A new type of ring-imaging Cherenkov detector is being used for hadronic particle identification in the BaBar experiment at the SLAC B Factory (PEP-II). This detector is called DIRC, an acronym for Detection of Internally Reflected Cherenkov (Light). This paper will discuss the construction, operation and performance of the BaBar DIRC in detail.
BABAR, the detector for the SLAC PEP-II asymmetric e+e- B Factory operating at the upsilon 4S resonance, was designed to allow comprehensive studies of CP-violation in B-meson decays. Charged particle tracks are measured in a multi-layer silicon vertex tracker surrounded by a cylindrical wire drift chamber. Electromagentic showers from electrons and photons are detected in an array of CsI crystals located just inside the solenoidal coil of a superconducting magnet. Muons and neutral hadrons are identified by arrays of resistive plate chambers inserted into gaps in the steel flux return of the magnet. Charged hadrons are identified by dE/dx measurements in the tracking detectors and in a ring-imaging Cherenkov detector surrounding the drift chamber. The trigger, data acquisition and data-monitoring systems, VME- and network-based, are controlled by custom-designed online software. Details of the layout and performance of the detector components and their associated electronics and software are presented.
The Lawrence Berkeley National Laboratory (LBNL) is presently designing and building the 2.5 MeV injector for the Spallation Neutron Source (SNS). The design includes various beam intercepting devices such as beam stops and slits. The target power densities can be as high as 500 kW/cm/sup 2/ with a beam stopping range of 25 to 30 microns, producing stresses well above yield in most materials. In order to analyze the induced temperatures and stresses, a finite element model has been developed. The model has been written parametrically to allow the beam characteristics, target material, dimensions, angle of incidence and mesh densities to be easily adjusted. The heat load is applied to the model through the use of a 3-dimensional table containing the calculated volumetric heat rates. The load is based on a bi-gaussian beam shape which is absorbed by the target according to a Bragg peak distribution. The results of several analyses using the SNS Front End beam are presented.
The Lawrence Berkeley National Laboratory (LBNL) is presently designing and building the 2.5 MeV front end for the Spallation Neutron Source (SNS). The front end includes a medium-energy beam transport (MEBT) that carries the 2.5 MeV, 38 mA peak current, H/sup -/ beam from the radiofrequency quadrupole (RFQ) to the drift tube linac (DTL) through a series of 14 electromagnetic quadrupoles, four rebuncher cavities, and a fast traveling wave chopping system. The beamline contains numerous diagnostic devices, including stripline beam position and phase monitors (BPM), toroid beam current monitors (BCM), and beam profile monitors. Components are mounted on three rafts that are separately supported and aligned. The large number of beam transport and diagnostic components in the 3.6 meter-long beam-line necessitates an unusually compact mechanical design.
LBNL-47343 MECHANICAL DESIGN OF THE SNS MEBT* D. Oshatz † , A. DeMello, L. Doolittle, P. Luft, J. Staples, A. Zachoszcz Lawrence Berkeley National Laboratory, Berkeley, CA, USA rebuncher, and one chopper are mounted on the first and third rafts, with the remainder of the components arranged symmetrically on the second raft. Six quadrupoles, the first and last magnets on each raft, incorporate dipole steering to correct for misalignments between rafts. Diagnostic devices located between transport components monitor beam quality during operation and enable tuning of the MEBT itself. Abstract The Lawrence Berkeley National Laboratory (LBNL) is presently designing and building the 2.5 MeV front end for the Spallation Neutron Source (SNS). The front end includes a medium-energy beam transport (MEBT) that carries the 2.5 MeV, 38 mA peak current, H - beam from the radio frequency quadrupole (RFQ) to the drift tube linac (DTL) through a series of 14 electromagnetic quadrupoles, four rebuncher cavities, and a fast traveling wave chopping system. The beamline contains numerous diagnostic devices, including stripline beam position and phase monitors (BPM), toroid beam current monitors (BCM), and beam profile monitors. Components are mounted on three rafts that are separately supported and aligned. The large number of beam transport and diagnostic components in the 3.6 meter-long beamline necessitates an unusually compact mechanical design. 1 PHYSICS REQUIREMENTS The SNS is an accelerator-based user facility that will produce pulsed beams of neutrons for use in scattering experiments. LBNL has designed and is fabricating the Front-End Systems (FES) comprising an ion source, low- energy beam transport (LEBT) with a pre-chopper, 402.5 MHz RFQ, and MEBT. The FES will accelerate a 38 mA, 6% duty factor, H - ion beam to 2.5 MeV for injection into the 1 GeV linac [1]. The MEBT lattice matches the beam from the RFQ through two fast traveling wave choppers into the first tank of the DTL. The 35-cm long choppers perform the final beam chopping that prevents beam from intercepting the septum of the extraction kicker magnet in the accumulator ring during its rise time. A closely spaced lattice with strong focusing is required to minimize emittance growth, due to the nonlinear charge distribution of the beam and the 62-cm drifts required for insertion of the choppers [2]. The layout of the beamline has been optimized to minimize emittance growth while taking into consideration the mechanical implications of closely spaced transport components and diagnostic devices. The MEBT lattice consists of fourteen quadrupole magnets, four rebuncher cavities, two traveling-wave choppers, and a chopper target that intercepts the deflected beam (see Figure 1). Four quadrupoles, one * This work is supported by the Director, Office of Science, Office of Basic Energy Sciences, of the U.S. Department of Energy under Contract No. DE-AC03-76SF00098. daryl_oshatz@lbl.gov Figure 1: The MEBT beamline layout. While the beampipes have clear bore diameters of 3 cm on the first and third rafts, those on the second raft have diameters of 4 cm in order to accommodate the vertically displaced trajectory of the chopped beam. 2 TRANSPORT COMPONENTS Physically compact devices have been devised, with careful consideration for mounting and alignment features in order to accomplish the positional accuracy and tight longitudinal spacing necessitated by the goal of minimal emittance growth. 2.1 Quadrupole Magnets The physical envelope of the quadrupoles was tightly constrained by the available longitudinal space and the fit with the beam position monitors (BPM) and beampipes that it surrounds. The design of the MEBT quadrupole is derived from the Los Alamos National Lab (LANL), prototypes developed for APT [2]. The six magnets on the second raft have bore diameters of 4.2 cm. The remaining magnets on the first and third rafts have bore diameters of 3.2 cm. The magnet cores consist of quadrants machined from 1006 low carbon steel. Dowel pins and bolts, spanning the horizontal and vertical centerlines, index and hold together the four quadrants. After conventional machining of the quadrants and surface grinding of the length-wise planes of each core
The Front End of the Spallation Neutron Source (SNS) extends from the Ion Source (IS), through a 65 keV LEBT, a 402.5 MHz RFQ, a 2.5 MeV MEBT, ending at the entrance to the DTL. The diagnostics suite in this space includes stripline beam position and phase monitors (BPM), toroid beam current monitors (BCM), and an emittance scanner. Provision is included for beam profile measurement, either gas fluorescence, laser-based photodissociation, or a crawling wire. Mechanical and electrical design and prototyping of BPM and BCM subsystems are proceeding. Significant effort has been devoted to packaging the diagnostic devices in minimal space. Close ties are maintained to the rest of the SNS effort, to ensure long term compatibility of interfaces and in fact share some design work and construction. The data acquisition, digital processing, and control system interface needs for the BPM, BCM, and LEBT diagnostic are similar, and we are committed to using an architecture common with the rest of the SNS collaboration.
A dedicated particle identification system based on the Detection of Internally Reflected Cherenkov (DIRC) light will be used in the BaBar detector. We provide an overview of the DIRC concept, design, and expected performance of the production device and a status report on its construction and commissioning. The DIRC is expected to be operating in the BaBar detector on beam line at the PEP-II B Factory in late spring 1999.
The DIRC (acronym for Detection of Internally Reflected Cherenkov (light)) is a new type of Cherenkov ring imaging detector based on total internal reflection that is used for the first time in the BaBar detector at the PEP-II ring of SLAC. The Cherenkov radiators are long rectangular bars made of synthetic fused silica, the photon detector is a water tank equipped with an array of 10,752 conventional photomultipliers. The first year operational experience in the BaBar detector is presented using cosmic data and collision data in the energy region of the /spl Upsi/(4S) resonance.
The DIRC is a new type of Cherenkov imaging device that will be used for the first time in the BABAR detector at the asymmetric B-factory, PEP-II. It is based on total internal reflection and uses long, rectangular bars made from synthetic fused silica as Cherenkov radiator and light guide. The principles of the DIRC ring imaging Cherenkov technique are explained and results from the prototype program are presented. Its choice for the BABAR detector particle identification system is motivated, followed by a discussion of the quartz radiator properties and the detector design.
The Spallation Neutron Source front end comprises a 35-70 mA volume H source, a multi-element electrostatic LEBT including chopping and steering, a 402.5 MHz RFQ with low output emittance and a 2.5 MeV MEBT also including chopping. The beam duty factor is 6%, with possible extension to 12%. This system, along with an LANL-supplied 1 GeV linac and a BNL-supplied storage ring, provides an average beam power of 1-2 MW to an ORNL and ANLsupplied neutron target and beam instruments facility. The current status of the front end design is described, along with results of several R&D projects leading to the final design.
The DIRC, a new type of ring-imaging Cherenkov detector that images internally reflected Cherenkov light, is being constructed as the main hadronic particle identification component of the BABAR detector at SLAC. The device makes use of 5 meter long fused silica (colloquially called quartz) bars, which serve both as the Cherenkov radiators and as light pipes for transmitting the light to an array of photo-multiplier tubes. This paper describes a program of research and development aimed at determining whether bars that meet the stringent requirements of the DIRC can be obtained from commercial sources. The results of studies of bulk absorption of fused silica, surface finish, radiation damage and bulk inhomogeneities are discussed.