The Royal Institution of Chartered Surveyors (RICS) is a UK-based professional body for surveyors, founded in London in 1868. It works at a cross-governmental level, and aims to promote and enforce the highest international standards in the valuation, management and development of land, real estate, construction and infrastructure.Founded as the Institution of Surveyors, it received a royal charter in 1881, and in 1947 became the Royal Institution of Chartered Surveyors. With a London HQ and regional offices across the United Kingdom, plus international offices, it serves a 134,000-strong membership distributed over nearly 150 countries. The RICS is linked to other national surveying institutions, collaborates with other professional bodies, and, in 2013, was a founder member of a coalition to develop the International Property Measurement Standards (IPMS). It also produces cost information and professional guidance on valuation and other activities.In September 2021, an independent review exposed poor governance practices at the highest levels of the RICS organisation, prompting the resignations of the president, chief executive, interim chair of the governing council, and chair of the management board, in addition to the earlier resignation of the chief operating officer. The report was labelled an "appalling advert for our profession on the world stage". A subsequent review published in June 2022 demanded a "transformation of the institution carried out at pace".
Estate agency is vital to real estate markets, yet regulatory frameworks across the Southern African Development Community (SADC) are fragmented, limiting professional mobility and market integrity. This study compares entry-to-practice requirements for estate agents in 11 English-speaking SADC countries, examining educational qualifications, mentorship duration, age thresholds, and professional assessments. Using a descriptive qualitative approach and archival data from statutory instruments and regulatory authorities, the study identifies significant disparities that create barriers to regional integration and equitable access to practice. Findings highlight the potential of harmonising standards under the SADC Qualifications Framework to standardise competence, recognise prior learning, and enhance consumer protection. The study provides policy-relevant insights to support coordinated professional regulation and strengthen the quality of estate agency services across the SADC region. By generating the first coordinated regional evidence on estate-agency regulation, this study offers empirically grounded insights to support policy harmonization and strengthen professional standards.
This Inquiry provides the first significant examination of the Australian construction sector’s ability to deliver both detached and high-rise housing. It analyses construction workflows, markets, regulation, workforce, technologies and supply chains. The housing construction industry in Australia is at crisis point. The rate of Australia’s detached housing output has been largely static since at least 1980. Apartment construction can lift in response to demand, but output is volatile. There is no overarching strategy aimed at addressing housing construction constraints. This Inquiry provides eight interconnected options for policymakers and industry.
Diffusion language models decode text by iteratively denoising masked token sequences, making the choice of which positions to decode a central inference-time decision. Most training-free decoding strategies use model confidence for position selection, assuming that high-confidence positions are ready to be decoded. In this work, we revisit this assumption by studying when confidence misleads fully non-autoregressive (fully non-AR) decoding. EOT tokens can receive high confidence and cause incomplete generation; inserting a suffix anchor can mitigate this issue but introduces local overconfidence near the anchor, causing anchor-adjacent tokens to be decoded too early. To address these issues, we propose Suffix-Anchored Confidence Modulation, a simple training-free method that inserts a short suffix anchor to encourage response completion and modulates confidence near the anchor according to decoding progress. This preserves the response-completion benefit of suffix anchoring while reducing premature decoding of anchor-adjacent tokens. Across text-only reasoning, vision-language reasoning, and code-generation benchmarks, our method consistently improves confidence-based fully non-AR decoding, outperforms explicit EOT suppression, and preserves the parallel decoding advantage of fully non-AR generation.
Globally, the significance of embodied carbon (EC) and greenhouse gases (GHG) has been acknowledged due to the increased risk of catastrophic climate change. The temperature rise had already reached 1 ℃ in 2017 due to the rising atmospheric CO2 concentration, and it is predicted to increase by 1.5 ℃ in the coming decades. In order to reduce greenhouse gas (GHG) emissions, the Paris Agreement on Climate Change asks for immediate transformational actions. The built environment sector produces around 40
This paper explores professional indemnity (PI) cover for surveyors, particularly in the UK, over the last eight years. It looks at market trends, Royal Institution of Chartered Surveyors requirements and other possible approaches to insurance as a key risk management tool to help protect the finances and reputations of surveying companies, and the surveying profession more broadly. From the UK property and financial markets crash in 2008, to the Edinburgh Schools cases in 2016, to the tragedy at Grenfell Tower in 2017, to concerns about reinforced autoclaved aerated concrete first in the 1990s and again in 2019, the surveying profession has faced — and will always face — numerous challenges that potentially pose a threat to surveying companies’ finances and reputations. PI cover is a key risk management tool that helps to protect surveying companies from these threats, enabling them to continue to deliver crucial surveying services, including in areas of higher risk; it is also, of course, a benefit and comfort for surveyors’ clients. PI cover, however, is provided in the context of a market, which faces its own connected risks and challenges. Sometimes those risks and challenges even lead to partial or full market failure, requiring some form of intervention or correction. In the UK, PI is conventionally provided to surveying companies, covering claims made that are connected to their provision of surveying services. But other possible approaches exist, both in the UK and further afield, such as project insurance. The question to be explored is therefore which model of PI cover is more effective and more resilient, particularly in the face of industry challenges and potential market failures. This article is also included in The Business & Management Collection which can be accessed at https://hstalks.com/ business/.