普通货运;公共停车场;港口与航道工程施工,室内外装饰装潢工程设计及施工,房屋建筑工程施工、市政公用工程施工、水利水电工程施工、地基与基础工程施工、钢结构工程专业承包、机电设备安装工程专业承包、预拌商品混凝土生产、混凝土预制构件生产;码头和其他港口设施经营;在港区内从事货物装卸、驳运、仓储经营;港口机械、设施、设备租赁、维修经营;船舶港口服务业务经营;建筑材料试验,船舶修理、租赁,起重机械安装、维修(道路运输许可证,建设部门核发生产许可证,水路运输服务许可证,特行许可证 有效期限以许可证为准);货物及技术进出口;建筑材料批发零售;物业管理;食品经营。(依法须经批准的项目,经相关部门批准后方可开展经营活动)
In order to ensure the safe and efficient construction of large cantilever prestressed capping beams and improve the construction quality of viaduct projects,this paper studies different support systems combined with engineering cases,by comparing the construction efficiency,social benefit and economic benefit of three kinds of cover beam support,it provides important reference for the selection of large cantilever prestressed cover beam support under different environment.
In the reconstruction project of Nanxun to Wuxing section of 318 National Highway, the main bridge of Baimitang Bridge adopts the design of three-span continuous beams. The main technical problems in the construction are as follows: the span and width of the bridge deck are larger than that of the conventional continuous beams, the force is more complex, and the design and processing of hanging basket template are difficult. In continuous beam construction, basket design and construction monitoring are the key links, and linear control is the priority among priorities. In this paper, combined with the construction of the continuous beam of the main bridge of Baimidang Bridge, the design and construction monitoring methods of the hanging basket template are expounded,the successful completion of handover and acceptance of the closure has a strong reference significance for similar projects.