The US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within this program. After the successful test of the first pre-series cryo-assembly in 2023, two more cryo-assemblies were tested at Fermilab's horizontal test facility. Production overview and the test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies are summarized in this paper. After the first test, to increase the capability of the horizontal test facility, various improvements have been made. These improvements are also described in this paper.
The US HL-LHC Accelerator Upgrade Project (AUP) is fabricating the MQXFA magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC (HL-LHC). This is the first production of Nb3Sn magnets for a particle accelerator, together with the MQXFB magnets for Q2a and Q2b. Here we show status and some results of MQXFA magnets fabrication and vertical test.
In this White Paper for the Snowmass 2021 Process, we propose the establishment of a magnet Leading-Edge technology And Feasibility-directed Program (LEAF Program) to achieve readiness for a future collider decision on the timescale of the next decade. The LEAF Program would rely on, and be synergetic with, generic R&D efforts presently covered - in the US - by the Magnet Development Program (MDP), the Conductor Procurement and R&D (CPRD) Program and other activities in the Office of HEP supported by Early Career Awards (ECA) or Lab Directed R&D (LDRD) funds. Where possible, ties to synergetic efforts in other Offices of DOE or NSF are highlighted and suggested as wider Collaborative efforts on the National scale. International efforts are also mentioned as potential partners in the LEAF Program. We envision the LEAF Program to concentrate on demonstrating the feasibility of magnets for muon colliders as well as next generation high energy hadron colliders, pursuing, where necessary and warranted by the nature of the application, the transition from R&D models to long models/prototypes. The LEAF Program will naturally drive accelerator-quality and experiment-interface design considerations. LEAF will also concentrate, where necessary, on cost reduction and/or industrialization steps.
The MQXFA Quadrupole magnets will be installed in High Luminosity LHC to form the Q1 and Q3 inner triplet optical elements in front of the interaction points 1 (ATLAS) and 5 (CMS). A pair of MQXFA units is assembled in a stainless steel helium vessel, including the end domes, to make the Q1 Cold Mass or the Q3 Cold Mass. The US HL LHC Accelerator Upgrade Project* is responsible for the design, manufacturing and test of the Q1/Q3 Cold Masses and the complete MQXFA magnets. CERN provides the cryostat components and is responsible for integration and installation in HL LHC. The MQXFA quadrupoles have 150 mm aperture, 4.2 m magnetic length, nominal gradient of 132.2 T/m, and coil peak field of 11.3 T. They use Nb_3Sn conductor and a support structure made of segmented aluminum shells pre-loaded by using bladders and keys. This report presents the final design of the MQXFA quadrupole magnets. *Supported by the U.S. Department of Energy, Office of Science, Office of High Energy Physics
The High Luminosity Large Hadron Collider (HL-LHC) is the new flagship project of CERN. First endorsed in 2013 and approved in 2016, HL-LHC is an upgrade of the accelerator aiming to increase by a factor of ten the statistics of the LHC collisions at the horizon of 2035–2040. HL-LHC relies on cutting edge technologies: among them, large aperture superconducting magnets will replace the present hardware to allow a smaller beam size in two interaction points (IPs). The project involves the construction of about 150 magnets of six different types: the quadrupole triplet, two main dipoles and three orbit correctors. The triplet, manufactured at CERN and in the USA, will consist of 30 magnets based on Nb 3 Sn technology, with an operational peak field of 11.4 T. These will be the first quadrupole Nb 3 Sn magnets installed in a particle accelerator. The other five types of magnets, all relying on Nb–Ti technology, present non-trivial challenges in the design and construction; they will be manufactured as part of in-kind contribution under the responsibility of institutes in Japan, China, Spain, and Italy. The project is now in the phase of transition between qualification through short models and prototypes and the beginning of the series construction. In this paper we review the magnet requirements, the reasons for selecting the design, the technological challenges with respect to previous projects, and we summarize the steps that have been taken to validate the baseline.
As part of the Jefferson Lab 12 GeV upgrade, the Hall B CLAS12 system requires two superconducting iron-free magnets - a torus and a solenoid. The physics requirements to maximize space for the detectors guided engineers toward particular coil designs for each of the magnets which, in turn, led to the choice of using conduction cooling. The torus consists of 6 trapezoidal NbTi coils connected in series with an operating current of 3770 A. The solenoid is an actively shielded 5 T magnet consisting of 5 NbTi coils connected in series operating at 2416 A. Within the hall, the two magnets are located in close proximity to each other and are completely covered both inside and outside by particle detectors. Stringent size limitations were imposed for both magnets and introduced particular design and fabrication challenges. This paper describes the design, construction, installation, commissioning, and operation of the two magnets.
In the framework of the High-Luminosity Large Hadron Collider, the installation of a new generation of quadrupole magnets is foreseen on each side of ATLAS and CMS experiments. The new magnets are based on Nb3Sn technology and shall be able to reach an ultimate current of 17.9 kA with a peak field of 12.3 T in the coil. In 2016 and 2017, the first two short models, called MQXFS3 and MQXFS5, have been tested at 4.2 and 1.9 K in the two new test benches at the European Organization for Nuclear Research. This paper presents the result of the quench performance of the two models; the first magnet reached nominal but failed to reach ultimate, showing detraining in one coil. MQXFS5 reached ultimate performance without any detraining phenomena, validating the PIT conductor used for the first time in this magnet program.
Fermilab, in collaboration with CERN, has developed a double-aperture 11-T Nb 3 Sn dipole suitable for the high-luminosity LHC upgrade. During 2012-2014, a 2-m-long single-aperture dipole demonstrator and three 1-m-long single-aperture dipole models were fabricated by FNAL and tested at its Vertical Magnet Test Facility. Collared coils from two of the 1-m-long models were then used to assemble the first double-aperture dipole demonstrator. This magnet had extensive testing in 2015-2016, including quench performance, quench protection, and field quality studies. This paper reports the results of measurements of dynamic effects in the single-aperture and double-aperture 11-T Nb 3 Sn dipoles and compares them with similar measurements in previous NbTi magnets.
This report presents the fabrication and QC data of MQXFS1, the first short model of the low-beta quadrupoles (MQXF) for the LHC High Luminosity Upgrade. It describes the conductor, the coils, and the structure that make the MQXFS1 magnet. Qualification tests and non-conformities are also presented and discussed. The fabrication of MQXFS1 was started before the finalization of conductor and coil design for MQXF magnets. Two strand design were used (RRP 108/127 and RRP 132/169). Cable and coil cross-sections were “first generation”.
The High Luminosity (HiLumi) Large Hadron Collider (LHC) project has, as themain objective, to increase the LHC peak luminosity by a factor five and the integrated luminosity by a factor ten. This goal will be achieved mainly with a new interaction region layout, which will allow a stronger focusing of the colliding beams. The target will be to reduce the beam size in the interaction points by a factor of two, which requires doubling the aperture of the low-beta (or inner triplet) quadrupole magnets. The use of Nb3Sn superconducting material and, as a result, the possibility of operating at magnetic field levels in the windings higher than 11 T will limit the increase in length of these quadrupoles, called MQXF, to acceptable levels. After the initial design phase, where the key parameters were chosen and the magnet's conceptual design finalized, the MQXF project, a joint effort between the U.S. LHC Accelerator Research Program and the Conseil Europeen pour la Recherche Nucleaire (CERN), has now entered the construction and test phase of the short models. Concurrently, the preparation for the development of the full-length prototypes has been initiated. This paper will provide an overview of the project status, describing and reporting on the performance of the superconducting material, the lessons learnt during the fabrication of superconducting coils and support structure, and the fine tuning of the magnet design in view of the start of the prototyping phase.
Fermi National Accelerator Laboratory (Fermilab) fabricated the torus magnet coils for the 12-GeV Hall B upgrade at Jefferson Lab (JLab). The production consisted of six large superconducting coils for the magnet and two spare coils. The toroidal field coils are approximately 2 m × 4 m × 5 cm thick. Each of these coils consists of two layers, each of which has 117 turns of copper-stabilized superconducting cable, which will be conduction cooled by supercritical helium. Due to the size of the coils and their unique geometry, Fermilab designed and fabricated specialized tooling and, together with JLab, developed unique manufacturing techniques for each stage of the coil construction. This paper describes the tooling and manufacturing techniques required to produce the six production coils and the two spare coils needed by the project.
The CLAS12 Torus is a toroidal superconducting magnet, which is part of the detector for the 12-GeV accelerator upgrade at Jefferson Laboratory (JLab). The coils were wound/fabricated by Fermilab, with JLab responsible for all other parts of the project scope, including design, integration, cryostating the individual coils, installation, cryogenics, I&C, etc. This paper provides an overview of the CLAS12 Torus magnet features and serves as a status report of its installation in the experimental hall. Completion and commissioning of the magnet is expected in 2016.
FNAL and CERN are developing a twin-aperture 11-T Nb3Sn dipole suitable for installation in the LHC. This paper describes the design and parameters of the 11-T dipole developed at FNAL for the LHC upgrades in both single-aperture and twin-aperture configurations, and presents details of the constructed dipole models. Results of studies of magnet quench performance, quench protection, and magnetic measurements performed using short 1-m-long coils in the dipole mirror and single-aperture configurations are reported and discussed.
We report on the fabrication, assembly, and test of the Nb3Sn dipole magnet HD2. The magnet, aimed at demonstrating the application of Nb3Sn superconductor in high field accelerator-type dipoles, features a 36 mm clear bore surrounded by block-type coils with tilted ends. The coil design is optimized to minimize geometric harmonics in the aperture and the magnetic peak field on the conductor in the coil ends. The target bore field of 15 T at 4.3 K is consistent with critical current measurements of extracted strands. The coils are horizontally pre-stressed during assembly using an external aluminum shell pre-tensioned with water-pressurized bladders. Axial pre-loading of the coil ends is accomplished through two end plates and four aluminum tension rods. The strain in coil, shell, and rods is monitored with strain gauges during assembly, cool-down and magnet excitation, and compared with 3D finite element computations. Magnet’s training performance, quench locations, and ramp-rate dependence are then analyzed and discussed.
FNAL and CERN are developing a twin-aperture 11-T Nb 3 Sn dipole suitable for installation in the LHC. This paper describes the design and parameters of the 11-T dipole developed at FNAL for the LHC upgrades in both single-aperture and twin-aperture configurations, and presents details of the constructed dipole models. Results of studies of magnet quench performance, quench protection, and magnetic measurements performed using short 1-m-long coils in the dipole mirror and single-aperture configurations are reported and discussed.
FNAL and CERN are performing an R&D program with the goal of developing a 5.5 m long twin-aperture 11 T Nb 3 Sn dipole suitable for installation in the Large Hadron Collider (LHC). An important part of the program is the development and test of a series of short single-aperture and twin-aperture models with a nominal field of 11 T at the LHC nominal current of 11.85 kA and 20% margin. This paper describes design and fabrication features, and test results of a 1 m long single-aperture Nb 3 Sn dipole model tested at FNAL.