The CMS Beam Halo Monitor has been successfully installed in the CMS cavern in LHC Long Shutdown 1 for measuring the machine induced background for LHC Run II. The system is based on 40 detector units composed of synthetic quartz Cherenkov radiators coupled to fast photomultiplier tubes (PMTs). The readout electronics chain uses many components developed for the Phase 1 upgrade to the CMS Hadronic Calorimeter electronics, with dedicated firmware and readout adapted to the beam monitoring requirements. The PMT signal is digitized by a charge integrating ASIC (QIE10), providing both the signal rise time, with few nanosecond resolution, and the charge integrated over one bunch crossing. The backend electronics uses microTCA technology and receives data via a high-speed 5 Gbps asynchronous link. It records histograms with sub-bunch crossing timing resolution and is read out via IPbus using the newly designed CMS data acquisition for non-event based data. The data is processed in real time and published to CMS and the LHC, providing online feedback on the beam quality. A dedicated calibration monitoring system has been designed to generate short triggered pulses of light to monitor the efficiency of the system. The electronics has been in operation since the first LHC beams of Run II and has served as the first demonstration of the new QIE10, Microsemi Igloo2 FPGA and high-speed 5 Gbps link with LHC data.
The CMS Beam Radiation Instrumentation and Luminosity (BRIL) project is composed of several systems providing the experiment protection from adverse beam conditions while also measuring the online luminosity and beam background. Although the readout bandwidth of the Fast Beam Conditions Monitoring system (BCM1F - one of the faster monitoring systems of the CMS BRIL), was sufficient for the initial LHC conditions, the foreseen enhancement of the beams parameters after the LHC Long Shutdown-1 (LS1) imposed the upgrade of the system. This paper presents the new BCM1F, which is designed to provide real-time fast diagnosis of beam conditions and instantaneous luminosity with readout able to resolve the 25 ns bunch structure.
The Beam Radiation Instrumentation and Luminosity Project of the CMS experiment consists of several beam monitoring systems and luminometers. The upgraded Fast Beam Conditions Monitor is based on 24 single crystal diamond sensors with a two-pad metallization and a custom designed readout. Signals for real time monitoring are transmitted to the counting room, where they are received and processed by new back-end electronics designed to measure count rates on LHC collision, beam induced background and activation products to be used to determine the luminosity and the machine induced background. The system architecture and the signal processing algorithms will be presented.
A novel Beam Halo Monitor (BHM) has been designed and built for the CMS experiment at the LHC. It will provide an online, bunch-by-bunch measurement of background particles created by interactions of the proton beam with residual gas molecules in the vacuum chamber or with collimator material upstream of CMS. The BHM consists of two arrays of twenty detectors that are mounted around the outer forward shielding of the CMS experiment. Each detector is comprised of a cylindrical quartz radiator, optically coupled to a fast ultraviolet-sensitive photomultiplier tube from one end and painted black at the opposite end. Particles moving towards the photomultiplier tube will be detected with time resolution of a few nanoseconds, allowing to measure the flux of background particles produced upstream of CMS and suppress signals from collision-induced products. Monte Carlo simulations were performed to optimise the detector design. Prior to installation, the performance of the prototype detectors was measured in test beams quantifying the detector's direction-sensitive response and time resolution. The BHM was installed during the first LHC long shutdown (LS1) and is currently being commissioned. Design considerations, results from the test-beams supporting the design and the installation of the BHM in the CMS are presented.
The objective of the CLIC Test Facility CTF3 is to demonstrate the feasibility issues of the CLIC two-beam technology: the efficient generation of a very high current drive beam, used as the power source to accelerate the main beam to multi-TeV energies with gradients of over 100 MeV/m, and stable drive beam deceleration. Results of successful beam acceleration with over 100 MeV/m energy gain are shown. Measurements of drive beam deceleration over a chain of Power Extraction Structures (PETS) are presented. The achieved RF power levels, the stability of the power production and of the deceleration are discussed. Finally, we give an overview of the remaining issues to be addressed by the end of 2011. Presented at: 2nd International Particle Accelerator Conference, San Sebastian, Spain, 4 9 Sep 2011 Geneva, Switzerland Date 15/09/2011 CLIC – Note – 897
Reference EPFL-ARTICLE-191000doi:10.1016/j.nima.2013.09.005View record in Web of Science Record created on 2013-12-09, modified on 2017-05-12
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration to test the feasibility of the proposed Compact Linear Collider (CLIC) drive beam generation scheme. Central to this scheme is the use of RF deflectors to inject bunches into a delay loop and a combiner ring, in order to transform the initial bunch frequency of 1.5 GHz from the linac to a final bunch frequency of 12 GHz. To do so, the machine's transverse optics must be tuned to ensure beam isochronicity and each ring's length can finally be adjusted with wiggler magnets to a sub millimeter path length accuracy. Diagnostics based on optical streak camera and RF power measurements, in particular frequency bands, have been designed to measure the longitudinal behaviour of the beam during the combination. This paper presents the diagnostics and recent commissioning measurements.
The power source of the Compact LInear Collider (CLIC) relies on the generation and deceleration of a high-intensity electron drive beam. In order to provide the best radio-frequency (RF) to beam-energy transfer efficiency, the electron beam is accelerated using fully loaded RF cavities, which leads to strong beam loading effects resulting in a high-energy transient. The stability of the RF power produced by the drive beam depends on the stability of the drive beam energy and energy spread along the pulse. The control and the monitoring of the time evolution of the beam energy distribution are therefore crucial for the accelerator performance. For this purpose segmented beam dumps, which are simple and robust devices, have been designed and installed at the CLIC Test Facility 3 (CTF3). These devices are located at the end of spectrometer lines and provide horizontal beam profiles with a time resolution better than 10ns. The segmented dumps are composed of parallel, vertical, metallic plates, and are based on the same principle as a Faraday cup: the impinging beam current is read by a fast acquisition channel. Both FLUKA and Geant4 simulations were performed to define the optimum detector geometry for beam energies ranging from 5MeV to 150MeV. This paper presents a detailed description of the different steps of the design: the optimization of the detector spatial resolution, the minimization of the thermal load and the long-term damage resulting from high radiation doses. Four segmented dumps are currently used in the CTF3 complex. Their measured performance and limitations are presented in this paper. Typical beam spectra as measured in the CTF3 linac are also presented along with a description of the RF manipulations needed for tuning the beam energy spectrum.
The CMS Beam and Radiation Monitoring (BRM) group is responsible for monitoring the beam induced background in the CMS cavern. At the present LHC luminosities and 50 ns bunch spacing, beam gas and beam halo events at large radius are measured using the Beam Halo Counters (BHC) [1] system, a scintillator based detector. Owing to an insufficient dynamic range and time resolution, this detector will unfortunately not be able to efficiently monitor beam backgrounds for the present LHC parameters and beyond. Hence an upgraded detector is required, to be operational after “Long shutdown 1” (LS1). The feasibility of monitoring this large radius beam induced background radiation, by detecting Cherenkov light produced in fused quartz, is investigated in this note. This box is only visible in draft mode. Please make sure the values below make sense. PDFAuthor: Marina Giunta PDFTitle: Feasibility study of a Fused Quartz detector for measuring the Machine Induced Background in the CMS cavern PDFSubject: CMS PDF
The Beam Conditions and Radiation Monitoring System (BRM), is installed in CMS to protect the CMS detector from high beam losses and to provide feedback to the LHC and CMS on the beam conditions. The primary detector subsystems are based on either single crystal diamond sensors (BCM1F) for particle counting with nanosecond resolution or on polycrystalline diamonds (BCM2; BCM1L) for integrated signal current measurements. Beam scintillation counters (BSC) are also used during low luminosity running. The detectors have radiation hard front-end electronics and are read out independently of the CMS central data acquisition and are online whenever there is beam in the LHC machine. The various sub-systems exploit different time resolutions and position locations to be able to monitor the beam induced backgrounds and the flux of particles produced during collisions. This paper describes the CMS BRM system and the complementary aspects of the installed BRM sub-detectors to measure both single particle count rates and signal currents originating from beam backgrounds and collision products in CMS.