• 学术搜索
  • 科研智能体
    • Research Labs
    • AI 阅读
    • AI 文库
    • 深度研究
    • 学者亮点
  • 学术资源
    • AI2000
    • 期刊/会议
    • 学者库
    • 学术API
    • 溯源树
    • 数据集
  • 知识沉淀
    • 学术空间
订阅小程序
旧版功能
aminer vip
开通会员低至0.73元/天
一次搞定AI科研
立即登录
  • English
  • 联系方式
    C

    Constructions industrielles de la Méditerranée

    企业
    12论文总数
    251引用总数

    CNIM is a French equipment manufacturer and industrial contractor operating on a worldwide basis. The group supplies products and services to major public and private sector organisations, local authorities and national governments in the environment, energy, defence, and high technology markets. Founded in 1856, CNIM is a medium-sized company. CNIM is listed on the Euronext exchange in Paris. It relies on a stable family-based majority shareholding structure committed to its development. The group is headed by Nicolas Dmitrieff, chairman of the management board.The company is also a manufacturer of escalators and moving walks since 1968 primarily for metros and airports, including elevators since 2009 but not very often compared to their escalators and moving walks productions.

    论文量&引用量时间轴

    机构学者

    排序
    Oriano Dormicchi
    Oriano Dormicchi
    ASG Superconductors
    论文:2引用:0H-index:0
    Delphine Keller
    Delphine Keller
    Service de Robotique Interactive, CEA
    论文:2引用:0H-index:0
    L. Gargiulo
    L. Gargiulo
    IRFM, CEA
    论文:2引用:0H-index:0
    Franck Samaille
    Franck Samaille
    Inst Rech Fus Confinement Magnet, CEA
    论文:2引用:0H-index:0
    Louis Doceul
    Louis Doceul
    Atomic Energy and Alternative Energies Commission
    论文:2引用:0H-index:0
    Fabien Ferlay
    Fabien Ferlay
    IRFM, CEA
    论文:2引用:0H-index:0
    Patrick Decool
    Patrick Decool
    Centre d'Etudes Nucleaires de Cadarache, CEA
    论文:2引用:0H-index:0
    J.A. Caballero
    J.A. Caballero
    Facultad de Veterinaria, Universidad de Córdoba
    论文:2引用:0H-index:0
    M. Cornelis
    M. Cornelis
    Fusion For Energy
    论文:2引用:0H-index:0

    论文(12)

    年份
    起
    –
    止
    排序
    1Hemera: the European Community for Advanced Research in the Stratosphere
    Marta Albano,D. Spoto,A. Volpe,Philippe Raizonville,André Vargas, Kristine Dannenberg, Rainer Kirchhartz, Eric Vachon,Felix Friedl-Vallon, Pietro Ubertini, Mattias Abrahamsson, Kjell Boen,

    HEMERA is a large research community which operates in the field of tropospheric and stratospheric balloon-borne research. The Hemera project is aimed to improve the technologies related to the balloons and to favour the research on balloons by offering the opportunity to fly scientific experiment to the international community. The project, described in this paper together with its major outcomes, involves major space agencies dealing with balloon infrastructures, companies operating the balloons, companies providing the necessary technologies and scientific experts.

    2023Aerotecnica Missili & Spazio(2023)引用:1
    引用
    AI阅读
    加入学术空间
    2Modelisation of Chernobyl Membrane
    L. Dufrene, D. Mailhot

    The CNIM group develops and manufactures a range of polyurethane products for severe environments named HARPEX. For everyone of these products CNIM is responsible for their qualification test and modelisation. A major example is Chernobyl's new safe containment, NOVARKA designs the membrane profile and CNIM qualifies, tests and calculates the behaviour of the membrane for various loading conditions.

    2019Constitutive Models for Rubber XI(2019)
    引用
    AI阅读
    加入学术空间
    3Completion and Test of the First ITER TF Coil Winding Pack by Europe
    Alessandro Bonito-Oliva,P. Aprili,E. Barbero Soto,R. Batista,B. Bellesia,E. Boter Robello,J. Caballero,M. Casas Lino,M. Cornelis, M. Damone,R. Harrison,J. Cornella,

    The International Thermonuclear Experimental Reactor (ITER) magnetic system includes 18 toroidal field (TF) coils constructed using Nb3Sn cable-in-conduit superconductor. Each TF coil comprises a winding pack (WP) composed of seven double pancake modules stacked together, impregnated and inserted into a stainless steel coil case. Ten TF coils are being produced in Europe, under the responsibility of Fusion for Energy (F4E, the European Domestic Agency), while the remaining nine TF coils are being produced in Japan. F4E has implemented a strategy dividing the procurement into three packages. One is related to the construction of 70 radial plates (RP), another to the fabrication of 10 WP, and a third to the cold test and coil-case insertion of 10 WP. After 7 years of R&D and qualification activities and of industrial production, the first ITER TF coil WP has been completed in Europe. Factory acceptance tests, including leak, dimensional, and electrical tests at room temperature, were completed in May 2017 and the series production of the remaining nine TF WPs in Europe is underway. The first package has been completed and all 70 RP have been delivered. Commissioning of major tooling for the third package is to be performed at the end of 2017. In this paper, we report on the test of the first TF WP and on the status of the remaining production.

    2018IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY(2018)引用:7
    引用
    AI阅读
    加入学术空间
    4Qualification, Manufacturing and Assembly of the WEST Divertor Structure and Coils
    Louis Doceul,Jerome Bucalossi,Francis Bouquey,Cyril Brun,Patrick Decool, Hubert Dougnac,Fabien Ferlay,Laurent Gargiulo,Delphine Keller,Sebastien Larroque,Roland Le,Manfred Lipa,

    In order to fully validate "ITER-like" actively water cooled tungsten plasma facing units, addressing the issues of long plasma discharges, an axisymmetric divertor structure has been studied and manufactured for the implementation in the WEST (W-Tungsten Environment in Steady state Tokamak) tokamak platform. This assembly, called divertor structure and coils (4 m diameter, 20 t), is composed of two stainless steel casings containing an actively water cooled (up to 180 degrees C, 4 MPa) copper winding pack designed for a conductor current in the range of 12.5kA (up to 1000s). It must sustain harsh environmental conditions in terms of ultra-high vacuum, high temperatures and electrodynamic loads. One major difficulty is the assembly by induction brazing of individual bended conductor sectors inside the vacuum vessel and the consecutive sealing of the casings by TIG welding. Therefor development activities have been carried out on a scale one dummy coil, such as brazing, assembly, thermal cycling and electrical insulation tests (5 kV ground voltage). Whereas the brazing assembly technics and the conductor installation were validated without major difficulties, different technical solutions for the electrical insulation had to be tested. The chosen solution is a resin epoxy impregnated fiber glass fabric layered around the conductors followed by a polymerization procedure. In parallel the manufacturing of divertor structure components started in the second half of 2013 with a total delivery at the end of 2015. The paper will illustrate the technical developments which have been performed in order to fully validate the design. It concerns mainly the dummy coil and the complex conductor installation procedureassisted by virtual reality tools. The manufacturing methods proposed by industry in order to fulfil the technical requirements will be also addressed. Finally the processes and associated tools used in order to implement this large component inside the WEST vacuum vessel will be detailed. (C) 2017 Elsevier B.V. All rights reserved.

    2017Fusion Engineering and Design(2017)引用:6
    引用
    AI阅读
    加入学术空间
    5Progress in the F4e Procurement of the Eu Iter Tf Coils
    A. Bonito Oliva,E. Barbero Soto,R. Batista,B. Bellesia,E. Boter Robello,J. Buskop,J. Caballero,M. Casas Lino,M. Cornelis,J. Cornella,D. Kleiner,C. Kostopoulos,

    The ITER magnetic system includes 18 Toroidal Field (TF) Coils constructed using Nb3Sn cable-in-conduit superconductor. Each TF coil comprises a Winding Pack (WP) composed of 7 Double Pancake (DP) modules stacked together, impregnated and inserted into a stainless steel coil case. Fusion for Energy [the European Domestic Agency (DA)] is responsible for the procurement of the ten while the Japanese DA is responsible for remaining nine coils. The conductors are being produced by 6 different DAs, while the coil cases only by the Japanese DA. F4E has implemented a procurement strategy aimed to minimize costs and risks, consisting of subdividing the procurement into three main procurement packages, each foreseeing first an R&D and qualification phase. One procurement package is related to the construction of 72 radial plates (RP), another to the fabrication of the ten WP, and a third to the cold test and coil-case insertion of ten WP. In collaboration with industry, F4E has successfully produced two RP prototypes. Regarding the DP, the construction of the first DP prototype has started. In this paper, we will report on the results achieved so far and the status of each of the procurement packages.

    2016IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY(2016)引用:22
    引用
    AI阅读
    加入学术空间
    立即登录,查看全部 12 篇论文

    合作机构(16)

    Canadian Economics Association合作论文 2
    Banque Nationale de Gènes合作论文 2
    克莱蒙-奥弗涅大学合作论文 1
    Centre National d''Études Spatiales合作论文 1
    American Scandinavian Foundation合作论文 1
    Canadian Space Agency合作论文 1
    意大利空间机构合作论文 1
    Swedish Space Corporation合作论文 1
    土伦大学合作论文 1
    斯洛伐克科学院合作论文 1

    机构统计