尾矿库对区内生态环境造成严重破坏,对尾矿库进行全面压盖,复垦种植,恢复其生态功能,保护域内生态环境.
Xinli mine shaft is a newly built large gold mine shaft,there are many produce levels.Since its putting into production,ventilating effect isn't ideal.Through the analysis to the measurement data of ventilation resistance,we put forward technical transformation measure of ventilating system and carry on the technique economic demonstration to optimize ventilating system under the shaft,thus the aim of constructing an economic energy type mine is achieved.