Arc suppression Snubbers offer safety in high energy superconducting magnet systems. Large superconducting magnets may have arcing across their breakers at the moment of slow dump initiation resulting from a sudden current redistribution in the powering circuit. The ATLAS Experiment at CERN experiences such arcing with its 7.3 H Toroidal magnet powering circuit. To discharge the magnets, the current is redistributed to a parallel branch called the Run Down Unit (RDU) by means of a breaker. Due to the physical layout and other metallic components in the vicinity, the power supply and RDU branches have undesirable and unavoidable parasitic inductance, causing a voltage spike over the main breakers at the moment of opening. The resulting arcing deteriorates the breaker contacts, resulting in increased operating temperatures and a more frequent need for maintenance. The arc suppression system developed takes the form of an RC Snubber (Resistor-Capacitor). The Snubber offers the current a low-impedance path, thus smoothing out the current redistribution and suppressing the voltage spike. This initial charging period of the capacitors gives the current enough time to overcome the parasitic inductance, therefore allowing the RDU to smoothly ramp up without a sudden voltage spike. To test the concept, a 1/50th scale demonstrator was developed and showed successful results. After the demonstrator, endurance testing of the electrolytic capacitors was performed to ensure no degradation of the charging characteristics for an equivalent of 20 years of operation. The Snubber was manufactured and implemented with successful results on the ATLAS Toroidal powering circuit.
The WAGASCI experiment being built at the J-PARC neutrino beam line will measure the difference in cross sections from neutrinos interacting with a water and scintillator targets, in order to constrain neutrino cross sections, essential for the T2K neutrino oscillation measurements. A prototype Magnetised Iron Neutrino Detector (MIND), called Baby MIND, is being constructed at CERN to act as a magnetic spectrometer behind the main WAGASCI target to be able to measure the charge and momentum of the outgoing muon from neutrino charged current interactions.
The Baby MIND spectrometer is designed to measure the momentum and charge of muons from neutrino interactions in water and hydrocarbon targets at the J-PARC T59 (WAGASCI) experiment. The WAGASCI experiment will measure the ratio of neutrino charged current interaction cross-sections on water and hydrocarbon aiming at reducing systematic errors in neutrino oscillation analyses at T2K. Construction of the Baby MIND detector within the CERN Neutrino Platform framework was completed in June 2017, where it underwent full commissioning and characterization on a charged particle beam line at the Proton Synchrotron experimental hall.
Baby MIND is a new downstream muon range detector for the WGASCI experiment. This article discusses the distributed readout system and its timing requirements. The paper presents the design of the synchronization subsystem and the results of its test.
T2K (Tokai-to-Kamioka) is a long-baseline neutrino experiment in Japan designed to study various parameters of neutrino oscillations. A near detector complex (ND280) is located 280 m downstream of the production target and measures neutrino beam parameters before any oscillations occur. ND280's measurements are used to predict the number and spectra of neutrinos in the Super-Kamiokande detector at the distance of 295 km. The difference in the target material between the far (water) and near (scintillator, hydrocarbon) detectors leads to the main non-cancelling systematic uncertainty for the oscillation analysis. In order to reduce this uncertainty a new WAter-Grid-And-SCintillator detector (WAGASCI) has been developed. A magnetized iron neutrino detector (Baby MIND) will be used to measure momentum and charge identification of the outgoing muons from charged current interactions. The Baby MIND modules are composed of magnetized iron plates and long plastic scintillator bars read out at the both ends with wavelength shifting fibers and silicon photomultipliers. The front-end electronics board has been developed to perform the readout and digitization of the signals from the scintillator bars. Detector elements were tested with cosmic rays and in the PS beam at CERN. The obtained results are presented in this paper.
M. Antonovaa, R. Asfandiyarovb, R. Bayesc, P. Benoitd , A. Blondelb, M. Bogomilove, A. Bross f , F. Cadouxb, A. Cerverag, N. Chikumah, A. Dudarevd , T. Ekelöfi, Y. Favreb, S. Fedotova, S-P. Hallsjöc, A.K. Ichikawa j, A. Izmaylova, Y. Karadzhovb, M. Khabibullina, A. Khotyantseva, A. Kleymenovaa, T. Kogah, A. Kostina, Y. Kudenkoa, V. Likhachevaa, B. Martinezb, R. Mateve, M. Medvedevaa, A. Mefodieva, A. Minaminok, O. Mineeva, G. Mitevl, M. Nessid , L. Nicolab, E. Noah∗b, T. Ovsiannikovaa, H. Pais Da Silvad , S. Parsab, M. Raynerb, G. Rolandob, A. Shaykhieva, P. Simioni, P. Solerc, S. Suvorova, R. Tsenove, H. Ten Kated , G. Vankova-Kirilovae, K. Yasutome j, N. Yershova aInstitute for Nuclear Research of the Russian Academy of Sciences, Moscow, Russia bUniversity of Geneva, Section de Physique, DPNC, Geneva, Switzerland cUniversity of Glasgow, School of Physics and Astronomy, Glasgow, UK dEuropean Organization for Nuclear Research, CERN, Geneva, Switzerland eUniversity of Sofia, Department of Physics, Sofia, Bulgaria f Fermi National Accelerator Laboratory, Batavia, Illinois, USA gIFIC (CSIC & University of Valencia), Valencia, Spain hUniversity of Tokyo, Tokyo, Japan iUppsala University, Uppsala, Sweden jKyoto University, Kyoto, Japan kYokohama National University, Yokohama, Japan lInstitute for Nuclear Research and Nuclear Energy, Bulgarian Academy of Sciences, Sofia,
The system of superconducting toroids in the ATLAS experiment at CERN consists of three magnets. The Barrel Toroid was assembled and successfully tested in 2006. Next, two End-Cap Toroids have been tested on surface at 77 K and installed in the cavern, 100-m underground. The End Cap Toroids are based on Al stabilized Nb-Ti/Cu Rutherford cables, arranged in double pancake coils and conduction cooled at 4.6 K. The nominal current is 20.5 kA at 4.1 T peak field in the windings and the stored energy is 250 MJ per toroid. Prior to final testing of the entire ATLAS Toroidal system, each End Cap Toroid passed a commissioning test up to 21 kA to guarantee a reliable performance in the final assembly. In this paper the test results are described. It includes the stages of test preparation, isolation vacuum pumping and leak testing, cooling down, step-by-step charging to full current, training quenches and quench recovery. By fast discharges the quench detection and protection system was checked to demonstrate a safe energy distribution within the magnet after a quench or a triggered fast dump.
The ATLAS Experiment at LHC, CERN will utilize a large, superconducting, air-cored toroidal magnet system with a long Barrel Toroid and two End Cap Toroids. Each End Cap Toroid contains eight racetrack coils mounted as a single cold mass in a cryostat vessel of approximately 10 m diameter and 5 m length. The operating current is 20.5 kA at 0.25 GJ stored energy and a peak field of 4.1 T in the windings. This paper presents the status of the End Cap Toroid Project. Final integration of the two cold masses, 120 tons each, into their respective vacuum cryostats is described. The specialized techniques, procedures and tooling infrastructure required for these operations are explained. Pre-installation cooldown to 85 K is reported. Installation of the toroids in the ATLAS cavern 100 m underground will be described. The final interfacing to the Barrel Toroid and services in the cavern will be reviewed along with preparations for final test and commissioning.
Each superconducting coil of the ATLAS Barrel Toroid has to pass the commissioning tests on surface before the installation in the underground cavern for the ATLAS Experiment at CERN. Particular acceptance criteria have been developed to characterize the individual coils during the on-surface testing. Based on these criteria and the limited time of the test, a compressed test program was proposed and realized. In only a few cases some additional tests were required to justify the coil performance and acceptance. In this paper the analysis of the test results is presented and discussed with respect to the acceptance criteria. Some differences in the parameters found between the identical coils are analyzed in relation to coil production features
The Barrel Toroid (BT) provides the magnetic field for the muon detectors in the ATLAS experiment at CERN. The Toroid is built up from eight superconducting coils. Each coil consists of two 25 m times 5 m racetrack shape double pancakes impregnated and pre-stressed inside an aluminum coil casing. The 42-tons cold mass is cooled by forced-flow liquid helium circulating in aluminum pipes glued to its surface. The coils are tested on surface prior to their underground installation. The test program has started in September 2004 and finished in June 2005. This paper describes the test set up and various commissioning tests performed at the ATLAS Magnet Test Facility. It includes the aspects of test preparation, vacuum pumping, leak testing, cooling down, powering and warming up. The 8 coils have passed the tests successfully and have been assembled into the Toroid in the ATLAS cavern. The testing completes the production of the so far largest racetrack coils in the world
The Superconducting Barrel Toroid is providing (together with the two End-Cap Toroids not presented here) the magnetic field for the muon detectors in the ATLAS Experiment at the LHC at CERN. The toroid with outer dimensions of 25 m length and 20 m diameter, is built up from 8 identical racetrack coils. The coils with 120 turns each are wound with an aluminum stabilized NbTi conductor and operate at 20.5 kA at 3.9 T local field in the windings and is conduction cooled at 4.8 K by circulating forced flow helium in cooling tubes attached to the cold mass. The 8 coils of 25 m /spl times/ 5 m are presently under construction and the first coils have already been fully integrated and tested. Meanwhile the assembly of the toroid 100 m underground in the ATLAS cavern at CERN has started. The 8 coils are individually tested on surface before installation. In this paper the test of the first coil, unique in size and manufacturing technology, is described in detail and the results are compared to the previous experience with the 9 m long B0 model coil.