CNIM is a French equipment manufacturer and industrial contractor operating on a worldwide basis. The group supplies products and services to major public and private sector organisations, local authorities and national governments in the environment, energy, defence, and high technology markets. Founded in 1856, CNIM is a medium-sized company. CNIM is listed on the Euronext exchange in Paris. It relies on a stable family-based majority shareholding structure committed to its development. The group is headed by Nicolas Dmitrieff, chairman of the management board.The company is also a manufacturer of escalators and moving walks since 1968 primarily for metros and airports, including elevators since 2009 but not very often compared to their escalators and moving walks productions.
HEMERA is a large research community which operates in the field of tropospheric and stratospheric balloon-borne research. The Hemera project is aimed to improve the technologies related to the balloons and to favour the research on balloons by offering the opportunity to fly scientific experiment to the international community. The project, described in this paper together with its major outcomes, involves major space agencies dealing with balloon infrastructures, companies operating the balloons, companies providing the necessary technologies and scientific experts.
The CNIM group develops and manufactures a range of polyurethane products for severe environments named HARPEX. For everyone of these products CNIM is responsible for their qualification test and modelisation. A major example is Chernobyl's new safe containment, NOVARKA designs the membrane profile and CNIM qualifies, tests and calculates the behaviour of the membrane for various loading conditions.
The International Thermonuclear Experimental Reactor (ITER) magnetic system includes 18 toroidal field (TF) coils constructed using Nb3Sn cable-in-conduit superconductor. Each TF coil comprises a winding pack (WP) composed of seven double pancake modules stacked together, impregnated and inserted into a stainless steel coil case. Ten TF coils are being produced in Europe, under the responsibility of Fusion for Energy (F4E, the European Domestic Agency), while the remaining nine TF coils are being produced in Japan. F4E has implemented a strategy dividing the procurement into three packages. One is related to the construction of 70 radial plates (RP), another to the fabrication of 10 WP, and a third to the cold test and coil-case insertion of 10 WP. After 7 years of R&D and qualification activities and of industrial production, the first ITER TF coil WP has been completed in Europe. Factory acceptance tests, including leak, dimensional, and electrical tests at room temperature, were completed in May 2017 and the series production of the remaining nine TF WPs in Europe is underway. The first package has been completed and all 70 RP have been delivered. Commissioning of major tooling for the third package is to be performed at the end of 2017. In this paper, we report on the test of the first TF WP and on the status of the remaining production.
In order to fully validate "ITER-like" actively water cooled tungsten plasma facing units, addressing the issues of long plasma discharges, an axisymmetric divertor structure has been studied and manufactured for the implementation in the WEST (W-Tungsten Environment in Steady state Tokamak) tokamak platform. This assembly, called divertor structure and coils (4 m diameter, 20 t), is composed of two stainless steel casings containing an actively water cooled (up to 180 degrees C, 4 MPa) copper winding pack designed for a conductor current in the range of 12.5kA (up to 1000s). It must sustain harsh environmental conditions in terms of ultra-high vacuum, high temperatures and electrodynamic loads. One major difficulty is the assembly by induction brazing of individual bended conductor sectors inside the vacuum vessel and the consecutive sealing of the casings by TIG welding. Therefor development activities have been carried out on a scale one dummy coil, such as brazing, assembly, thermal cycling and electrical insulation tests (5 kV ground voltage). Whereas the brazing assembly technics and the conductor installation were validated without major difficulties, different technical solutions for the electrical insulation had to be tested. The chosen solution is a resin epoxy impregnated fiber glass fabric layered around the conductors followed by a polymerization procedure. In parallel the manufacturing of divertor structure components started in the second half of 2013 with a total delivery at the end of 2015. The paper will illustrate the technical developments which have been performed in order to fully validate the design. It concerns mainly the dummy coil and the complex conductor installation procedureassisted by virtual reality tools. The manufacturing methods proposed by industry in order to fulfil the technical requirements will be also addressed. Finally the processes and associated tools used in order to implement this large component inside the WEST vacuum vessel will be detailed. (C) 2017 Elsevier B.V. All rights reserved.
The ITER magnetic system includes 18 Toroidal Field (TF) Coils constructed using Nb3Sn cable-in-conduit superconductor. Each TF coil comprises a Winding Pack (WP) composed of 7 Double Pancake (DP) modules stacked together, impregnated and inserted into a stainless steel coil case. Fusion for Energy [the European Domestic Agency (DA)] is responsible for the procurement of the ten while the Japanese DA is responsible for remaining nine coils. The conductors are being produced by 6 different DAs, while the coil cases only by the Japanese DA. F4E has implemented a procurement strategy aimed to minimize costs and risks, consisting of subdividing the procurement into three main procurement packages, each foreseeing first an R&D and qualification phase. One procurement package is related to the construction of 72 radial plates (RP), another to the fabrication of the ten WP, and a third to the cold test and coil-case insertion of ten WP. In collaboration with industry, F4E has successfully produced two RP prototypes. Regarding the DP, the construction of the first DP prototype has started. In this paper, we will report on the results achieved so far and the status of each of the procurement packages.