for producing the high average beam power with >90% rf to beam efficiency. The design of the accelerator is tailored for industrial settings by adopting the cryocooler conduction-cooling technique for the SRF cavity instead of a conventional liquid helium bath cryosystem. The technical design is supplemented with a detailed analysis of capital and operating cost of the accelerator. The designed accelerator can treat up to 12 million gallons per day of wastewater, requires capital of ???$8 M for construction, and has ???13.5 ??/ton/kGy in material processing cost.