• 学术搜索
  • 科研智能体
    • Research Labs
    • AI 阅读
    • AI 文库
    • 深度研究
    • 学者亮点
  • 学术资源
    • AI2000
    • 期刊/会议
    • 学者库
    • 学术API
      MCP&Skill
    • 溯源树
    • 数据集
  • 知识沉淀
    • 学术空间
订阅小程序
旧版功能
aminer vip
开通会员低至0.73元/天
一次搞定AI科研
立即登录
  • English
  • 联系方式
    P

    Private Machines (United States)

    企业EST. 2011
    33论文总数
    121引用总数

    论文量&引用量时间轴

    机构学者

    论文(33)

    年份
    起
    –
    止
    排序
    1Setup Experience in Commissioning Hydraulic Control System of Turbine K -1200-6,8/50
    V. V. Filatov, A. A. Belyakov, A. A. Sorokin, A. I. Bodrov, A. V. Varzanov, N. S. Volkov

    The construction of new nuclear power plants under the NPP-2006 project required Leningradsky Metallichesky Zavod (LMZ) to implement an electronic and hydraulic turbine regulation and protection system (TRPS) in the design of a large capacity condensing turbine K-1200-6,8/50, based on the experience, design and circuit solutions for a similar system of a high-speed turbine-analogue K-1000-60-3000 manufactured by LMZ. Despite the preservation of the turbine layout in relation to the turbine-analogue (2LP module + HP module + 2LP module), the turbine control concept through the TRPS and the available references at the stage of commissioning of the Novovoronezh NPP-2 power units (before the power unit was turned on to the grid), as experience has shown, there were cases of incorrect operation of the TRPS due to the ambiguity of the assembly or hidden inconsistencies. The elimination of the causes of incorrect operation of hydraulic assemblies is often directly related to the search for the root cause "from the inside", i.e. disassembly of equipment is required. The presented article shows cases of incorrect operation of the TRPS and ways to solve them from the experience of commissioning on a high-capacity turbine K-1200-6,8/50 with a brief description of the problematic TRPS hydraulic components, the amount of refinement of structural elements. The experience of commissioning described in this article is still relevant today due to regular scheduled preventive repairs at commissioned power units of the NPP-2006 project, during which a routine audit of the hydraulic elements of the steam distribution organs is carried out, as well as a pre-start check of the interaction of the hydraulic and electronic parts of the TRPS. In addition, the commissioning of nuclear power plants with turbine K-1200-6,8/50 is currently underway abroad (in People's Republic of Bangladesh) where the described experience can be applied on occasion.

    2025Global Nuclear Safety(2025)
    引用
    AI阅读
    加入学术空间
    2Why Physics? Commentary on Reflection, Representation, and Diffraction in the Analytic Process
    Terry Marks-Tarlow
    2025Psychoanalytic Dialogues(2025)
    引用
    AI阅读
    加入学术空间
    3Future Studies in the Field of Memory and Cognition Based on Astrocytes
    Majid Karimi Baghmaleki

    Since the theory of “astrocytes store for memory and cognition” has no contradiction with new and old scientific achievements in terms of memory and cognition, and it is consistent with both the theory of the involvement of talin proteins and the theory of long-term potentiation (LTP) in synapses, it may solve the upcoming deadlocks (problems) if future studies are conducted focusing on astrocytes instead of neurons.

    2024International Journal of Forensic Research(2024)
    引用
    AI阅读
    加入学术空间
    4Hemolytic Diseases of the Newborn
    A. Abdullah
    2024Clinica Chimica Acta(2024)
    引用
    AI阅读
    加入学术空间
    5Reconstruction of the Chin after Skin Cancer Surgery
    Yumeng Marina Li, Kelley Pagliai Redbord
    2023Atlas of Anatomic Reconstruction After Skin Cancer Surgery(2023)
    引用
    AI阅读
    加入学术空间
    立即登录,查看全部 33 篇论文

    合作机构(25)

    马耳他大学合作论文 1
    西班牙国家研究委员会合作论文 1
    Ivanovo State Power University合作论文 1
    LUdeS University合作论文 1
    约翰·开普勒林茨大学合作论文 1
    国家科学技术发展局合作论文 1
    卢旺天主教大学合作论文 1
    Acumen (organization)合作论文 1
    BioNanoNet合作论文 1
    宾夕法尼亚州立大学合作论文 1

    机构统计